785 resultados para Sustainable construction
Resumo:
Increasingly, Australian universities are facing the challenges of global education. While overseas students studying in Australia provide the primary source of export earnings for educational institutions, a number of institutions, including QUT, are also involved in international trade in educational services by providing services offshore. This paper discusses driving forces behind moves by Australian universities to enter the international education market. It then briefly describes Queensland University of Technology’s internationalisation strategy. The paper concludes with a case study describing how the School of Construction Management has pioneered the development of offshore courses at QUT. The introduction of the Master of Project Management and Graduate Diploma of Project Management programs in Singapore in November 1993 represented QUT’s first experience in this area. With the experience of 18 months of operation, the School now has the opportunity to reflect on the outcomes of this venture and consider future options.
Resumo:
Project alliancing is a new alternative to traditional project delivery systems, especially in the commercial building sector. The Collaborative Process is a theoretical model of people and systems characteristics that are required to reduce the adversarial nature of most construction projects. Although developed separately, both are responses to the same pressures. Project alliancing was just used successfully to complete the National Museum of Australia. This project was analyzed as a case study to determine the extent to which it could be classified as a “collaborative project”. Five key elements of The Collaborative Process were reviewed and numerous examples from the management of this project were cited that support the theoretical recommendations of this model. In the case of this project, significant added value was delivered to the client and many innovations resulted from the collective work of the parties to the contract. It was concluded that project alliances for commercial buildings offer many advantages over traditional project delivery systems, which are related to increasing the levels of collaboration among a project management team.
Resumo:
Traditional business approaches do not take account of the rapid technological developments underpinning today's world. Further understanding the role of technology and its efficient management to build and maintain a competitive edge in business can allow project managers to more successfully manage organisations, and to adapt to and capitalise on, today’s rapidly changing environment. Strategic Technology Management links engineering, science and management principles to identify, choose, and implement the most effective means of attaining compatibility between internal skills and resources of an organisation and its competitive, economic and social environment. This paper reviews the rationale and the development of a new Strategic Technology Management subject in QUT’s Master of Project Management program. It discusses recent developments in the area of technology management from an international perspective, provides details of the curriculum developed and discusses the experience of completing two years of teaching the new program.
Resumo:
Although relatively few studies have been undertaken analyzing the drivers of performance for construction companies in producing and delivering satisfactory quality of project works, findings from previous research reveal that there is a significant correlation between the company’s organisational culture and the quality performance of contractors. It has also been noted that the nature of organisational culture is a major determinant factor for quality improvement. This paper presents a summary of the results of a pilot study investigating the organisational culture profiles of five Indonesian construction companies. The survey utilizes the Organisational Culture Assessment Instrument (OCAI), which is based on the Competing Values Framework (CVF). This instrument assesses six important and significant traits of organisational culture: dominant characteristics, organisational leadership, management of employees, organisational ‘glue’, strategic emphasis, and criteria of success. These assessed cultural dimensions identify the most close-fitting perspective of a company’s inherent culture drawn from four possible types: clan, adhocracy, market, or hierarchy culture. Further discussion is presented, which describes the companies’ dominant cultural profiles in terms of strength and congruence and how an effective quality management system operates within the dominant culture type. This analysis contributes to the finding that a suitably ‘strong’ organisational culture impacts positively on construction organisation success within its own specific sector.
Resumo:
To be scholarly in learning and teaching is rigorous academic work. It demands: currency and command of both discipline subject matter and educational theory; inquiring, methodical, and reflective approaches; the collection, evaluation and documentation of evidence of learning and teaching efficacy; and, optimally, entails participation in and communication among a community of teaching professionals. This chapter examines the author’s own practice in this regard to explicate the ‘how’ and ‘why’ of scholarly and scholarship approaches, as much as the ‘what’ and ‘where’ of that endeavour. In doing so, this meta‐analysis is made ‘community property’, in the same way that Shulman (1993: 6) exhorted we ‘change the status of teaching from private to community property’ so that teaching might be more greatly valued in the academy.
Resumo:
In Australia as far back as 1993, researchers such as Baladin and Chapmen reported that "18% of the total Australian population and 51% of the population over 60 years of age were identified as having a disability" (2001; p38.2). Statistics such as these are not by any means astonishing, even to members of the general public, and it is widely understood that these are only to increase significantly in our near future. What is particularly surprising however is, in the face of such statistics, the lack of new and creative responses to this demographic shift, particularly by the architecture and construction industries. The common response from a range of sectors seems to be the repetition of a series of models which offer limited, and often undesirable, housing options. It is this against this backdrop, characterized by a lack of original options from mainstream practitioners and relevant government bodies, that the need has arisen to develop alternative models at grass-roots level. This paper reports primarily on the work of one group comprising a not-for-profit organization, a pro-bono design practice group and a local university working together to design a more holistic, emotionally sustainable independent living model of housing for families where a member of the family has a disability. This approach recognizes the limitations of universal design in that it often does not " ... meet all the housing needs that arise for people with moderate to severe disabilities" (Scotts, Margie et al, 2007; p.17). It is hoped that by examining the work of such a collective which is not driven by profit or policy, but rather born with the aim to address first and foremost individual and community need, that better insight can be gained into the real requirements of individuals and families as well as open up a view to new ways of fulfilling them.
Resumo:
Much of the effort of the construction industry is directed towards the provision of services and products, many with substantial long term implications. Systems and procedures have evolved over centuries to provide these services and products, but inefficiencies have developed. One strategy for improving the efficiency of the construction industry is to restructure the systems and procedures which deliver projects so that improved benefits to the end users are provided. In this paper, contemporary systems and procedures for the delivery of projects are reviewed and the roles of the major stakeholders are examined. The recent construction of Woodford Correctional Centre in Queensland is reviewed as a case study in restructuring the delivery process and the lessons learned from this successful project are summarised.
Resumo:
This paper describes and analyses the procurement processes employed in delivering the Sydney Olympic Stadium – arguably the most significant stadia project in the region today. This current high profile project is discussed in terms of a case study into the procurement processes used. Interviews, personal site visits and questionnaires were used to obtain information on the procurement processes used and comments on their application to the project. The alternative procurement process used on this project—Design and Construction within a Build, Own, Operate and Transfer (BOOT) project—is likely to impact on the construction industry as a whole. Already other projects and sectors are following this lead. Based on a series of on-site interviews and questionnaires, a series of benefits and drawbacks to this procurement strategy are provided.The Olympic Stadium project has also been further analysed during construction through a Degree of Interaction framework to determine anticipated project success. This analysis investigates project interaction and user satisfaction to provide a comparable rating. A series of questionnaires were used to collect data to calculate the Degree of Interaction and User Satisfaction ratings.
Resumo:
This chapter draws upon theories of social justice, critical literacy and place-based pedagogies and two research projects to discuss how teachers are working ethically and creatively towards a sustainable and just society in their place(s).
Resumo:
Fourteen sase studies extracted from the final project report - December 2009 Australian Flexible Learning Framework: E-portfolios Community of Practice (Aus) Personal learning plans and ePortfolio (Aus) RMIT University: Introducing ePortfolios (Aus) ePortfolio Practice: ALTC Exchange (Aus) Australian PebblePad User Group (APpUG) (Aus) ePortfolios in the library and information services sector (Aus) PDP and ePortfolios UK (UK) SURF NL Portfolio (Netherlands) University of Canterbury ePortfolio (NZ) AAEEBL: Association for Authentic, Experiential and Evidence-Based Learning (USA) Midlands Eportfolio Group, West Midlands(UK) EPAC: Electronic Portfolio Action and Communication (USA) Scottish Higher Education PDP Forum (UK) Centre for Recording Achievement (CRA)(UK)
Resumo:
Complex surveillance problems are common in biosecurity, such as prioritizing detection among multiple invasive species, specifying risk over a heterogeneous landscape, combining multiple sources of surveillance data, designing for specified power to detect, resource management, and collateral effects on the environment. Moreover, when designing for multiple target species, inherent biological differences among species result in different ecological models underpinning the individual surveillance systems for each. Species are likely to have different habitat requirements, different introduction mechanisms and locations, require different methods of detection, have different levels of detectability, and vary in rates of movement and spread. Often there is a further challenge of a lack of knowledge, literature, or data, for any number of the above problems. Even so, governments and industry need to proceed with surveillance programs which aim to detect incursions in order to meet environmental, social and political requirements. We present an approach taken to meet these challenges in one comprehensive and statistically powerful surveillance design for non-indigenous terrestrial vertebrates on Barrow Island, a high conservation nature reserve off the Western Australian coast. Here, the possibility of incursions is increased due to construction and expanding industry on the island. The design, which includes mammals, amphibians and reptiles, provides a complete surveillance program for most potential terrestrial vertebrate invaders. Individual surveillance systems were developed for various potential invaders, and then integrated into an overall surveillance system which meets the above challenges using a statistical model and expert elicitation. We discuss the ecological basis for the design, the flexibility of the surveillance scheme, how it meets the above challenges, design limitations, and how it can be updated as data are collected as a basis for adaptive management.