165 resultados para Lean maintenance
Resumo:
Statistics indicate that the percentage of fatal industrial accidents arising from repair, maintenance, minor alteration and addition (RMAA) works in Hong Kong was disturbingly high and was over 56% in 2006. This paper provides an initial report of a research project funded by the Research Grants Council (RGC) of the HKSAR to address this safety issue. The aim of this study is to scrutinize the causal relationship between safety climate and safety performance in the RMAA sector. It aims to evaluate the safety climate in the RMAA sector; examine its impacts on safety performance, and recommend measures to improve safety performance in the RMAA sector. This paper firstly reports on the statistics of construction accidents arising from RMAA works. Qualitative and quantitative research methods applied in conducting the research are dis-cussed. The study will critically review these related problems and provide recommendations for improving safety performance in the RMAA sector.
Resumo:
Technological and societal change, along with organisational and market change (driven by contracting-out and privatisation), are “creating a new generation of infrastructures” [1]. While inter-organisational contractual arrangements can improve maintenance efficiency through consistent and repeatable patterns of action - unanticipated difficulties in implementation can reduce the performance of these arrangements. When faced with unsatisfactory performance of contracting-out arrangements, government organisations may choose to adapt and change these arrangements over time, with the aim of improving performance. This paper enhances our understanding of ‘next generation infrastructures’ by examining adaptation of the organisational arrangements for the maintenance of these assets, in a case study spanning 20 years.
Resumo:
A Split System Approach (SSA) based methodology is presented to assist in making optimal Preventive Maintenance decisions for serial production lines. The methodology treats a production line as a complex series system with multiple PM actions over multiple intervals. Both risk related cost and maintenance related cost are factored into the methodology as either deterministic or random variables. This SSA based methodology enables Asset Management (AM) decisions to be optimized considering a variety of factors including failure probability, failure cost, maintenance cost, PM performance, and the type of PM strategy. The application of this new methodology and an evaluation of the effects of these factors on PM decisions are demonstrated using an example. The results of this work show that the performance of a PM strategy can be measured by its Total Expected Cost Index (TECI). The optimal PM interval is dependent on TECI, PM performance and types of PM strategies. These factors are interrelated. Generally it was found that a trade-off between reliability and the number of PM actions needs to be made so that one can minimize Total Expected Cost (TEC) for asset maintenance.
Resumo:
Optimal operation and maintenance of engineering systems heavily rely on the accurate prediction of their failures. Most engineering systems, especially mechanical systems, are susceptible to failure interactions. These failure interactions can be estimated for repairable engineering systems when determining optimal maintenance strategies for these systems. An extended Split System Approach is developed in this paper. The technique is based on the Split System Approach and a model for interactive failures. The approach was applied to simulated data. The results indicate that failure interactions will increase the hazard of newly repaired components. The intervals of preventive maintenance actions of a system with failure interactions, will become shorter compared with scenarios where failure interactions do not exist.
Resumo:
Maintenance is a time consuming and expensive task for any golf course or driving range manager. For a golf course the primary tasks are grass mowing and maintenance (fertilizer and herbicide spreading), while for a driving range mowing, maintenance and ball collection are required. All these tasks require an operator to drive a vehicle along paths which are generally predefined. This paper presents some preliminary in-field tsting results for an automated tractor vehicle performing golf ball collection on an actual driving range, and mowing on difficult unstructured terrain.
Resumo:
Objective: To assess the effect of graded increases in exercised-induced energy expenditure (EE) on appetite, energy intake (EI), total daily EE and body weight in men living in their normal environment and consuming their usual diets. Design: Within-subject, repeated measures design. Six men (mean (s.d.) age 31.0 (5.0) y; weight 75.1 (15.96) kg; height 1.79 (0.10) m; body mass index (BMI) 23.3(2.4) kg/m2), were each studied three times during a 9 day protocol, corresponding to prescriptions of no exercise, (control) (Nex; 0 MJ/day), medium exercise level (Mex; ~1.6 MJ/day) and high exercise level (Hex; ~3.2 MJ/day). On days 1-2 subjects were given a medium fat (MF) maintenance diet (1.6 ´ resting metabolic rate (RMR)). Measurements: On days 3-9 subjects self-recorded dietary intake using a food diary and self-weighed intake. EE was assessed by continual heart rate monitoring, using the modified FLEX method. Subjects' HR (heart rate) was individually calibrated against submaximal VO2 during incremental exercise tests at the beginning and end of each 9 day study period. Respiratory exchange was measured by indirect calorimetry. Subjects completed hourly hunger ratings during waking hours to record subjective sensations of hunger and appetite. Body weight was measured daily. Results: EE amounted to 11.7, 12.9 and 16.8 MJ/day (F(2,10)=48.26; P<0.001 (s.e.d=0.55)) on the Nex, Mex and Hex treatments, respectively. The corresponding values for EI were 11.6, 11.8 and 11.8 MJ/day (F(2,10)=0.10; P=0.910 (s.e.d.=0.10)), respectively. There were no treatment effects on hunger, appetite or body weight, but there was evidence of weight loss on the Hex treatment. Conclusion: Increasing EE did not lead to compensation of EI over 7 days. However, total daily EE tended to decrease over time on the two exercise treatments. Lean men appear able to tolerate a considerable negative energy balance, induced by exercise, over 7 days without invoking compensatory increases in EI.