384 resultados para Project performance Infrastructure


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sustainable construction is gaining worldwide attention and has inspired research to identify and solve the problems involved in its implementation over a project lifecycle. While an impressive number of papers have been published on the topic to date, little has been done to review these papers to identify current research status or provide guidance for future research. This paper reviews existing sustainability papers in 12 internationally renowned construction journals. Based on a three-stage literature review, sustainability papers published in these journals from 2000 to 2012 are analyzed in terms of the annual number of papers published and the research interests involved. The number of sustainability-related papers in construction increases from 30 papers in 2000 to 127 papers in 2012, which shows an increasing trend in sustainability topics. A content analysis identifies seven major research interest in sustainability, including: (1) sustainable project management; (2) sustainability assessment/evaluation; (3) sustainable technology/innovation implementation; (4) sustainable building/infrastructure performance; (5) government policy on sustainability; (6) enterprise sustainability, and; (7) sustainability education. The results of this study provide a reference for scholars and academics to understand the current status of sustainability research in major construction journals.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sustainability has become crucial for the energy industry as projects in this industry are extensively large and complex and have significant impacts on the environment, community and economy. It demands the energy industry to proactively incorporate sustainability ideas and commit to sustainable project development. This study aims to investigate how the Australian energy industry responds to sustainability requirements and in particular what indicators used to measure sustainability performance. To achieve this, content analysis of sustainability reports, vision statements and policy statements of Australian energy companies listed in the 2013 PLATTS Top 250 Global Energy Company Rankings and government reports relating to sustainability has been conducted. The findings show that the energy companies extensively discuss sustainability aspects within three dimensions, i.e. community, environment, and economy. Their primary goals in sustainability are supplying cleaner energy for future, and doing business in a way that improves outcomes for shareholders, employees, business partners and the communities. In particular, energy companies have valued the employees of the business as a one of the key area that needs to be considered. Furthermore, the energy industry has become increasingly aware of the importance of measuring sustainability performance to achieve sustainability goals. A number of sustainability indicators have been developed on the basis of the key themes beyond economic measures. It is envisaged that findings from this research will help stakeholders in the energy industry to adopt different indicators to evaluate and ultimately achieve sustainability performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the results of a research project aimed at examining the capabilities and challenges of two distinct but not mutually exclusive approaches to in-service bridge assessment: visual inspection and installed monitoring systems. In this study, the intended functionality of both approaches was evaluated on its ability to identify potential structural damage and to provide decision-making support. Inspection and monitoring are compared in terms of their functional performance, cost, and barriers (real and perceived) to implementation. Both methods have strengths and weaknesses across the metrics analyzed, and it is likely that a hybrid evaluation technique that adopts both approaches will optimize efficiency of condition assessment and ultimately lead to better decision making.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project is a step towards assessing the effects of climate change on the tra catfish industry in Vietnam. The methods were designed to evaluate possible effects of salinity and temperature increase and their interaction on fish physiological parameters, growth performance, survival and the expression of stress related genes. Results indicated that tra had higher overall performance at 35oC with 6ppt salinity and therefore should cope with moderate predicted outcomes of climate change for the region. The experiments were mostly conducted in the Mekong Delta, Vietnam - the centre of the tra catfish industry with the cooperation of Can Tho University – Can Tho City – Vietnam.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Encroaching built environment with increased fault current levels is demanding a robust design approach and prolonged improved performance of the earth grid. With this in mind, the aim of the project was to perform a sensitivity analysis of the earth grid and an earthing performance evaluation with graphene coated conductors. Subsequent to these, a conceptual design to continuously monitor the performance of the earth grid was developed. In this study, earth grid design standards were compared to evaluate their appropriate use in determining the safety condition. A process to grow a thin film of graphene on the surface of cylindrical copper rods was developed to evaluate earthing performance in terms of conductivity and corrosion susceptibility.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project was a step forward in introducing suitable cooperative diversity transmission techniques for vehicle to vehicle communications. The contributions are intended to aid in the successful implementation of future vehicular safety and autonomous controlling systems. Several protocols were introduced for vehicles to communicate effectively without losing connectivity. This study investigated novel protocols in terms of diversity-multiplexing trade-off and outage for a range of potential vehicular safety and infotainment applications.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Public private partnerships (PPPs) have been adopted widely to provide public facilities and services. According to the PPP agreement, PPP projects would be transferred to the public sector. However, problems related to the subsequent management of ongoing PPP projects have not been studied thoroughly. Residual value risk (RVR) can occur if the public sector cannot obtain the project in the desired conditions as required in the agreement when a project is being transferred. RVR has been identified as an important risk in PPPs and has greatly influenced the outputs of the projects. In order to further observe the change of residual value (RV) during the process of PPP projects and to reveal the internal mechanism for reducing the RVR, a comparative case study of two PPP projects in mainland China and Hong Kong was conducted. Based on the case study, different factors leading to RVR and a series of key risk indicators (KRIs) were identified. The comparison demonstrates that RVR is an important risk that could influence the success of PPP projects. The cumulative effects during the concession period can play significant roles in the occurrence of RVR. Additionally, the cumulative effects in different cases can make the RVR different because of different stakeholders’ efforts on the projects and ways to treat RVR. Finally, alternatives for the public sector to treat RVR were proposed. The findings of this research can reduce RVR and improve the performance of PPP projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although statistical data in some developed countries indicate that migrant workers are nearly 30% more likely to have work-related injuries than local workers, no equivalent official injury/ incident statistics on the health and safety (H&S) of migrant workers are currently tracked in Australia. With increasing numbers of migrant workers having joined Australia’s extractive industries infrastructure and commercial construction industry, this suggests the need for some investigation. A particular issue is that lack of H&S communication is one of the key factors leading to construction industry accidents/ incidents as it prevents workers from effectively receiving H&S safety training and acquiring H&S information. Migrant workers whose first languages are not English are particularly affected by this problem and ways are needed to improve their situation. The research aims to do this by evaluating the H&S communication problems of migrant workers and identify an effective H&S communication structure. An overview of the challenge being addressed by the research is firstly provided, followed by a description of the research framework, and a report of the initial findings, from which recommendations are provided for improving H&S performance in the construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Speed is recognised as a key contributor to crash likelihood and severity, and to road safety performance in general. Its fundamental role has been recognised by making Safe Speeds one of the four pillars of the Safe System. In this context, impact speeds above which humans are likely to sustain fatal injuries have been accepted as a reference in many Safe System infrastructure policy and planning discussions. To date, there have been no proposed relationships for impact speeds above which humans are likely to sustain fatal or serious (severe) injury, a more relevant Safe System measure. A research project on Safe System intersection design required a critical review of published literature on the relationship between impact speed and probability of injury. This has led to a number of questions being raised about the origins, accuracy and appropriateness of the currently accepted impact speed–fatality probability relationships (Wramborg 2005) in many policy documents. The literature review identified alternative, more recent and more precise relationships derived from the US crash reconstruction databases (NASS/CDS). The paper proposes for discussion a set of alternative relationships between vehicle impact speed and probability of MAIS3+ (fatal and serious) injury for selected common crash types. Proposed Safe System critical impact speed values are also proposed for use in road infrastructure assessment. The paper presents the methodology and assumptions used in developing these relationships. It identifies further research needed to confirm and refine these relationships. Such relationships would form valuable inputs into future road safety policies in Australia and New Zealand.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background It is often believed that by ensuring the ongoing completion of competency documents and life-long learning in nursing practice guarantees quality patient care. This is probably true in most cases where it provides reassurances that the nursing team is maintaining a safe “generalised” level of practice. However, competency does not always promise quality performance. There are a number of studies that have reported differences in what practitioners know and what they actually do despite being deemed competent. Aim The aim of this study was to assess whether our current competency documentation is fit for purpose and to ascertain whether performance assessment needs to be a key component in determining competence. Method 15 nurses within a General ICU who had been on the unit <4 years agreed to participate in this project. Using participant observation and assessing performance against key indicators of the Benner Novice to Expert5 model the participants were supported and assessed over the course of a ‘normal’ nursing shift. Results The results were surprising both positively and negatively. First, the nurses felt more empowered in their clinical decision making skills; second, it identified individual learning needs and milestones in educational development. There were some key challenges identified which included 5 nurses over estimating their level of competence, practice was still very much focused on task acquisition and skill and surprisingly some nurses still felt dominated by the other health professionals within the unit. Conclusion We found that the capacity and capabilities of our nursing workforce needs continual ongoing support especially if we want to move our staff from capable task-doer to competent performers. Using the key novice to expert indicators identified the way forward for us in how we assess performance and competence in practice particularly where promotion to higher grades is based on existing documentation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Typically only a limited number of consortiums are able to competitively bid for Public Private Partnership (PPP) projects. Consequently, this may lead to oligopoly pricing constraints and ineffective competition, thus engendering ex ante market failure. In addressing this issue, this paper aims to determine the optimal number of bidders required to ensure a healthy level of competition is available to procure major infrastructure projects. The theories of Structure-Conduct-Performance (SCP) paradigm; Game Theory and Auction Theory and Transaction Cost Economics are reviewed and discussed and used to produce an optimal level of competition for major infrastructure procurement, that prevents market failure ex ante (lack of competition) and market failure ex post (due to asymmetric lock-in).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Public-Private Partnerships (PPP) are established globally as an important mode of procurement and the features of PPP, not least of which the transfer of risk, appeal to governments and particularly in the current economic climate. There are many other advantages of PPP that are claimed as outweighing the costs of PPP and affording Value for Money (VfM) relative to traditionally financed projects or non-PPP. That said, it is the case that we lack comparative whole-life empirical studies of VfM in PPP and non-PPP. Whilst we await this kind of study, the pace and trajectory of PPP seem set to continue and so in the meantime, the virtues of seeking to improve PPP appear incontrovertible. The decision about which projects, or parts of projects, to offer to the market as a PPP and the decision concerning the allocation or sharing risks as part of engagement of the PPP consortium are among the most fundamental decisions that determine whether PPP deliver VfM. The focus in the paper is on latter decision concerning governments’ attitudes towards risk and more specifically, the effect of this decision on the nature of the emergent PPP consortium, or PPP model, including its economic behavior and outcomes. This paper presents an exploration into the extent to which the seemingly incompatible alternatives of risk allocation and risk sharing, represented by the orthodox/conventional PPP model and the heterodox/alliance PPP model respectively, can be reconciled along with suggestions for new research directions to inform this reconciliation. In so doing, an important step is taken towards charting a path by which governments can harness the relative strengths of both kinds of PPP model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Innovation enables organisations to endure by responding to emergence and to improve efficiency. Innovation in a complex organisation can be difficult due to complexities contributing to slow decision-making. Complex projects fail due to an inability to respond to emergence which consumes finances and impacts on resources and organisational success. Therefore, for complex organisations to improve on performance and resilience, it would be advantageous to understand how to improve the management of innovation and thus, the ability to respond to emergence. The benefits to managers are an increase in the number of successful projects and improved productivity. This study will explore innovation management in a complex project based organisation. The contribution to the academic literature will be an in-depth, qualitative exploration of innovation in a complex project based organisation using a comparative case study approach.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many countries over the last decade, have used performance-based contracting (PBC) to manage and maintain roads. The implementation of PBC provides additional benefits for the government/public such as cost savings and improved conditions of contracted road assets. In Australia, PBC is already being implemented on all categories of roads: national, state, urban and rural. Australian PBC arrangement is designed to turn over control and responsibility for roadway system maintenance, rehabilitation, and capital improvement projects to private contractors. Contractors’ responsibilities include determination of treatment types, the design, programming and the undertaking of works needed to maintain road networks at predetermined performance levels. Indonesia initiated two PBC pilot projects in 2011, the Pantura Section Demak-Trengguli (7.68 kilometers) in Central Java Province and Section Ciasem-Pamanukan (18.5 kilometers) in West Java Province. Both sections are categorized as national roads. The contract duration for both of these projects is four years. To facilitate a possible way forward, it is proposed to conduct a study to understand Australia's experiences of advancing from pilot projects to nation-wide programs using PBC. The study focuses on the scope of contracts, bidding processes, risk allocation, and key drivers, using relevant PBC case studies from Australia. Recommendations for future PBC deployment nation-wide should be based on more research associated with risk allocation. This will include investigation of standard conditions of contract. Implications of the contract clauses for the risk management strategy to be adopted by contractors. Based on the nature of risks, some are best managed by the project owner. It is very important that all parties involved to be open to the new rules of contract and to convince themselves about the potential increased benefits of the use of PBC. The most recent states of challenging issues were explored and described.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.