303 resultados para service performance
Resumo:
Popular wireless networks, such as IEEE 802.11/15/16, are not designed for real-time applications. Thus, supporting real-time quality of service (QoS) in wireless real-time control is challenging. This paper adopts the widely used IEEE 802.11, with the focus on its distributed coordination function (DCF), for soft-real-time control systems. The concept of the critical real-time traffic condition is introduced to characterize the marginal satisfaction of real-time requirements. Then, mathematical models are developed to describe the dynamics of DCF based real-time control networks with periodic traffic, a unique feature of control systems. Performance indices such as throughput and packet delay are evaluated using the developed models, particularly under the critical real-time traffic condition. Finally, the proposed modelling is applied to traffic rate control for cross-layer networked control system design.
Resumo:
Web service technology is increasingly being used to build various e-Applications, in domains such as e-Business and e-Science. Characteristic benefits of web service technology are its inter-operability, decoupling and just-in-time integration. Using web service technology, an e-Application can be implemented by web service composition — by composing existing individual web services in accordance with the business process of the application. This means the application is provided to customers in the form of a value-added composite web service. An important and challenging issue of web service composition, is how to meet Quality-of-Service (QoS) requirements. This includes customer focused elements such as response time, price, throughput and reliability as well as how to best provide QoS results for the composites. This in turn best fulfils customers’ expectations and achieves their satisfaction. Fulfilling these QoS requirements or addressing the QoS-aware web service composition problem is the focus of this project. From a computational point of view, QoS-aware web service composition can be transformed into diverse optimisation problems. These problems are characterised as complex, large-scale, highly constrained and multi-objective problems. We therefore use genetic algorithms (GAs) to address QoS-based service composition problems. More precisely, this study addresses three important subproblems of QoS-aware web service composition; QoS-based web service selection for a composite web service accommodating constraints on inter-service dependence and conflict, QoS-based resource allocation and scheduling for multiple composite services on hybrid clouds, and performance-driven composite service partitioning for decentralised execution. Based on operations research theory, we model the three problems as a constrained optimisation problem, a resource allocation and scheduling problem, and a graph partitioning problem, respectively. Then, we present novel GAs to address these problems. We also conduct experiments to evaluate the performance of the new GAs. Finally, verification experiments are performed to show the correctness of the GAs. The major outcomes from the first problem are three novel GAs: a penaltybased GA, a min-conflict hill-climbing repairing GA, and a hybrid GA. These GAs adopt different constraint handling strategies to handle constraints on interservice dependence and conflict. This is an important factor that has been largely ignored by existing algorithms that might lead to the generation of infeasible composite services. Experimental results demonstrate the effectiveness of our GAs for handling the QoS-based web service selection problem with constraints on inter-service dependence and conflict, as well as their better scalability than the existing integer programming-based method for large scale web service selection problems. The major outcomes from the second problem has resulted in two GAs; a random-key GA and a cooperative coevolutionary GA (CCGA). Experiments demonstrate the good scalability of the two algorithms. In particular, the CCGA scales well as the number of composite services involved in a problem increases, while no other algorithms demonstrate this ability. The findings from the third problem result in a novel GA for composite service partitioning for decentralised execution. Compared with existing heuristic algorithms, the new GA is more suitable for a large-scale composite web service program partitioning problems. In addition, the GA outperforms existing heuristic algorithms, generating a better deployment topology for a composite web service for decentralised execution. These effective and scalable GAs can be integrated into QoS-based management tools to facilitate the delivery of feasible, reliable and high quality composite web services.
Resumo:
Many ageing road bridges, particularly timber bridges, require urgent improvement due to the demand imposed by the recent version of the Australian bridge loading code, AS 5100. As traffic volume plays a key role in the decision of budget allocations for bridge refurbishment/ replacement, many bridges in low volume traffic network remain in poor condition with axle load and/ or speed restrictions, thus disadvantaging many rural communities. This thesis examines an economical and environmentally sensible option of incorporating disused flat rail wagons (FRW) in the construction of bridges in low volume, high axle load road network. The constructability, economy and structural adequacy of the FRW road bridge is reported in the thesis with particular focus of a demonstration bridge commissioned in regional Queensland. The demonstration bridge comprises of a reinforced concrete slab (RCS) pavement resting on two FRWs with custom designed connection brackets at regular intervals along the span of the bridge. The FRW-RC bridge deck assembly is supported on elastomeric rubber pads resting on the abutment. As this type of bridge replacement technology is new and its structural design is not covered in the design standards, the in-service structural performance of the FRW bridge subjected to the high axle loadings prescribed in AS 5100 is examined through performance load testing. Both the static and the moving load tests are carried out using a fully laden commonly available three-axle tandem truck. The bridge deck is extensively strain gauged and displacement at several key locations is measured using linear variable displacement transducers (LVDTs). A high speed camera is used in the performance test and the digital image data are analysed using proprietary software to capture the locations of the wheel positions on the bridge span accurately. The wheel location is thus synchronised with the displacement and strain time series to infer the structural response of the FRW bridge. Field test data are used to calibrate a grillage model, developed for further analysis of the FRW bridge to various sets of high axle loads stipulated in the bridge design standard. Bridge behaviour predicted by the grillage model has exemplified that the live load stresses of the FRW bridge is significantly lower than the yield strength of steel and the deflections are well below the serviceability limit state set out in AS 5100. Based on the results reported in this thesis, it is concluded that the disused FRWs are competent to resist high axle loading prescribed in AS 5100 and are a viable alternative structural solution of bridge deck in the context of the low volume road networks.
Resumo:
This paper presents an extensive review on the services, six-sigma, and application of six-sigma in services. In order to improve service quality focus on service process is necessary. Six-sigma is a philosophy which also concentrates on the improvement of process. So, six-sigma if properly applied can be useful for services. This study focuses on the application aspect of six-sigma to wider range of services. The wider applicability of six-sigma depends on identification of key performance indicators(KPIs) for different types of service processes. A case study is conducted in call center services to identify, analyze and compare critical to quality characteristics (CTQs) and KPIs with other types of services available in literature. This study will be helpful to both practitioners and researchers.
Resumo:
The concept of Six Sigma was initiated in the 1980s by Motorola. Since then it has been implemented in several manufacturing and service organizations. In case of services, health care and finance were major beneficiaries till now. The application of Six Sigma is gradually picking up in other services like; call centers, utilities and public services. This paper provides empirical evidence on Six Sigma implementation in service industries in Singapore. By using a sample size of 50 service organizations (10 responses are from organizations which have implemented Six Sigma), the paper helps in understanding the status of Six Sigma in service organizations in Singapore. The findings confirm the inclusion of critical success factors, critical to quality characteristics, tools and key performance indicators as observed from the literature. The revelation of “not relevant” as a reason for not implementing Six Sigma shows the need for understanding specific requirements of service organizations before its application.
Resumo:
This paper presents a Six Sigma case study analysis involving three service organizations of Singapore. The organizations are a local hospital, a construction and related engineering service, and a consultancy service. These organizations embarked on their Six Sigma journey around 2003-2004. Though the hospital was slightly ahead than the other two in beginning Six Sigma. These organizations have since achieved significant service improvements through implementation of Six Sigma to their different divisions. Through a series of structured interviews with Six Sigma project champions, team leaders, and members; project reports; public archives; and observations; this study explores the Six Sigma journey of these organizations. The results portray a list of success factors which led to the Six Sigma initiatives, the process of Six Sigma implementation through proper identification of critical-to-quality characteristics, tools and techniques, and the performance indicators which display the improvements due to Six Sigma.
Resumo:
The experiences of transition to the teaching profession have a significant impact on a teachers’ potential length of career, feelings of professional efficacy and the quality of performance in the classroom (Gore & Thomas, 2003). While the transition to practice is characterized by much expectation and excitement, it also a time of stress and uncertainty for many beginning teachers. As such, it is important to investigate this period of transition for beginning teachers. This paper explores graduate teachers perceptions of their personal ‘preparedness to teach’. The group is graduating from one Australian university, and the data is captured at the end of their teacher preparation programs,before they take up positions in schools. These graduating pre-service teachers are from one year graduate entry programs that include individual programs of early years, middle years and senior years. The key findings indicate that this group of graduating pre-service teachers are already engaged in some level of reflective practice and are actively seeking further professional learning to improve the practical aspects of their classroom teaching.
Resumo:
This paper demonstrates an experimental study that examines the accuracy of various information retrieval techniques for Web service discovery. The main goal of this research is to evaluate algorithms for semantic web service discovery. The evaluation is comprehensively benchmarked using more than 1,700 real-world WSDL documents from INEX 2010 Web Service Discovery Track dataset. For automatic search, we successfully use Latent Semantic Analysis and BM25 to perform Web service discovery. Moreover, we provide linking analysis which automatically links possible atomic Web services to meet the complex requirements of users. Our fusion engine recommends a final result to users. Our experiments show that linking analysis can improve the overall performance of Web service discovery. We also find that keyword-based search can quickly return results but it has limitation of understanding users’ goals.
Resumo:
Columns and walls in buildings are subjected to a number of load increments during the construction and service stages. The combination of these load increments and poor quality construction can cause defects in these structural components. In addition, defects can also occur due to accidental or deliberate actions by users of the building during construction and service stages. Such defects should be detected early so that remedial measures can be taken to improve life time serviceability and performance of the building. This paper uses micro and macro model upgrading methods during construction and service stages of a building based on the mass and stiffness changes to develop a comprehensive procedure for locating and detecting defects in columns and walls of buildings. Capabilities of the procedure are illustrated through examples.
Resumo:
The concept of Six Sigma was initiated in the 1980s by Motorola. Since then it has been implemented in several manufacturing and service organizations. Till now Six Sigma implementation is mostly limited to healthcare and financial services in private sector. Its implementation is now gradually picking up in services such as call center, education, construction and related engineering etc. in private as well as public sector. Through a literature review, a questionnaire survey, and multiple case study approach the paper develops a conceptual framework to facilitate widening the scope of Six Sigma implementation in service organizations. Using grounded theory methodology, this study develops theory for Six Sigma implementation in service organizations. The study involves a questionnaire survey and case studies to understand and build a conceptual framework. The survey was conducted in service organizations in Singapore and exploratory in nature. The case studies involved three service organizations which implemented Six Sigma. The objective is to explore and understand the issues highlighted by the survey and the literature. The findings confirm the inclusion of critical success factors, critical-to-quality characteristics, and set of tools and techniques as observed from the literature. In case of key performance indicator, there are different interpretations about it in literature and also by industry practitioners. Some literature explain key performance indicator as performance metrics whereas some feel it as key process input or output variables, which is similar to interpretations by practitioners of Six Sigma. The response of not relevant and unknown to us as reasons for not implementing Six Sigma shows the need for understanding specific requirements of service organizations. Though much theoretical description is available about Six Sigma, but there has been limited rigorous academic research on it. This gap is far more pronounced about Six Sigma implementation in service organizations, where the theory is not mature enough. Identifying this need, the study contributes by going through theory building exercise and developing a conceptual framework to understand the issues involving its implementation in service organizations.
Resumo:
Emergency health is a critical component of Australia’s health system and one which is increasingly congested from growing demand and blocked access to inpatient beds. The Emergency Health Services Queensland (EHSQ) study aims to identify the factors driving increased demand for emergency health and to evaluate strategies which may safely reduce the future demand growth. This monograph addresses the characteristics of users of emergency health services with an aim to identify those that appear to contribute to demand growth. This study utilises data on patients treated by Emergency Departments (ED) and Queensland Ambulance Service (QAS) across Queensland. ED data was derived from the Emergency Department Information System (EDIS) for the period 2001-02 through to 2010-11. Ambulance data was extracted from the QAS’ Ambulance Information Management System (AIMS) and electronic Ambulance Report Form (eARF) for the period 2001-02 through to 2009-10. Due to discrepancies and comparability issues for ED data, this monograph compares data from the 2003-04 time period with 2010-11 data for 21 of the reporting EDs. Also a snapshot of users for the 2010-11 financial year for 31 reporting EDs is used to describe the characteristics of users and to compare those characteristics with population demographics. For QAS data, the 2002-03 and 2009-10 time periods were selected for detailed analyses to identify trends. • Demand for emergency health care services is increasing, representing both increased population and increased relative utilisation. Per capita demand for ED attention has increased by 2% per annum over the last decade and for ambulance attention by 3.7% per annum. • The growth in ED demand is prominent in more urgent triage categories with actual decline in less urgent patients. An estimated 55% of patients attend hospital EDs outside of normal working hours. There is no evidence that patients presenting out of hours are significantly different to those presenting within working hours; they have similar triage assessments and outcomes. • Patients suffering from injuries and poisoning comprise 28% of the ED workload (an increase of 65% in the study period), whilst declines of 32% in cardiovascular and circulatory conditions, and musculoskeletal problems have been observed. • 25.6% of patients attending EDs are admitted to hospital. 19% of admitted patients and 7% of patients who die in the ED are triage category 4 or 5 on arrival. • The average age of ED patients is 35.6 years. Demand has grown in all age groups and amongst both men and women. Men have higher utilisation rates for ED in all age groups. The only group where the growth rate in women has exceeded men is in the 20-29 age group; this growth is particularly in the injury and poisoning categories. • Considerable attention has been paid publicly to ED performance criteria. It is worth noting that 50% of all patients were treated within 33 minutes of arrival. • Patients from lower socioeconomic areas appear to have higher utilisation rates and the utilisation rate for indigenous people appears to exceed those of European and other backgrounds. The utilisation rates for immigrant people is generally less than that of Australian born however it has not been possible to eliminate the confounding impact of different age and socioeconomic profiles. • Demand for ambulance service is also increasing at a rate that exceeds population growth. Utilisation rates have increased by an average of 5% per annum in Queensland compared to 3.6% nationally, and the utilisation rate in Queensland is 27% higher than the national average. • The growth in ambulance utilisation has also been amongst the more urgent categories of dispatch and utilisation rates are higher in rural and regional areas than in the metropolitan area. The demand for ambulance increases with age but the growth in demand for ambulance service has been more prominent in younger age groups. These findings contribute significantly to an understanding of the growth in demand for emergency health. It shows that the growth is amongst patients in genuine need of emergency healthcare and public rhetoric that the congestion of emergency health services is due to inappropriate attendees is unable to be substantiated. The consistency of the growth in demand over the last decade reflects not only the changing demographics of the Australian population but also the changes in health status, standards of acute health care and other social factors. The growth is also amongst patients with acute injury and poisoning which is inconsistent with rates of chronic disease as a fundamental driver. We have also interviewed patients in regard to their decision making choices for acute health care and the factors that influence these decisions and this will be the subject of a third Monograph and publications.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
We focus on understanding the role of productivity in determining wage structure differences between men and women in academia. The data arise from a pay-equity study carried out in a single Midwestern U.S. university over the 1996–7 academic year. Econometric results confirm that external market forces exert influence over both male and female salary. But peer review ratings play a significant role in male but not female earnings determination, with similar results for objective measures of research, teaching and service.