525 resultados para Ecosystem management - Australia
An indexing model for sustainable urban environmental management : the case of Gold Coast, Australia
Resumo:
Improving urban ecosystems and the quality of life of citizens have become a central issue in the global effort of creating sustainable built environments. As human beings our lives completely depend on the sustainability of the nature and we need to protect and manage natural resources in a more sustainable way in order to sustain our existence. As a result of population growth and rapid urbanisation, increasing demand of productivity depletes and degrades natural resources. However, the increasing activities and rapid development require more resources, and therefore, ecological planning becomes an essential vehicle in preserving scarce natural resources. This paper aims to indentify the interation between urban ecosystems and human activities in the context of urban sustainability and explores the degrading environmental impacts of this interaction and the necessity and benefits of using sustainability indicators as a tool in sustainable urban evnironmental management. Additionally, the paper also introduces an environmental sustainability indexing model (ASSURE) as an innovative approach to evaluate the environmental conditions of built environment.
Resumo:
With the increasing growth of cultural events both in Australia and internationally, there has also been an increase in event management studies; in theory and in practice. Although a series of related knowledge and skills required specifically by event managers has already been identified by many researchers (Perry et al., 1996; Getz, 2002 & Silvers et al., 2006) and generic event management models proposed, including ‘project management’ strategies in an event context (Getz, 2007), knowledge gaps still exist in relation to identifying specific types of events, especially for not-for-profit arts events. For events of a largely voluntary nature, insufficient resources are recognised as the most challenging; including finance, human resources and infrastructure. Therefore, the concepts and principles which are adopted by large scale commercial events may not be suitable for not-for-profit arts events aiming at providing professional network opportunities for artists. Building partnerships are identified as a key strategy in developing an effective event management model for this type of event. Using the 2008 World Dance Alliance Global Summit (WDAGS) in Brisbane 13-18 July, as a case study, the level, nature and relationship of key partners are investigated. Data is triangulated from interviews with organisers of the 2008 WDAGS, on-line and email surveys of delegates, participant observation and analysis of formal and informal documents, to produce a management model suited to this kind of event.
Resumo:
Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.
Resumo:
Stormwater has been recognised as one of the main culprits of aquatic ecosystem pollution and as a significant threat to the goal of ecological sustainable development. Water sensitive urban design is one of the key responses to the need to better manage urban stormwater runoff, the objectives of which go beyond rapid and efficient conveyance. Underpinned by the concepts of sustainable urban development, water sensitive urban design has proven to be an efficient and environmentally-friendly approach to urban stormwater management, with the necessary technical know-how and skills already available. However, large-scale implementation of water sensitive urban design is still lacking in Australia due to significant impediments and negative perceptions. Identification of the issues, barriers and drivers that affect sustainability outcomes of urban stormwater management is one of the first steps towards encouraging the wide-scale uptake of water sensitive urban design features which integrate sustainable urban stormwater management. This chapter investigates key water sensitive urban design perceptions, drivers and barriers in order to improve sustainable urban stormwater management efforts.
Resumo:
In recent years, local government infrastructure management practices have evolved from conventional land use planning to more wide ranging and integrated urban growth and infrastructure management approaches. The roles and responsibilities of local government are no longer simply to manage daily operational functions of a city and provide basic infrastructure. Local governments are now required to undertake economic planning, manage urban growth; be involved in major infrastructure planning; and even engage in achieving sustainable development objectives. The Brisbane Urban Growth model has proven initially successful to ensure timely and coordinated delivery of urban infrastructure. This model may be the first step for many local governments to move toward an integrated, sustainable and effective infrastructure management.
Resumo:
Purpose: The paper seeks to apply the theory of the democratic deficit to school-based management with an emphasis on Australia. This theory was developed to examine managerial restructuring of the Australian Public Service in the 1990s. Given similarities between the use of managerial practices in the public service and government schools, the authors draw on recent literature about school-based management in Australia and apply the democratic deficit theory to it. ----- ----- Design/methodology/approach: This paper is conceptual in focus. The authors analyse literature in terms of the three components of the democratic deficit – i.e. the weakening of accountability, the denial of the roles and values of public employees, and the emergence of a “hollow state” – and in relation to the application of this theory to the Australian Public Service.----- ----- Findings: A trend towards the three components of the democratic deficit is evident in Australia although, to date, its emergence has not been as extensive as in the UK. The authors argue that the democratic principles on which public schooling in Australia was founded are being eroded by managerial and market practices.----- ----- Practical implications: These findings provide policy makers and practitioners with another way of examining managerial and market understandings of school-based management and its impact on teachers and on students. It offers suggestions to reorient practices away from those that are exclusively managerial-based towards those that are public-sector based.----- ----- Originality/value: The value of this paper is that it applies the theory of the democratic deficit to current understandings of school-based management.
Resumo:
Business Process Management (BPM) is a top priority in organisations and is rapidly proliferating as an emerging discipline in practice. However, the current studies show lack of appropriate BPM skilled professionals in the field and a dearth of opportunities to develop BPM expertise. This paper analyses the gap between available BPM-related education in Australia and required BPM capabilities. BPM courses offered by Australian universities and training institutions have been critically analysed and mapped against leading BPM capability frameworks to determine how well current BPM education and training offerings in Australia actually address the core capabilities required for BPM professionals. The outcomes reported here can be used by Australian universities and training institutions to better align and position their training materials to the BPM required capabilities. It could also be beneficial to individuals looking for a systematic and in-depth understanding of BPM capabilities and trainings.
Resumo:
Background/aim In response to the high burden of disease associated with chronic heart failure (CHF), in particular the high rates of hospital admissions, dedicated CHF management programs (CHF-MP) have been developed. Over the past five years there has been a rapid growth of CHF-MPs in Australia. Given the apparent mismatch between the demand for, and availability of CHF-MPs, this paper has been designed to discuss the accessibility to and quality of current CHF-MPs in Australia. Methods The data presented in this report has been combined from the research of the co-authors, in particular a review of the inequities in access to chronic heart failure which utilised geographical information systems (GIS) and the survey of heterogeneity in quality and service provision in Australian. Results Of the 62 CHF-MPs surveyed in this study 93% (58) centres had been located areas that are rated as Highly Accessible. This result indicated that most of the CHF-MPs have been located in capital cities or large regional cities. Six percent (4 CHF-MPs) had been located in Accessible areas which were country towns or cities. No CHF-MPs had been established outside of cities to service the estimated 72,000 individuals with CHF living in rural and remote areas. 16% of programs recruited NYHA Class I patients and of these 20% lacked confirmation (echocardiogram) of their diagnosis. Conclusion Overall, these data highlight the urgent need to provide equitable access to CHF-MP's. When establishing CHF-MPs consideration of current evidence based models to ensure quality in practice.
Resumo:
Purpose Managers generally have discretion in determining how components of earnings are presented in financial statements in distinguishing between ‘normal’ earnings and items classified as unusual, special, significant, exceptional or abnormal. Prior research has found that such intra-period classificatory choice is used as a form of earnings management. Prior to 2001, Australian accounting standards mandated that unusually large items of revenue and expense be classified as ‘abnormal items’ for financial reporting, but this classification was removed from accounting standards from 2001. This move by the regulators was partly in response to concerns that the abnormal classification was being used opportunistically to manage reported pre-abnormal earnings. This study extends the earnings management literature by examining the reporting of abnormal items for evidence of intra-period classificatory earnings management in the unique Australian setting. Design/methodology/approach This study investigates associations between reporting of abnormal items and incentives in the form of analyst following and the earnings benchmarks of analysts’ forecasts, earnings levels, and earnings changes, for a sample of Australian top-500 firms for the seven-year period from 1994 to 2000. Findings The findings suggest there are systematic differences between firms reporting abnormal items and those with no abnormal items. Results show evidence that, on average, firms shifted expense items from pre-abnormal earnings to bottom line net income through reclassification as abnormal losses. Originality/value These findings suggest that the standard setters were justified in removing the ‘abnormal’ classification from the accounting standard. However, it cannot be assumed that all firms acted opportunistically in the classification of items as abnormal. With the removal of the standardised classification of items outside normal operations as ‘abnormal’, firms lost the opportunity to use such disclosures as a signalling device, with the consequential effect of limiting the scope of effectively communicating information about the nature of items presented in financial reports.
Resumo:
Stormwater has been recognised as one of the main culprits of aquatic ecosystem pollution and as a significant threat to the goal of ecological sustainable development. Water sensitive urban design is one of the key responses to the need to better manage urban stormwater runoff, the objectives of which go beyond rapid and efficient conveyance. Underpinned by the concepts of sustainable urban development, water sensitive urban design has proven to be an efficient and environmentally-friendly approach to urban stormwater management, with the necessary technical know-how and skills already available. However, large-scale implementation of water sensitive urban design is still lacking in Australia due to significant impediments and negative perceptions. Identification of the issues, barriers and drivers that affect sustainability outcomes of urban stormwater management is one of the first steps towards encouraging the wide-scale uptake of water sensitive urban design features which integrate sustainable urban stormwater management. This chapter investigates key water sensitive urban design perceptions, drivers and barriers in order to improve sustainable urban stormwater management efforts.
Resumo:
In recent years, local government infrastructure management practices have evolved from conventional land use planning to more wide ranging and integrated urban growth and infrastructure management approaches. The roles and responsibilities of local government are no longer simply to manage daily operational functions of a city and provide basic infrastructure. Local governments are now required to undertake economic planning, manage urban growth; be involved in major infrastructure planning; and even engage in achieving sustainable development objectives. The Brisbane Urban Growth model has proven initially successful to ensure timely and coordinated delivery of urban infrastructure. This model may be the first step for many local governments to move toward an integrated, sustainable and effective infrastructure management.
Resumo:
Construction and demolition (C&D) waste occupies the largest share of overall waste generation in many countries. However, waste management practices and outcomes may differ between countries. For instance, in Australia, C&D waste recovery is continuously improving during the last years but the amount of C&D waste increases every year, as there has been little improvement in waste avoidance and minimization. In contrast, in Germany, waste generation remains constant over many years despite the continuous economic growth. The waste recycling rate in Germany is one of the highest in the world. However, most waste recycled is from demolition work rather than from waste generated during new construction. In addition, specific laws need to be developed to further reduce landfill of non-recycled waste. Despite of the differences, C&D waste generation and recovery in both countries depend on the effectiveness of the statutory framework, which regulates their waste management practices. This is an issue in other parts of the world as well. Therefore countries can learn from each other to improve their current statutory framework for C&D waste management. By taking Germany and Australia as an example, possible measures to improve current practices of C&D waste management through better statutory tools are identified in this paper. After providing an overview of the statutory framework of both countries and their status in waste generation and recovery, a SWOT analysis is conducted to identify strengths, weaknesses, opportunities and threats of the statutory tools. Recommendations to improve the current statutory frameworks, in order to achieve less waste generation and more waste recovery in the construction industry are provided for the German and Australian government and they can also be transferred to other countries.