172 resultados para Success.
Resumo:
Like many other developing countries, Jordan is adopting Enterprise Resource Planning (ERP) systems in both its public and private sectors. Jordan's emerging private sector has historically close ties to the public sector, though a global market orientation requires a shift in its organisational culture. ERPs however embed business processes which do not necessarily fit with traditional cultural practices, and implementation success is not assured.. This study looks at the perceptions of both public and private sector ERP implementations in Jordan and assesses these on various measures of success. There were few differences between public and private sectors, but the benefits actually realized in Jordanian ERPs fell short of claims made for the technology in other cultures. Considerable customisation was required in both sectors, and the traditional style of management in Jordan did not fit well with the requirements for successful implementation. This is consistent with recent studies from various countries that show cultural fit is a particularly neglected factor in assessing ERP success.
Resumo:
Business Process Management (BPM) in recent years has become a highest priority area for most organizations. Since this concept is multidisciplinary, success in this endeavour requires considering different factors. A number of studies have been conducted to identify these factors; however, most are limited to the introduction of high-level factors or to the identification of the means of success within only a specific context. This paper presents a holistic framework of success factors as well as the associated means for achieving success. This framework introduces nine factors, namely culture, leadership, communication, Information Technology, strategic alignment, people, project management, performance measurement and methodology. Each of these factors are characterized further by defining some sub-constructs and under each sub construct the means for achieving success are also introduced. This framework including means for achieving success can be useful for BPM project stakeholders in adequately planning the initiative and checking the progress during the implementation.
Resumo:
Contractual relationships have become increasingly strained in recent years in the construction industry result in the use of the judicial system for the settlement of contractual disagreements. Why is this so? Evidence from anecdotes suggest that the lack of capacity amongst owners and contractors to carry out a contract using a good practice approach during the construction of a project contribute to the occurrence of conflicts, losses, deficient contractual relationships and poor performance of the construction work. Recognizing that current forms of contract in use today perpetuate a legacy of construction problems, we are conducting explanatory research to examine whether the widely publicized benefits of New Engineering Contract (NEC) could be realized in the Australian construction industry. This paper outlines a research agenda that will help shed light on how contract forms are able to be used as a mechanism to ensure construction projects are delivered successfully whilst also meeting the goals of multiple stakeholders. Understanding the Critical Success Factors (CSFs), commonly used construction contracts and the NEC system can help us address some of these issues. However, there are gaps in the validation of the benefits of NEC and its link with project success. We identify some of these gaps and propose a methodology by which to gain insights into this phenomenon. Keywords: Project Success, Construction Contracting, New Engineering Contract (NEC)
Resumo:
Design talks LOUDLY!!! Is a series of interactive presentations exploring issues and opportunities involving professional design. --------------- These seminars are organised by the Industrial Design Network Queensland (IDnetQLD) in coordination with the Design Institute of Australia (DIA). This event was held at the State Library of Queensland (SLQ) with invited public presentations by a panel of industry experts from the Australian Government – IP Australia. --------------- The first seminar "Intellectual Property : designing 4 success" highlighted to design professionals how the various forms of Intellectual Property interact, what protections and pitfalls exist, and how these impact upon the work and responsibilities of designers. The overlaps, gaps and in congruencies in the various IP protection systems were highlighted by the expert line-up of speakers. --------------- The underlying message is that a clear understanding of all IP types is necessary in order to gain the best advantage from IP protection and therefore eliminate potential IP ownership issues before they become a problem.
Resumo:
In 1993 the Australian Broadcasting Corporation was contracted by the Australian Government to assist in the reshaping of the South African Broadcasting Corporation from a state-run broadcaster to a respected and trusted national broadcaster for all people in the newly democratic South Africa. Broadcast journalism training was identified by ABC consultant Bob Wurth as possibly the greatest need for SABC Radio. This thesis examines the ABC's role in South Africa and the effectiveness of its radio journalism training project considering the organisational, structural, cultural and political constraints of the SABC. This thesis will show through interviews and participant observation the difficulties in achieving the production of Western Liberal journalism values at the SABC within the time constraints set by the project funded by the Australian Government and the particular South African morays.
Resumo:
Purpose: Although there is increasing evidence that the creative industries are essential to national economic growth as well as social and cultural well-being, creative graduates often find it difficult to become established professionally. This study investigates the value of career management competence and intrinsic career motivations (as elements of ‘protean career orientation’) in predicting positive graduate outcomes. ----- ----- Design/methodology: Self-report surveys were administered to 208 creative industries graduates from two Australian universities at two points in time: at course completion, and one year later. ----- ----- Findings: Individual career management competence and intrinsic work motivations, measured at course completion, were significant predictors of early career success, using both subjective and objective measures, measured one year later. ----- ----- Practical implications: This study suggests that an emphasis on student development beyond the traditional ‘key’ employability skills may well be worthwhile. The article also suggests a broad learning and teaching approach by which universities can encourage the development of student career identity, and thus engender student intrinsic career motivations and career self management skills and behaviours. ----- ----- Originality/value: This is one of the first studies to demonstrate empirically a link between a particular set of skills and graduate outcomes. In addition, it provides insights into the role of student career motivations in positive transitions to the world of work in the creative industries.
Resumo:
The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.