614 resultados para Processo de design


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Selecting an appropriate design-builder is critical to the success of DB projects. The objective of this study is to identify selection criteria for design-builders and compare their relative importance by means of a robust content analysis of 94 Request For Proposals (RFPs) for public DB projects. These DB projects had an aggregate contract value of over US$3.5 billion and were advertised between 2000 and 2010. This study summarized twenty-six selection criteria and classified into ten categories, i.e.: price, experience, technical approach, management approach, qualification, schedule, past performance, financial capability, responsiveness to the RFP, and legal status in descending order of their relative importance. The results showed that even though price still remains as the most important selection category, its relative importance declines significantly in the last decade. The categories of qualification, experience, past performance, by contrast, have been becoming more important to DB owners for selecting design-builders. Finally, it is found that the importance weighting of price in large projects is significantly higher than that in small projects. This study provides a useful reference for owners in selecting their preferred design-builders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The two-phrase best-value process has been widely used by public agencies for Design and Build (DB) procurement, with a key issue in the first phase of pre-qualification being the determination of evaluation criteria. This study identified a set of general qualification criteria for design-builders and compares their relative importance by a thorough content analysis of 97 Requests for Qualification (RFQ) for public DB projects advertised between 2000 and 2011 in various regions of the USA. The thirty-nine qualification criteria found are summarized and classified into eight categories comprising: experience; project understanding and approach; organizational structure and capacity; past performance record; professional qualifications; responsiveness to RFQs, office location and familiarity with local environment; and legal status in descending order of their relative importance. A comparative analysis of different types of projects shows that the relative weightings of the qualification criteria vary according to different characteristics of the DB projects involved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design-build (DB) system has been demonstrated as an effective delivery method and has gained popularity worldwide. However it is observed that a number of operational variations of DB system have emerged since the last decade to cater for different client’s requirements. After the client decides to procure his project through the DB system, he still has to choose an appropriate configuration to deliver their projects optimally. However, there is little research on the selection of DB operational variations. One of the main reasons for this is the lack of evaluation criteria for determining the appropriateness of each operational variation. To obtain such criteria, a three-round Delphi survey has been conducted with 20 construction experts in the People’s Republic of China (PRC). Seven top selection criteria were identified. These are: (1) availability of competent design-builders; (2) client’s capabilities; (3) project complexity; (4) client’s control of project; (5) early commencement & short duration; (6) reduced responsibility or involvement; and (7) clearly defined end user’s requirements. These selection criteria were found to have a statistically significant agreement. These findings may furnish various stakeholders, DB clients in particular, with better insight to understand and compare the different operational variations of the DB system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many academic researchers have conducted studies on the selection of design-build (DB) delivery method; however, there are few studies on the selection of DB operational variations, which poses challenges to many clients. The selection of DB operational variation is a multi-criteria decision making process that requires clients to objectively evaluate the performance of each DB operational variation with reference to the selection criteria. This evaluation process is often characterized by subjectivity and uncertainty. In order to resolve this deficiency, the current investigation aimed to establish a fuzzy multicriteria decision-making (FMCDM) model for selecting the most suitable DB operational variation. A three-round Delphi questionnaire survey was conducted to identify the selection criteria and their relative importance. A fuzzy set theory approach, namely the modified horizontal approach with the bisector error method, was applied to establish the fuzzy membership functions, which enables clients to perform quantitative calculations on the performance of each DB operational variation. The FMCDM was developed using the weighted mean method to aggregate the overall performance of DB operational variations with regard to the selection criteria. The proposed FMCDM model enables clients to perform quantitative calculations in a fuzzy decision-making environment and provides a useful tool to cope with different project attributes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose-- DB clients play a vital role in the delivery of DB system and the clients’ competences are critical to the success of DB projects. Most of DB clients, however, remain inexperienced with the DB system. This study, therefore, aims to identify the key competences that DB clients should possess to ensure the success of DB projects in the construction market of China. Design/Methodology/Approach -- Five semi-structured face-to-face interviews and two rounds Delphi questionnaire survey were conducted in the construction market of China to identify the key competences of DB clients. Rankings have been assigned to these key competences on the basis of their relative importance. Findings-- Six ranked key competences of DB clients have been identified, which are, namely, (1) the ability to clearly define project scope and objectives; (2) financial capacity for the projects; (3) capacity in contract management; (4) adequate staff or consulting team; (5) effective coordination with DB contractors and (6) experience with similar design-build projects. Calculation of Kendall’s Coefficient of Concordance (W) indicates a statistically significant consensus of panel experts on these top six key competences. Practical implications—Clients should clearly understand the competence requirements in DB projects and should assess their DB capability before going for the DB option. Originality/Value-- The examination of DB client’s key competences will help the client deepen the understanding of the DB system. DB clients can also make use of the research findings as guidelines to improve their DB competence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-builders play a vital role in the success of DB projects. In the construction market of the People’s Republic of China, most of the design-builders, however, lack adequate competences to conduct the DB projects successfully. The objective of this study is, therefore, to identify the key competences that design-builders should possess to not only ensure the success of DB projects but also acquire the competitive advantages in the DB market. Five semi-structured face-to-face interviews and two rounds of Delphi questionnaire survey were conducted to identify the key competences of design-builders. Rankings have been assigned to these key competences on the basis of their relative importance. Six ranked key competences of design-builders have been identified, which are, namely, (1) experience with similar DB projects; (2) capability of corporate management; (3) combination of building techniques and design expertise; (4) financial capability for DB projects; (5) enterprise qualification and scale; and (6) credit records and reputation in the industry. The design-builders can make use of the research findings as guidelines to improve their DB competence. These research findings will also be useful to clients during the selection of design-builders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-build (DB) system has been demonstrated as an effective delivery method and been widely used overseas. However it does not receive the same popularity in the People’s Republic of China (PRC). This paper first conducts a literature review on advantages and disadvantages of DB in general; then it gives an overview of the PRC construction industry. There are ample evidences that the DB system will theoretically bring benefits to the PRC construction industry. After a thorough investigation of the current DB market, it can be concluded that the development of the DB system is still at its infancy stage. The barriers to entry have been finally identified, which relate to the legal restraints, negative owner attitude, and high requirement of DB projects. These barriers constitute obstacles to the development of DB system in the PRC. However, with rapid growth of construction industry, new requirements in modern construction projects, and strong promotion from governments, it is believed that the domestic DB market will have great potential in the near future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-Build (DB) system has been widely adopted overseas but it has not received the same popularity yet in the People’s Republic of China. The selection of design-build variant is regarded as one of the critical obstacles to the application of this alternative. This paper investigates categories of design-build variants in the construction market of China. The develop-and-construction, enhanced design-build, traditional-design-build and engineering procurement-construction (EPC) are the four current designbuild variants adopted by clients. Each of them is developed to meet a varying set of circumstances and has its own advantages and disadvantages. The develop-and-construction is mostly used in large, complex projects in housing industry and it will guarantee client’s great control over the project while still leave some design room for the contractor. The traditional-design-build and enhanced-design-build systems are mostly applied in projects that are comparatively simple, small-scale, and the DB contractors will have greater control of the projects. The EPC is the extension of pure design-build method and is widely adopted in the petrochemical, metallurgical and electronic fields because of the high-technique requirements and the necessity for one entity to control the design, construction, procurement and commissioning etc. Four corresponding design-build projects are also presented in this paper in order to better illustrate the operational process and provide the insight for understanding the design-build variants in Mainland China.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper examines the integration of computing technologies into music education research in a way informed by constructivism. In particular, this paper focuses on an approach established by Jeanne Bamberger, which the author also employs, that integrates software design, pedagogical exploration, and the building of music education theory. In this tradition, researchers design software and associated activities to facilitate the interactive manipulation of musical structures and ideas. In short, this approach focuses on designing experiences and tools that support musical thinking and doing. In comparing the work of Jean Bamberger with that of the author, this paper highlights and discusses issues of significance and identifies lessons for future research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many firms develop successful businesses around competencies and over time these competencies can become core rigidities and barriers to new ways of working. This paper investigates how firms respond to a design innovation program apply design methodologies to their business. Early findings from a study of companies engaged in a design innovation program indicate that applying design principles to multiple aspects of their business provides a new strategic focus, tools for a better understanding of their business and the marketplace, new economic activity, awareness of the need for an innovative culture and strategic renewal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Part-time employment presents a conundrum in that it facilitates work-life priorities, while also, compared to equivalent full-time roles, attracting penalties such as diminished career prospects and lower commensurate remuneration. Recently, some promising theoretical developments in the job/work design literature suggest that consideration of work design may redress some of the penalties associated with part-time work. Adopting the framework of the Elaborated Model of Work Design by Parker and colleagues (2001), we examined this possibility through interviews with part-time professional service employees and their supervisors. The findings revealed that in organizations characterised by cultural norms of extended working hours and a singular-focused commitment to work, part-time roles were often inadequately re-designed when adapted from full-time arrangements. The findings also demonstrated that certain work design characteristics (e.g. predictability of work-flow, interdependencies with co-workers) render some roles more suitable for part-time arrangements than others. The research provides insights into gaps between policy objectives and outcomes associated with part-time work, challenges assumptions about the limitations of part-time roles, and suggests re-design strategies for more effective part-time arrangements.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Process modeling is an important design practice in organizational improvement projects. In this paper, we examine the design of business process diagrams in contexts where novice analysts only have basic design tools such as paper and pencils available, and little to no understanding of formalized modeling approaches. Based on a quasi-experimental study with 89 BPM students, we identify five distinct process design archetypes ranging from textual to hybrid and graphical representation forms. We examine the quality of the designs and identify which representation formats enable an analyst to articulate business rules, states, events, activities, temporal and geospatial information in a process model. We found that the quality of the process designs decreases with the increased use of graphics and that hybrid designs featuring appropriate text labels and abstract graphical forms appear well-suited to describe business processes. We further examine how process design preferences predict formalized process modeling ability. Our research has implications for practical process design work in industry as well as for academic curricula on process design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Video is commonly used as a method for recording embodied interaction for purposes of analysis and design and has been proposed as a useful ‘material’ for interaction designers to engage with. But video is not a straight forward reproduction of embodied activity – in themselves video recordings ‘flatten’ the space of embodied interaction, they impose a perspective on unfolding action, and remove the embodied spatial and social context within which embodied interaction unfolds. This does not mean that video is not a useful medium with which to engage as part of a process of investigating and designing for embodied interaction – but crucially, it requires that as people attempting to engage with video, designers own bodies and bodily understandings must be engaged with and brought into play. This paper describes and reflects upon our experiences of engaging with video in two different activities as part of a larger research project investigating the design of gestural interfaces for a dental surgery context.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Abstract: The LiteSteel Beam (LSB) is a new cold-formed hollow flange channel section produced using dual electric resistance welding and automated continuous roll-forming technologies. The innovative LSB sections have many beneficial characteristics and are commonly used as flexural members in building construction. However, limited research has been undertaken on the shear behaviour of LSBs. Therefore a detailed investigation including both numerical and experimental studies was undertaken to investigate the shear behaviour of LSBs. Finite element models of LSBs in shear were developed to simulate the nonlinear ultimate strength behaviour of LSBs including their elastic buckling characteristics, and were validated by comparing their results with experimental test results. Validated finite element models were then used in a detailed parametric study into the shear behaviour of LSBs. The parametric study results showed that the current design rules in cold-formed steel structures design codes are very conservative for the shear design of LSBs. Significant improvements to web shear buckling occurred due to the presence of torsionally rigid rectangular hollow flanges while considerable post-buckling strength was also observed. This paper therefore proposes improved shear strength design rules for LSBs within the current cold-formed steel code guidelines. It presents the details of the parametric study and the new shear strength equations. The new equations were also developed based on the direct strength method. The proposed shear strength equations have the potential to be used with other conventional cold-formed steel sections such as lipped channel sections.