650 resultados para road projects
Resumo:
Curves are a common feature of road infrastructure; however crashes on road curves are associated with increased risk of injury and fatality to vehicle occupants. Countermeasures require the identification of contributing factors. However, current approaches to identifying contributors use traditional statistical methods and have not used self-reported narrative claim to identify factors related to the driver, vehicle and environment in a systemic way. Text mining of 3434 road-curve crash claim records filed between 1 January 2003 and 31 December 2005 at a major insurer in Queensland, Australia, was undertaken to identify risk levels and contributing factors. Rough set analysis was used on insurance claim narratives to identify significant contributing factors to crashes and their associated severity. New contributing factors unique to curve crashes were identified (e.g., tree, phone, over-steer) in addition to those previously identified via traditional statistical analysis of Police and licensing authority records. Text mining is a novel methodology to improve knowledge related to risk and contributing factors to road-curve crash severity. Future road-curve crash countermeasures should more fully consider the interrelationships between environment, the road, the driver and the vehicle, and education campaigns in particular could highlight the increased risk of crash on road-curves.
Resumo:
In multi-vehicle motorcycle crashes, the motorcycle rider is less likely to be at-fault but more commonly severely injured than the other road user. Therefore, not surprisingly, crashes in which motorcycle riders are at-fault and particularly the injuries to the other road users in these crashes have received little research attention. This paper aims to address this gap in the literature by investigating the factors influencing the severity of injury to other road users in motorcyclist-at-fault crashes. Five years of data from Queensland, Australia, were obtained from a database of claims against the compulsory third party (CTP) injury insurance of the at-fault motorcyclists. Analysis of the data using an ordered probit model shows higher injury severity for crashes involving young (under 25) and older (60+) at-fault motorcyclists. Among the not at-fault road users, the young, old, and males were found to be more severely injured than others. Injuries to vehicle occupants were less severe than those to pillions. Crashes that occurred between vehicles traveling in opposite directions resulted in more severe injuries than those involving vehicles traveling in the same direction. While most existing studies have analyzed police reported crash data, this study used CTP insurance data. Comparison of results indicates the potential of using CTP insurance data as an alternative to police reported crash data for gaining a better understanding of risk factors for motorcycle crashes and injury severity.
Resumo:
Road safety is a significant public health issue - 1.24m killed each year, 20-50m injured, 91% in rapidly motorising low/mid income countries Decade of Action for Road Safety 2011-2020: - National and local actions: “strengthening the management infrastructure and capacity for technical implementation of road safety activities at the national, regional and global levels” - Capacity as a constraint on a country’s action - Emphasis on knowledge/training – understand principles, promote training and education etc
Resumo:
The Road Safety Remuneration Act 2012 (Cth) (the Act) explicitly enables the Road Safety Remuneration Tribunal to make orders that can impose binding requirements on all the participants in the road transport supply chain, including consignors and consignees at the apex the chain, for the pay and safety of both employee and independent contractor drivers. The tribunal is also specifically empowered to make enforceable orders to reduce or remove remuneration related incentives and pressures that contribute to unsafe work practices in the road transport industry. Recently the tribunal handed down its first order. The article considers whether, and the degree to which, the tribunal has been willing to exercise its explicit power to impose enforceable obligations on consignors and consignees — such as large supermarket chains — at the apex of road transport supply chains. It examines the substance and extent of the obligations imposed by the tribunal, including whether the tribunal has exercised the full range of powers vested in it by the Act. We contend that the tribunal’s first order primarily imposes obligations on direct work providers and drivers without making large, powerful consignors and consignees substantively responsible for driver pay and safety. We argue that the tribunal’s first order could have more comprehensively fulfilled the objectives of the Act by more directly addressing the root causes of low pay and poor safety in the road transport industry.
Resumo:
Public private partnerships (PPP) are widely used for construction project procurement. However, the briefing stage of PPP projects has been largely overlooked, although it has a far-reaching influence throughout the project life cycle. In response, we rectify this by exploring the critical factors involved. A set of 15 procurement-related factors are first identified from the existing literature. Then the effects of four background variables on the factors are tested with Hong Kong government data by an exploratory factor analysis extracting four major dimensions. The relationships between these dimensions and background variables indicate the need to take the background variables into account when ranking the factors. The ranking of the factors is then obtained by considering their weighted importance. Finally, the final practical value of the results is discussed.
Resumo:
In 2011, more than 75,000 people died in road crashes in the ten member countries of the Association of South East Asian Nations (ASEAN) and many times this number sustained long term injuries. Improving road safety outcomes in ASEAN is not only important for the welfare and economic benefit of these countries, but given that a significant proportion of the world's population lives in ASEAN, it will strongly influence whether the aims of the United Nations Decade of Action for Road Safety and the Sustainable Development Goals are reached. Following the ASEAN Senior Transport Officials Meeting in May 2011, the Secretariat requested the Asian Development Bank (ADB) to provide assistance to improve road safety in ASEAN. In response, ADB, funded by the Japan Fund for Poverty Reduction, has funded a package of action to improve road safety in ASEAN, including the development of a new regional road safety strategy. The diversity of the member nations of ASEAN poses significant challenges for the development of the strategy. For example, the road fatality rates per 100,000 population in Malaysia and Thailand are about 5 times greater than in Singapore. In addition, the importance of particular road safety issues varies across the ASEAN countries and for countries which are undergoing rapid motorization, the order of importance may change over the life of the strategy. The development of the ASEAN Regional Road Safety Strategy has adopted the five pillars of road safety of the UN Decade of Action but focused on those aspects which are most relevant at the regional level and where a regional approach will support and facilitate actions taken by individual countries. A draft ASEAN Regional Road Safety Strategy document has been prepared and consultation will further refine its directions and contents. The paper will describe the processes undertaken to identify issues and solutions, the measurement of road safety maturity and behavioural risk factors, and the overall structure and themes of the strategy.
Resumo:
Many countries over the last decade, have used performance-based contracting (PBC) to manage and maintain roads. The implementation of PBC provides additional benefits for the government/public such as cost savings and improved conditions of contracted road assets. In Australia, PBC is already being implemented on all categories of roads: national, state, urban and rural. Australian PBC arrangement is designed to turn over control and responsibility for roadway system maintenance, rehabilitation, and capital improvement projects to private contractors. Contractors’ responsibilities include determination of treatment types, the design, programming and the undertaking of works needed to maintain road networks at predetermined performance levels. Indonesia initiated two PBC pilot projects in 2011, the Pantura Section Demak-Trengguli (7.68 kilometers) in Central Java Province and Section Ciasem-Pamanukan (18.5 kilometers) in West Java Province. Both sections are categorized as national roads. The contract duration for both of these projects is four years. To facilitate a possible way forward, it is proposed to conduct a study to understand Australia's experiences of advancing from pilot projects to nation-wide programs using PBC. The study focuses on the scope of contracts, bidding processes, risk allocation, and key drivers, using relevant PBC case studies from Australia. Recommendations for future PBC deployment nation-wide should be based on more research associated with risk allocation. This will include investigation of standard conditions of contract. Implications of the contract clauses for the risk management strategy to be adopted by contractors. Based on the nature of risks, some are best managed by the project owner. It is very important that all parties involved to be open to the new rules of contract and to convince themselves about the potential increased benefits of the use of PBC. The most recent states of challenging issues were explored and described.
Resumo:
Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.
Resumo:
Heavy metals build-up on urban road surfaces is a complex process and influenced by a diverse range of factors. Although numerous research studies have been conducted in the area of heavy metals build-up, limited research has been undertaken to rank these factors in terms of their influence on the build-up process. This results in limitations in the identification of the most critical factor/s for accurately estimating heavy metal loads and for designing effective stormwater treatment measures. The research study undertook an in-depth analysis of the factors which influence heavy metals build-up based on data generated from a number of different geographical locations around the world. Traffic volume was found to be the highest ranked factor in terms of influencing heavy metals build-up while land use was ranked the second. Proximity to arterial roads, antecedent dry days and road surface roughness has a relatively lower ranking. Furthermore, the study outcomes advances the conceptual understanding of heavy metals build-up based on the finding that with increasing traffic volume, total heavy metal build-up load increases while the variability decreases. The outcomes from this research study are expected to contribute to more accurate estimation of heavy metals build-up loads leading to more effective stormwater treatment design.
Resumo:
The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.
Resumo:
Background and Aims Considerable variation has been documented with fleet safety interventions’ abilities to create lasting behavioural change, and research has neglected to consider employees’ perceptions regarding the effectiveness of fleet interventions. This is a critical oversight as employees’ beliefs and acceptance levels (as well as the perceived organisational commitment to safety) can ultimately influence levels of effectiveness, and this study aimed to examine such perceptions in Australian fleet settings. Method 679 employees sourced from four Australian organisations completed a safety climate questionnaire as well as provided perspectives about the effectiveness of 35 different safety initiatives. Results Countermeasures that were perceived as most effective were a mix of human and engineering-based approaches: - (a) purchasing safer vehicles; - (b) investigating serious vehicle incidents, and; - (c) practical driver skills training. In contrast, least effective countermeasures were considered to be: - (a) signing a promise card; - (b) advertising a company’s phone number on the back of cars for complaints and compliments, and; - (c) communicating cost benefits of road safety to employees. No significant differences in employee perceptions were identified based on age, gender, employees’ self-reported crash involvement or employees’ self-reported traffic infringement history. Perceptions of safety climate were identified to be “moderate” but were not linked to self-reported crash or traffic infringement history. However, higher levels of safety climate were positively correlated with perceived effectiveness of some interventions. Conclusion Taken together, employees believed occupational road safety risks could best be managed by the employer by implementing a combination of engineering and human resource initiatives to enhance road safety. This paper will further outline the key findings in regards to practice as well as provide direction for future research.
Resumo:
There has been a recent spate of high profile infrastructure cost overruns in Australia and internationally. This is just the tip of a longer-term and more deeply-seated problem with initial budget estimating practice, well recognised in both academic research and industry reviews: the problem of uncertainty. A case study of the Sydney Opera House is used to identify and illustrate the key causal factors and system dynamics of cost overruns. It is conventionally the role of risk management to deal with such uncertainty, but the type and extent of the uncertainty involved in complex projects is shown to render established risk management techniques ineffective. This paper considers a radical advance on current budget estimating practice which involves a particular approach to statistical modelling complemented by explicit training in estimating practice. The statistical modelling approach combines the probability management techniques of Savage, which operate on actual distributions of values rather than flawed representations of distributions, and the data pooling technique of Skitmore, where the size of the reference set is optimised. Estimating training employs particular calibration development methods pioneered by Hubbard, which reduce the bias of experts caused by over-confidence and improve the consistency of subjective decision-making. A new framework for initial budget estimating practice is developed based on the combined statistical and training methods, with each technique being explained and discussed.
Resumo:
Reverie I is a large-scale public art work commissioned by the Brisbane City Council for permanent installation on the Gardens Point Road Plinth adjacent to QUT Gardens Point campus in Brisbane. The work forms part of the artist's ongoing exploration of the methodology of self-portraiture and amorphous form. In this work, sculpted curls of hair have been assembled according to contours of its constituent cast panels - their capacity to nest with one another determined the final form of the work. The resulting mass of curls resembles both an oversized wig, a withered mulberry and a leaden cloud to invoke notions of movement, reflection and temporality. From the didactic panel: "The curls of Reverie I are derived from 18th century sculptural portraiture. The twisting forms of the highly styled wig known as a periwig were abstracted and inventive, while also bestowing an air of intellectual authority. Curls also evoke two aspects of this particular site: the erratic movement of water associated with the complex tidal movements of Brisbane River, and a state of mental reflection relevant to both the nearby university grounds (where intellectual work takes place) and the riverside pathway (a site for daydreaming)."
Resumo:
Theories of deliberative politics position grass-roots community members as more than spectators of politics, and instead recognize their capacity for political engagement by discussing and evaluating options in order to make decisions about issues affecting community life. The processes and products of journalism can assist deliberative politics by providing community members with information resources that are vital for understanding the root causes of problems, weighing up competing claims, forming networks around shared concerns, reaching decisions and undertaking action. This article presents the findings of case studies of four community–classroom projects--one each from Australia, New Zealand, the United States and South Africa--that develop the capacity of journalism students to be effective contributors to deliberative politics. The research points to the importance of learning activities that prepare students to work in diverse communities, map significant community places and structures, identify leaders and stakeholders, engage in respectful dialogue about problems and perspectives, and appreciate community frames and values.
Resumo:
The two-year trial of the Queensland minimum passing distance (MPD) road rule began on 7 April 2014. The rule requires motor vehicles to provide cyclists a minimum lateral passing distance of one metre when overtaking cyclists in a speed zone of 60 km/h or less, and 1.5 metres when the speed limit is greater than 60 km/h. This document summarises the evaluation of the effectiveness of the new rule in terms of its: 1. practical implementation; 2. impact on road users’ attitudes and perceptions; and 3. road safety benefits. The Centre for Accident Research and Road Safety – Queensland (CARRS-Q) developed the evaluation framework (Haworth, Schramm, Kiata-Holland, Vallmuur, Watson & Debnath; 2014) for the Queensland Department of Transport and Main Roads (TMR) and was later commissioned to undertake the evaluation. The evaluation included the following components: • Review of correspondence received by TMR; • Interviews and focus groups with Queensland Police Service (QPS) officers; • Road user survey; • Observational study; and • Crash, injury and infringement data analysis.