544 resultados para building construction
Resumo:
The purpose of this paper is to summarize the outcomes of a detailed research study carried out as part of the fulfilment of a doctoral programme which examined the relationships between, and impacts of organisational culture on construction performance within a Hong Kong context. The research used a mixed methodology approach consisting of an organisational culture survey using an adapted validated and reliable measurement instrument (the Denison Organisational Culture Survey), mini-case studies in four Hong Kong construction companies and correlated the derived culture scores against performance scores measured by the Hong Kong Housing Department Performance Assessment Scoring System (PASS). The significance of the research was to advance knowledge of the importance of organisational culture strength as a performance driver in the construction industry and the further proof of the culture performance links using a set of measures of the latter which were not financially-based. The findings of the research make a contribution to theory by further validating the work by Denison (1990) and others, not only in that a successful link between organisational culture and performance was demonstrated, but it also identifies particular cultural factors in organisations that appear to be significantly responsible for achieving successful outcomes and reveals opportunities for further research into the organisational culture of construction companies Keywords: organisational culture, construction performance, business success.
Resumo:
The construction industry is one of major strategic importance. Its level of productivity has a significant effect on national economic growth. The analysis of published census/biannual surveys of construction by the Department of Statistics of Malaysia shows that Malaysia managed to achieve construction labour productivity growth between 1996 and 2005 despite increases in cost per employee. The decrease in unit labour costs is attributed to the value added improvement per worker through the increase in capital intensity. The marginal decline in capital productivity is due to the gestation period and the overcapacity of the industry. The civil engineering sub-sector recorded the highest labour productivity and is the most labour competitive in terms of unit labour cost and added value per labour cost. The residential sub-sectors recorded greatest change in the productivity indicators between 1996 and 2005.
Resumo:
Productivity is basic statistical information for many international comparisons and country performance assessments. This study estimates the construction labour productivity of 79 selected economies. The real (purchasing power parities converted) and nominal construction expenditure from the Report of 2005 International Comparison Programme published by the World Bank and construction employment from the database of labour statistics (LABORSTA) operated by the Bureau of Statistics of International Labour Organization were used in the estimation. The inference statistics indicate that the descending order of nominal construction labour productivity from high income economies to low income economies is not established. The average construction labour productivity of low income economies is higher than middle income economies when the productivity calculation uses purchasing power parities converted data. Malaysia ranked 50th and 63rd position among the 79 selected economies on real and nominal measurement respectively.
Resumo:
Value Management (VM) has been proven to provide a structured framework, together with other supporting tools and techniques, that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. One of the major success factors of VM in achieving better project objectives for clients is through the provision of beneficial input by multi-disciplinary team members being involved in critical decision-making discussions during the early stage of construction projects. This paper describes a doctoral research proposal based on the application of VM in design and build construction projects, especially focusing on the design stage. The research aims to study the effects of implementing VM in design and build construction projects, in particular how well the methodology addresses issues related to cost overruns resulting from poor coordination and overlooking of critical constructability issues amongst team members in construction projects in Malaysia. It is proposed that through contractors’ early involvement during the design stage, combined with the use of the VM methodology, particularly as a decision-making tool, better optimization of construction cost can be achieved, thus promoting more efficient and effective constructability. The main methods used in this research involve a thorough literature study, semi-structured interviews, and a survey of major stakeholders, a detailed case study and a VM workshop and focus group discussions involving construction professionals in order to explore and possibly develop a framework and a specific methodology for the facilitating successful application of VM within design and build construction projects.
Resumo:
Value Management (VM) has been proven to provide a structured framework, together with supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It is identified at International level as a natural career progression for the construction service provider and as an opportunity in developing leading-edge skills. The services offered by contractors and consultants in the construction sector have been expanding. In an increasingly competitive and global marketplace, firms are seeking ways to differentiate their services to ever more knowledgeable and demanding clients. The traditional demarcations have given way, and the old definition of what contractors, designers, engineers and quantity surveyors can, and cannot do in terms of their market offering has changed. Project management, design and cost and safety consultancy services, are being delivered by a diverse range of suppliers. Value management services have been developing in various sectors in industry; from manufacturing to the military and now construction. Given the growing evidence that VM has been successful in delivering value-for-money to the client, VM would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector. The recently issued VM Circular 3/2009 by the Economic Planning Unit Malaysia (EPU) possibly marks a new beginning in public sector client acceptance on the strength of VM in construction. This paper therefore attempts to study the prospects of marketing the benefits of VM by construction service providers, and how it may provide an edge in an increasingly competitive Malaysian construction industry.
Resumo:
Life-cycle management (LCM) has been employed in the management of construction projects for many years in order to reduce whole life cost, time, risk and improve the service to owners. However, owing to lack of an effective information sharing platform, the current LCM of construction projects is not effectively used in the construction industry. Based upon the analysis of the information flow of LCM, a virutal prototyping (VP)-based communication and collaboration information platform is proposed. Following this, the platform is customized using DASSAULT sofware. The whole process of implementing the VP-based LCM are also discussed and, from a simple case study, it is demonstrated that the VP-based communication and collaboration information platform is an effective tool to support the LCM of construction projects.
Resumo:
Accurate owner budget estimates are critical to the initial decision-to-build process for highway construction projects. However, transportation projects have historically experienced significant construction cost overruns from the time the decision to build has been taken by the owner. This paper addresses the problem of why highway projects overrun their predicted costs. It identifies the owner risk variables that contribute to significant cost overrun and then uses factor analysis, expert elicitation, and the nominal group technique to establish groups of importance ranked owner risks. Stepwise multivariate regression analysis is also used to investigate any correlation of the percentage of cost overrun with risks, together with attributes such as highway project type, indexed cost, geographics location, and project delivery method. The research results indicate a correlation between the reciprocal of project budgets size and percentage cost overrun. This can be useful for owners in determining more realistic decision-to-build highway budget estimates by taking into account the economies of scale associated with larger projects.
Resumo:
This project discusses a component of the research study conducted to provide construction organizations with a generic benchmarking framework to assess their extent of information communication technology (ICT) adoption for building project management processes. It defines benchmarking and discusses objectives of the required benchmarking framework and development of the framework. The study focuses on ICT adoption by small and medium enterprises (SMEs) in the construction industry and with respect to SMEs it is important to understand processes, their indicators, and measures in the local context. Structure of the suggested benchmarking framework has been derived after extensive literature survey and a questionnaire survey conducted in the Indian construction industry. The suggested benchmarking process is an iterative process divided into four stages. It can be implemented at organization and industry levels for rating the construction organizations for ICT adoption and performance measurement. The framework has a generic structure and can be generalized and applied for other countries with due considerations.
Resumo:
Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.
Resumo:
Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.
Resumo:
Construction industry observers tout the use of financial incentives as promoters of motivation and commitment on projects. Yet, little empirical evidence exists concerning their effectiveness. What are the drivers of motivation on construction projects? The reasons that construction project participants are motivated to pursue voluntary incentive goals are examined through four Australian case studies. The results demonstrate the critical role played by project relationships and equitable contract conditions in promoting the effectiveness of financial incentives. In the context of a construction project, this study finds financial incentives to be less important to motivation and performance than relationship enhancement initiatives. This finding is unexpected and has implications for the design of project procurement strategies. These results suggest if project clients ignore the importance of relationship quality between participants, the impact of any financial incentive will be compromised.
Resumo:
The dominant economic paradigm currently guiding industry policy making in Australia and much of the rest of the world is the neoclassical approach. Although neoclassical theories acknowledge that growth is driven by innovation, such innovation is exogenous to their standard models and hence often not explored. Instead the focus is on the allocation of scarce resources, where innovation is perceived as an external shock to the system. Indeed, analysis of innovation is largely undertaken by other disciplines, such as evolutionary economics and institutional economics. As more has become known about innovation processes, linear models, based on research and development or market demand, have been replaced by more complex interactive models which emphasise the existence of feedback loops between the actors and activities involved in the commercialisation of ideas (Manley 2003). Currently dominant among these approaches is the national or sectoral innovation system model (Breschi and Malerba 2000; Nelson 1993), which is based on the notion of increasingly open innovation systems (Chesbrough, Vanhaverbeke, and West 2008). This chapter reports on the ‘BRITE Survey’ funded by the Cooperative Research Centre for Construction Innovation which investigated the open sectoral innovation system operating in the Australian construction industry. The BRITE Survey was undertaken in 2004 and it is the largest construction innovation survey ever conducted in Australia. The results reported here give an indication of how construction innovation processes operate, as an example that should be of interest to international audiences interested in construction economics. The questionnaire was based on a broad range of indicators recommended in the OECD’s Community Innovation Survey guidelines (OECD/Eurostat 2005). Although the ABS has recently begun to undertake regular innovation surveys that include the construction industry (2006), they employ a very narrow definition of the industry and only collect very basic data compared to that provided by the BRITE Survey, which is presented in this chapter. The term ‘innovation’ is defined here as a new or significantly improved technology or organisational practice, based broadly on OECD definitions (OECD/Eurostat 2005). Innovation may be technological or organisational in nature and it may be new to the world, or just new to the industry or the business concerned. The definition thus includes the simple adoption of existing technological and organisational advancements. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment. It builds on a pilot innovation survey undertaken by PricewaterhouseCoopers (PWC) for the Australian Construction Industry Forum on behalf of the Australian Commonwealth Department of Industry Tourism and Resources, in 2001 (PWC 2002). The survey responds to an identified need within the Australian construction industry to have accurate and timely innovation data upon which to base effective management strategies and public policies (Focus Group 2004).
Resumo:
In general, the performance of construction projects, including their sustainability performance, does not meet optimal expectations. One aspect of this is the performance of the participants who are independent and make a significance impact on overall project outcomes. Of these participants, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely, time, cost and quality. As the level of satisfaction is a subjective issue, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in an attempt to determine the performance of construction project outcomes - for instance, client satisfaction, customer satisfaction, contractor satisfaction, occupant satisfaction and home buyer satisfaction. These not only identify the performance of the construction project but are also used to improve and maintain relationships. In addition, these assessments are necessary for the continuous improvement and enhanced cooperation of participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparative standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may possibly be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This chapter examines the methods commonly practised in measuring satisfaction levels today and the advantages of promoting these methods. The results provide a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods to use in identifying the performance of project outcomes.
Resumo:
Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.
Resumo:
The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.