487 resultados para Traffic engineering computing


Relevância:

80.00% 80.00%

Publicador:

Resumo:

It’s fast approaching the end of the year and the festive season, and I have a few things on my mind. First, how I’ll fit in all of my holiday plans and projects within my period of leave, which always seems to pass oh so quickly! But more important are the two issues of global financial uncertainty and safe travel. Judging by what is in the media, it appears to be proving difficult for any self respecting financial industry specialist to define and grapple with the so-called current economic crisis, let alone those of us who have not been formally and extensively schooled in the sciences of finance and economics. Perhaps the latter is even more of a “black art” than the discipline of transport planning. The situation has affected all of us with our superannuation and/or share portfolios; however, judging by the still-crowded shopping centres in many areas, the downstream general economic impacts appear to be less serious in Australia than in other developed countries, even with the significant market fluctuations taking place. There are many important decisions facing Australian governments, from the top down, on how they manage their budgets and spending. Infrastructure spending is in competition with other necessities such as the public health system and education. But it appears that infrastructure is an avenue of public spending that, over all time windows, may be able to significantly bolster local economies and that of the nation as a whole. This, however, is against the spectre of deficits. I would suggest that now, more than ever, we as transport and other professionals within the system, should use our knowledge and experience to take a key role in helping government and the private sector make sound decisions on infrastructure planning, delivery and management.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A belated Happy New Year fellow AITPM members! I trust that you have had a chance to take a break from your routine, and take time out to enjoy company with family and friends, as well as our wonderful surrounds.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

As a tertiary educator, business is now starting to heat up for my colleagues and me as Semester 1 commences. I’d like to take this opportunity to wish all readers who are students or academic staff, whether sessional or full-time, a successful year of teaching to, and learning more about, the transport profession. I’d also like to note the important role played by our AITPM National Council Education Coordinator, being fulfilled by Victoria Branch President Mr Tony Fitts, along with all of our branches’ Education Coordinators.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Well, it has been Clem 7 month here in Brisbane and my impression is “so far, so good!” For those of you who know Brisbane, the four lane twin Clem Jones Tunnel (M7) is approximately 4.5km long, and connects Ipswich Road (A7) at the Princess Alexandra Hospital on the south side with Bowen Bridge Road (A3) at the Royal Brisbane Hospital on the north side. There are also south access ramps to the Pacific Motorway and east access ramps to Shafston Avenue (headed to/from Wynnum). Brisbanites have been enjoying a three week no-toll taste test, and I paced through it one evening with minimal fuss. The tunnel seems to have eased the congestion at the Stanley Street on-ramp to the Pacific Motorway quite a bit, and Ipswich Road – Main Street through the ‘Gabba. One must watch the signage carefully, but once we get used to the infrastructure, this will not likely be problematic. It will be interesting to see how traffic behaves when the system settles after tolling, which has likely commenced by the time you’re reading. I believe a passenger car toll is about $4.20 one way but saves about 24 signalised intersection pass-throughs.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

We’ve had a bit of sticker shock in these parts. Well, apparently. Since my last missive, Brisbane’s Clem Jones Tunnel which was initially free now has a toll, at least partially, at the introductory rate of $2.95 for a one-way car ride between 5a.m. and midnight – free overnight. From 9 May 2010 the toll will be $4.28. Since the introductory toll was introduced, use of the tunnel appears to have declined somewhat – no surprise to transport professionals I suppose. An additional factor may have been that the “novelty value” of driving through the tunnel for free had worn off. This demonstrates to me that much of the community may still see the use of road infrastructure as a rite of passage, with only some actually weighing up the true value of their travel time and vehicle wear and tear against their out of pocket (or onto credit card) cost. Thus, we’re in pioneering times and the role of transport economics in the overall transport infrastructure planning realm is of considerable importance – especially as much of the new big ticket infrastructure is likely to be tolled into the future. The Queensland Premier, Anna Bligh, made poignant commentary about Brisbane City Council’s tunnel use in that such infrastructure is built for future times and not just as a quick fix for current traffic problems. My expectation is that once Airport Link, which is really the northern half of the corridor, opens in 2012, there will be a significant spike in Clem7 usage.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This is my penultimate report as National President of the Australian Institute of Traffic Planning and Management, Inc. As an academic, I would like to take this opportunity to raise some issues and challenges I see in transport professional education in Australia. My general view is that the transport profession has until recently been less conspicuous to others as an identifiable discipline. This is both a blessing and somewhat of a curse. People mostly enter, or sometimes fall into, the transport profession having taken a degree in civil engineering, other engineering, urban and regional planning, economics, industrial psychology, business, followed by the less obvious disciplines. This order is probably about relative to the proportion of members’ background qualifications in our ranks too. However, once a graduate destined to become a transport professional has spent about five years or so out of the academic estuary, they tend to specialise in an area that cannot necessarily be easily correlated to the well known courses I have rattled off above. I can say from experience that it is not out of the question to see SIDRA models having been prepared by a transport professional who did not take traffic engineering as part of a civil engineering degree. So I see a couple of key challenges for the transport profession, which happens to be represented by a number of bodies, with our AITPM perhaps being the peak body, into the future,

Relevância:

80.00% 80.00%

Publicador:

Resumo:

I’d like to re-state AITPM’s mission, which is “Growing Traffic Skills and Knowledge to Deliver Sustainable Transport.” The aims of the Institute are to advance traffic planning and management; to increase the knowledge of its members by encouraging free discussion, exchange of ideas and research in this field; and to provide a central point of reference for practitioners.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Freeways are divided roadways designed to facilitate the uninterrupted movement of motor vehicles. However, many freeways now experience demand flows in excess of capacity, leading to recurrent congestion. The Highway Capacity Manual (TRB, 1994) uses empirical macroscopic relationships between speed, flow and density to quantify freeway operations and performance. Capacity may be predicted as the maximum uncongested flow achievable. Although they are effective tools for design and analysis, macroscopic models lack an understanding of the nature of processes taking place in the system. Szwed and Smith (1972, 1974) and Makigami and Matsuo (1990) have shown that microscopic modelling is also applicable to freeway operations. Such models facilitate an understanding of the processes whilst providing for the assessment of performance, through measures of capacity and delay. However, these models are limited to only a few circumstances. The aim of this study was to produce more comprehensive and practical microscopic models. These models were required to accurately portray the mechanisms of freeway operations at the specific locations under consideration. The models needed to be able to be calibrated using data acquired at these locations. The output of the models needed to be able to be validated with data acquired at these sites. Therefore, the outputs should be truly descriptive of the performance of the facility. A theoretical basis needed to underlie the form of these models, rather than empiricism, which is the case for the macroscopic models currently used. And the models needed to be adaptable to variable operating conditions, so that they may be applied, where possible, to other similar systems and facilities. It was not possible to produce a stand-alone model which is applicable to all facilities and locations, in this single study, however the scene has been set for the application of the models to a much broader range of operating conditions. Opportunities for further development of the models were identified, and procedures provided for the calibration and validation of the models to a wide range of conditions. The models developed, do however, have limitations in their applicability. Only uncongested operations were studied and represented. Driver behaviour in Brisbane was applied to the models. Different mechanisms are likely in other locations due to variability in road rules and driving cultures. Not all manoeuvres evident were modelled. Some unusual manoeuvres were considered unwarranted to model. However the models developed contain the principal processes of freeway operations, merging and lane changing. Gap acceptance theory was applied to these critical operations to assess freeway performance. Gap acceptance theory was found to be applicable to merging, however the major stream, the kerb lane traffic, exercises only a limited priority over the minor stream, the on-ramp traffic. Theory was established to account for this activity. Kerb lane drivers were also found to change to the median lane where possible, to assist coincident mergers. The net limited priority model accounts for this by predicting a reduced major stream flow rate, which excludes lane changers. Cowan's M3 model as calibrated for both streams. On-ramp and total upstream flow are required as input. Relationships between proportion of headways greater than 1 s and flow differed for on-ramps where traffic leaves signalised intersections and unsignalised intersections. Constant departure onramp metering was also modelled. Minimum follow-on times of 1 to 1.2 s were calibrated. Critical gaps were shown to lie between the minimum follow-on time, and the sum of the minimum follow-on time and the 1 s minimum headway. Limited priority capacity and other boundary relationships were established by Troutbeck (1995). The minimum average minor stream delay and corresponding proportion of drivers delayed were quantified theoretically in this study. A simulation model was constructed to predict intermediate minor and major stream delays across all minor and major stream flows. Pseudo-empirical relationships were established to predict average delays. Major stream average delays are limited to 0.5 s, insignificant compared with minor stream delay, which reach infinity at capacity. Minor stream delays were shown to be less when unsignalised intersections are located upstream of on-ramps than signalised intersections, and less still when ramp metering is installed. Smaller delays correspond to improved merge area performance. A more tangible performance measure, the distribution of distances required to merge, was established by including design speeds. This distribution can be measured to validate the model. Merging probabilities can be predicted for given taper lengths, a most useful performance measure. This model was also shown to be applicable to lane changing. Tolerable limits to merging probabilities require calibration. From these, practical capacities can be estimated. Further calibration is required of traffic inputs, critical gap and minimum follow-on time, for both merging and lane changing. A general relationship to predict proportion of drivers delayed requires development. These models can then be used to complement existing macroscopic models to assess performance, and provide further insight into the nature of operations.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper discusses the research carried out towards the development of a hybrid-composite floor plate systems (HCFPS) using polyurethane (PU), glass-fibre reinforced cement (GRC) and thin perforated steel laminate. HCFPS is configured in such a way where positive inherent properties of individual component materials are combined to offset any weakness and achieve the optimum performance. Finite Element modeling of HCFPS with ABAQUS 6.9-1, comparative studies of HCFPS with the steel deck composite system and experimental investigations which will be carried out are briefly described in the paper.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Current complication rates for adolescent scoliosis surgery necessitate the development of better surgical planning tools to improve outcomes. Here we present our approach to developing finite element models of the thoracolumbar spine for deformity surgery simulation, with patient-specific model anatomy based on low-dose pre-operative computed tomography scans. In a first step towards defining patient-specific tissue properties, an initial 'benchmark' set of properties were used to simulate a clinically performed pre-operative spinal flexibility assessment, the fulcrum bending radiograph. Clinical data for ten patients were compared with the simulated results for this assessment and in cases where these data differed by more than 10%, soft tissue properties for the costo-vertebral joint (CVJt) were altered to achieve better agreement. Results from these analyses showed that changing the CVJt stiffness resulted in acceptable agreement between clinical and simulated flexibility in two of the six cases. In light of these results and those of our previous studies in this area, it is suggested that spinal flexibility in the fulcrum bending test is not governed by any single soft tissue structure acting in isolation. More detailed biomechanical characterisation of the fulcrum bending test is required to provide better data for determination of patient-specific soft tissue properties.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

New residential scale photovoltaic (PV) arrays are commonly connected to the grid by a single dc-ac inverter connected to a series string of pv panels, or many small dc-ac inverters which connect one or two panels directly to the ac grid. This paper proposes an alternative topology of nonisolated per-panel dc-dc converters connected in series to create a high voltage string connected to a simplified dc-ac inverter. This offers the advantages of a "converter-per-panel" approach without the cost or efficiency penalties of individual dc-ac grid connected inverters. Buck, boost, buck-boost, and Cu´k converters are considered as possible dc-dc converters that can be cascaded. Matlab simulations are used to compare the efficiency of each topology as well as evaluating the benefits of increasing cost and complexity. The buck and then boost converters are shown to be the most efficient topologies for a given cost, with the buck best suited for long strings and the boost for short strings. While flexible in voltage ranges, buck-boost, and Cu´k converters are always at an efficiency or alternatively cost disadvantage.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents a numerical study on the response of axially loaded slender square concrete filled steel tube (CFST) columns under low velocity lateral impact loading. A finite element analysis (FEA) model was developed using the explicit dynamic nonlinear finite element code LS -DYNA in which the strain rate effects of both steel and concrete, contact between steel tube and concrete and confinement effect provided by the steel tube for the concrete were considered. The model also benefited from a relatively recent feature of LS-DYNA for applying a pre-loading in the explicit solver. The developed numerical model was verified for its accuracy and adequacy by comparing the results with experimental results available in the literature. The verified model was then employed to conduct a parametric study to investigate the influence of axial load level, impact location, support conditions, and slenderness ratio on the response of the CFST columns. A good agreement between the numerical and experimental results was achieved. The model could reasonably predict the impact load-deflection history and deformed shape of the column at the end of the impact event. The results of the parametric study showed that whilst impact location, axial load level and slenderness ratio can have a significant effect on the peak impact force, residual lateral deflection and maximum lateral deflection, the influence of support fixity is minimal. With an increase of axial load to up to a certain level, the peak force increases; however, a further increase in the axial load causes a decrease in the peak force. Both residual lateral deflection and maximum lateral deflection increase as axial load level increases. Shifting the impact location towards the supports increases the peak force and reduces both residual and maximum lateral deflections. A rise in slenderness ratio decreases the peak force and increases the residual and maximum lateral deflections.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The pulse power characteristics of ultracapacitors appear well suited to electric vehicle applications, where they may supply the peak power more efficiently than the battery, and can prevent excessive over sizing of the battery pack due to peak power demands. Operation of ultracapacitors in battery electric vehicles (BEVs) is examined for possible improvements in system efficiency, vehicle driving range, battery pack lifetime, and potential reductions in system lifecycle cost. The lifecycle operation of these ultracapacitors is simulated using a custom-built, dynamic simulation code constructed in Matlab. Despite apparent gains in system efficiency and driving range, the lifecycle cost benefits as simulated appear to be marginal, and are heavily influenced by the incremental cost of power components. However, additional factors are identified which, in reality, will drive ultracapacitors towards viability in electric vehicle applications.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Macroscopic Fundamental Diagram (MFD) has been proved to exist in large urban road and freeway networks by theoretic method and real data in cities. However hysteresis and scatters have also been found existed both on motorway network and urban road. This paper investigates how the incident variables affect the scatter and shape of the MFD using both the simulated data and the real data collected from the Pacific Motorway M3 in Brisbane, Australia. Three key components of incident are investigated based on the simulated data: incident location, incident duration time and traffic demand. Results based on the simulated data indicate that MFD shape is a property not only of the network itself but also of the incident characteristics variables. MFDs for three types of real incidents (crash, hazard and breakdown) are explored separately. The results based on the empirical data are consistent with the simulated results. The hysteresis phenomenon occurs on both the upstream and the downstream of the incident location, but for opposite hysteresis loops. Gradient of the MFD for the upstream is more than that for the downstream on the incident site, when traffic demand is off peak.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Railway Bridges deteriorate over time due to different critical factors including, flood, wind, earthquake, collision, and environment factors, such as corrosion, wear, termite attack, etc. In current practice, the contributions of the critical factors, towards the deterioration of railway bridges, which show their criticalities, are not appropriately taken into account. In this paper, a new method for quantifying the criticality of these factors will be introduced. The available knowledge as well as risk analyses conducted in different Australian standards and developed for bridge-design will be adopted. The analytic hierarchy process (AHP) is utilized for prioritising the factors. The method is used for synthetic rating of railway bridges developed by the authors of this paper. Enhancing the reliability of predicting the vulnerability of railway bridges to the critical factors, will be the significant achievement of this research.