261 resultados para 171-1049
Resumo:
PURPOSE: To examine the association between neighborhood disadvantage and physical activity (PA). ---------- METHODS: We use data from the HABITAT multilevel longitudinal study of PA among mid-aged (40-65 years) men and women (n=11, 037, 68.5% response rate) living in 200 neighborhoods in Brisbane, Australia. PA was measured using three questions from the Active Australia Survey (general walking, moderate, and vigorous activity), one indicator of total activity, and two questions about walking and cycling for transport. The PA measures were operationalized using multiple categories based on time and estimated energy expenditure that were interpretable with reference to the latest PA recommendations. The association between neighborhood disadvantage and PA was examined using multilevel multinomial logistic regression and Markov Chain Monte Carlo simulation. The contribution of neighborhood disadvantage to between-neighborhood variation in PA was assessed using the 80% interval odds ratio. ---------- RESULTS: After adjustment for sex, age, living arrangement, education, occupation, and household income, reported participation in all measures and levels of PA varied significantly across Brisbane’s neighborhoods, and neighborhood disadvantage accounted for some of this variation. Residents of advantaged neighborhoods reported significantly higher levels of total activity, general walking, moderate, and vigorous activity; however, they were less likely to walk for transport. There was no statistically significant association between neighborhood disadvantage and cycling for transport. In terms of total PA, residents of advantaged neighborhoods were more likely to exceed PA recommendations. ---------- CONCLUSIONS: Neighborhoods may exert a contextual effect on residents’ likelihood of participating in PA. The greater propensity of residents in advantaged neighborhoods to do high levels of total PA may contribute to lower rates of cardiovascular disease and obesity in these areas
Resumo:
BOOK: Written by the surgeons of the Exeter Hip Team and their colleagues from around the world, this book describes 40 years of innovation and development with cemented hip replacement. Topics covered include the basic science behind successful cemented hip replacement, modern surgical techniques and recent advances. There is also extensive coverage of the revision techniques developed at Exeter and elsewhere, focussing on femoral and acetabular impaction grafting. Each chapter is a self-contained article with an emphasis, where appropriate, on practical techniques and surgical tips, supported by line drawings and intra-operative photographs.
Resumo:
For some time there has been a growing awareness of organizational culture and its impact on the functioning of engineering and maintenance departments. Those wishing to implement contemporary maintenance regimes (e.g. condition based maintenance) are often encouraged to develop “appropriate cultures” to support a new method’s introduction. Unfortunately these same publications often fail to specifically articulate the cultural values required to support those efforts. In the broader literature, only a limited number of case examples document the cultural values held by engineering asset intensive firms and how they contribute to their success (or failure). Consequently a gap exists in our knowledge of what engineering cultures currently might look like, or what might constitute a best practice engineering asset culture. The findings of a pilot study investigating the perceived ideal characteristics of engineering asset cultures are reported. Engineering managers, consultants and academics (n=47), were surveyed as to what they saw were essential attributes of both engineering cultures and engineering asset personnel. Valued cultural elements included those orientated around continuous improvement, safety and quality. Valued individual attributes included openness to change, interpersonal skills and conscientiousness. The paper concludes with a discussion regarding the development of a best practice cultural framework for practitioners and engineering managers.
Resumo:
Islanded operation, protection, reclosing and arc extinguishing are some of the challenging issues related to the connection of converter interfaced distributed generators (DGs) into a distribution network. The isolation of upstream faults in grid connected mode and fault detection in islanded mode using overcurrent devices are difficult. In the event of an arc fault, all DGs must be disconnected in order to extinguish the arc. Otherwise, they will continue to feed the fault, thus sustaining the arc. However, the system reliability can be increased by maximising the DG connectivity to the system: therefore, the system protection scheme must ensure that only the faulted segment is removed from the feeder. This is true even in the case of a radial feeder as the DG can be connected at various points along the feeder. In this paper, a new relay scheme is proposed which, along with a novel current control strategy for converter interfaced DGs, can isolate permanent and temporary arc faults. The proposed protection and control scheme can even coordinate with reclosers. The results are validated through PSCAD/EMTDC simulation and MATLAB calculations.
Resumo:
Simulation study of a custom power park (CPP) is presented. It is assumed that the park contains unbalanced and nonlinear loads in addition to a sensitive load. Two different types of compensators are used separately to protect the sensitive load against unbalance and distortion caused by the other loads. It has been shown that a shunt compensator can regulate the voltage of the CPP bus, whereas the series compensator can only regulate the sensitive load terminal voltage. Additional issues such as the load transfer through a static transfer switch, detection of sag/fault etc. are also discussed. The concepts are validated through PSCAD/EMTDC simulation studies on a sample distribution system.
Resumo:
The concept of an interline voltage controller (IVOLCON) to improve the power quality in a power distribution system is discussed. An IVOLCON consists of two shunt voltage source converters (VSCs) that are joined through a common dc bus. The VSCs are connected to two different feeders. The main aim of the IVOLCON is to control the PCC (Point of Common Coupling) bus voltages of the two feeders to pre-specified magnitudes. The phase angles of the PCC bus voltages are obtained such that the voltage across the common dc link remains constant. The structure, control and capability of the IVOLCON are described. The efficacy of the proposed configuration has been verified through simulation studies using PSCAD/EMTDC for voltage sags and feeder outage
Resumo:
The effective atomic number is widely employed in radiation studies, particularly for the characterisation of interaction processes in dosimeters, biological tissues and substitute materials. Gel dosimeters are unique in that they comprise both the phantom and dosimeter material. In this work, effective atomic numbers for total and partial electron interaction processes have been calculated for the first time for a Fricke gel dosimeter, five hypoxic and nine normoxic polymer gel dosimeters. A range of biological materials are also presented for comparison. The spectrum of energies studied spans 10 keV to 100 MeV, over which the effective atomic number varies by 30 %. The effective atomic numbers of gels match those of soft tissue closely over the full energy range studied; greater disparities exist at higher energies but are typically within 4 %.
Resumo:
Forces of demand and supply are changing the dynamics of the higher education market. Transformation of institutions of higher learning into competitive enterprise is underway. Higher education institutions are seemingly under intense pressure to create value and focus their efforts and scarce funds on activities that drive up value for their respective customers and other stakeholders. Porter’s generic ‘value chain’ model for creating value requires that the activities of an organization be segregated in to discrete components for value chain analysis to be performed. Recent trends in higher education make such segregation possible. Therefore, it is proposed that the academic process can be unbundled into discrete components which have well developed measures. A reconfigured value chain for higher education, with its own value drivers and critical internal linkages is also proposed in this paper.
Resumo:
Dwell times at stations and inter-station run times are the two major operational parameters to maintain train schedule in railway service. Current practices on dwell-time and run-time control are that they are only optimal with respect to certain nominal traffic conditions, but not necessarily the current service demand. The advantages of dwell-time and run-time control on trains are therefore not fully considered. The application of a dynamic programming approach, with the aid of an event-based model, to devise an optimal set of dwell times and run times for trains under given operational constraints over a regional level is presented. Since train operation is interactive and of multi-attributes, dwell-time and run-time coordination among trains is a multi-dimensional problem. The computational demand on devising trains' instructions, a prime concern in real-time applications, is excessively high. To properly reduce the computational demand in the provision of appropriate dwell times and run times for trains, a DC railway line is divided into a number of regions and each region is controlled by a dwell- time and run-time controller. The performance and feasibility of the controller in formulating the dwell-time and run-time solutions for real-time applications are demonstrated through simulations.
Resumo:
With daily commercial and social activity in cities, regulation of train service in mass rapid transit railways is necessary to maintain service and passenger flow. Dwell-time adjustment at stations is one commonly used approach to regulation of train service, but its control space is very limited. Coasting control is a viable means of meeting the specific run-time in an inter-station run. The current practice is to start coasting at a fixed distance from the departed station. Hence, it is only optimal with respect to a nominal operational condition of the train schedule, but not the current service demand. The advantage of coasting can only be fully secured when coasting points are determined in real-time. However, identifying the necessary starting point(s) for coasting under the constraints of current service conditions is no simple task as train movement is governed by a large number of factors. The feasibility and performance of classical and heuristic searching measures in locating coasting point(s) is studied with the aid of a single train simulator, according to specified inter-station run times.
Resumo:
System analysis within the traction power system is vital to the design and operation of an electrified railway. Loads in traction power systems are often characterised by their mobility, wide range of power variations, regeneration and service dependence. In addition, the feeding systems may take different forms in AC electrified railways. Comprehensive system studies are usually carried out by computer simulation. A number of traction power simulators have been available and they allow calculation of electrical interaction among trains and deterministic solutions of the power network. In the paper, a different approach is presented to enable load-flow analysis on various feeding systems and service demands in AC railways by adopting probabilistic techniques. It is intended to provide a different viewpoint to the load condition. Simulation results are given to verify the probabilistic-load-flow models.
Resumo:
The concept of moving block signallings (MBS) has been adopted in a few mass transit railway systems. When a dense queue of trains begins to move from a complete stop, the trains can re-start in very close succession under MBS. The feeding substations nearby are likely to be overloaded and the service will inevitably be disturbed unless substations of higher power rating are used. By introducing starting time delays among the trains or limiting the trains’ acceleration rate to a certain extent, the peak energy demand can be contained. However, delay is introduced and quality of service is degraded. An expert system approach is presented to provide a supervisory tool for the operators. As the knowledge base is vital for the quality of decisions to be made, the study focuses on its formulation with a balance between delay and peak power demand.
Resumo:
Traffic conflicts at railway junctions are very conmon, particularly on congested rail lines. While safe passage through the junction is well maintained by the signalling and interlocking systems, minimising the delays imposed on the trains by assigning the right-of-way sequence sensibly is a bonus to the quality of service. A deterministic method has been adopted to resolve the conflict, with the objective of minimising the total weighted delay. However, the computational demand remains significant. The applications of different heuristic methods to tackle this problem are reviewed and explored, elaborating their feasibility in various aspects and comparing their relative merits for further studies. As most heuristic methods do not guarantee a global optimum, this study focuses on the trade-off between computation time and optimality of the resolution.
Resumo:
Conflict occurs when two or more trains approach the same junction within a specified time. Such conflicts result in delays. Current practices to assign the right of way at junctions achieve orderly and safe passage of the trains, but do not attempt to reduce the delays. A traffic controller developed in the paper assigns right of way to impose minimum total weighted delay on the trains. The traffic flow model and the optimisation technique used in this controller are described. Simulation studies of the performance of the controller are given.
Resumo:
Fuzzy logic has been applied to control traffic at road junctions. A simple controller with one fixed rule-set is inadequate to minimise delays when traffic flow rate is time-varying and likely to span a wide range. To achieve better control, fuzzy rules adapted to the current traffic conditions are used.