97 resultados para price limit


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The decision of Wilson J in Wan and Ors v NPD Property Development Pty Ltd [2004] QSC 232 also concerned the operation of the Land Sales Act 1984 (Qld) (‘the Act’). As previously noted, s 8(1) of the Act provides that a proposed allotment of freehold land might be sold only in certain circumstances. An agreement made in contravention of s 8(1) is void. Section 19 allows a purchaser (and others) to apply for an exemption from any of the provisions of Pt 2. By s 19(6), notwithstanding s 8, a person may agree to sell a proposed allotment if the instrument that binds a person to purchase the proposed allotment is conditional upon the grant of an exemption. By s 19(7) an application for exemption must be made ‘within 30 days after the event that marks the entry of a purchaser upon the purchase of the proposed allotment.’

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Estimates of the half-life to convergence of prices across a panel of cities are subject to bias from three potential sources: inappropriate cross-sectional aggregation of heterogeneous coefficients, presence of lagged dependent variables in a model with individual fixed effects, and time aggregation of commodity prices. This paper finds no evidence of heterogeneity bias in annual CPI data for 17 U.S. cities from 1918 to 2006, but correcting for the “Nickell bias” and time aggregation bias produces a half-life of 7.5 years, shorter than estimates from previous studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

New knowledge has raised a concern about the cost-ineffective design methods and the true performance of railroad prestressed concrete ties. Because of previous knowledge deficiencies, railway civil and track engineers have been aware of the conservative design methods for structural components in any railway track that rely on allowable stresses and material strength reductions. In particular, railway sleeper (or railroad tie) is an important component of railway tracks and is commonly made of prestressed concrete. The existing code for designing such components makes use of the permissible stress design concept, whereas the fiber stresses over cross sections at initial and final stages are limited by some empirical values. It is believed that the concrete ties complying with the permissible stress concept possess unduly untapped fracture toughness, based on a number of proven experiments and field data. Collaborative research run by the Australian Cooperative Research Centre for Railway Engineering and Technologies (Rail CRC) was initiated to ascertain the reserved capacity of Australian railway prestressed concrete ties that were designed using the existing design code. The findings have led to the development of a new limit-states design concept. This paper highlights the conventional and the new limit-states design philosophies and their implication to both the railway community and the public. © 2011 American Society of Civil Engineers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Potential to strengthen a commitment to intervene within a friendship group: – all knew the other passengers, – 3 in 4 discussed intervening with other passengers, – expectations of friends was a key predictive factor. - young women have potential and willingness to intervene in their friends’ drink driving behaviour - majority of campaigns and strategies to reduce alcohol related crashes target the driver however it is arguable that some strategies should target the young female passenger.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background The bisphosphonate, zoledronic acid (ZOL), can inhibit osteoclasts leading to decreased osteoclastogenesis and osteoclast activity in bone. Here, we used a mixed osteolytic/osteoblastic murine model of bone-metastatic prostate cancer, RM1(BM), to determine how inhibiting osteolysis with ZOL affects the ability of these cells to establish metastases in bone, the integrity of the tumour-bearing bones and the survival of the tumour-bearing mice. Methods The model involves intracardiac injection for arterial dissemination of the RM1(BM) cells in C57BL/6 mice. ZOL treatment was given via subcutaneous injections on days 0, 4, 8 and 12, at 20 and 100 µg/kg doses. Bone integrity was assessed by micro-computed tomography and histology with comparison to untreated mice. The osteoclast and osteoblast activity was determined by measuring serum tartrate-resistant acid phosphatase 5b (TRAP 5b) and osteocalcin, respectively. Mice were euthanased according to predetermined criteria and survival was assessed using Kaplan Meier plots. Findings Micro-CT and histological analysis showed that treatment of mice with ZOL from the day of intracardiac injection of RM1(BM) cells inhibited tumour-induced bone lysis, maintained bone volume and reduced the calcification of tumour-induced endochondral osteoid material. ZOL treatment also led to a decreased serum osteocalcin and TRAP 5b levels. Additionally, treated mice showed increased survival compared to vehicle treated controls. However, ZOL treatment did not inhibit the cells ability to metastasise to bone as the number of bone-metastases was similar in both treated and untreated mice. Conclusions ZOL treatment provided significant benefits for maintaining the integrity of tumour-bearing bones and increased the survival of tumour bearing mice, though it did not prevent establishment of bone-metastases in this model. From the mechanistic view, these observations confirm that tumour-induced bone lysis is not a requirement for establishment of these bone tumours.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Client owners usually need an estimate or forecast of their likely building costs in advance of detailed design in order to confirm the financial feasibility of their projects. Because of their timing in the project life cycle, these early stage forecasts are characterized by the minimal amount of information available concerning the new (target) project to the point that often only its size and type are known. One approach is to use the mean contract sum of a sample, or base group, of previous projects of a similar type and size to the project for which the estimate is needed. Bernoulli’s law of large numbers implies that this base group should be as large as possible. However, increasing the size of the base group inevitably involves including projects that are less and less similar to the target project. Deciding on the optimal number of base group projects is known as the homogeneity or pooling problem. A method of solving the homogeneity problem is described involving the use of closed form equations to compare three different sampling arrangements of previous projects for their simulated forecasting ability by a cross-validation method, where a series of targets are extracted, with replacement, from the groups and compared with the mean value of the projects in the base groups. The procedure is then demonstrated with 450 Hong Kong projects (with different project types: Residential, Commercial centre, Car parking, Social community centre, School, Office, Hotel, Industrial, University and Hospital) clustered into base groups according to their type and size.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Abstract Objective: To explore whether area-level socioeconomic position or the form of retail stream (conventional versus farmers’ market) are associated with differences in the price, availability, variety and quality of a range of fresh fruit and vegetables. Design: A multi-site cross-sectional pilot study of farmers’ markets, supermarkets and independent fruit and vegetable retailers. Each was surveyed to assess the price, availability, variety and quality of 15 fruit and 18 vegetable items. Setting: Retail outlets were located in South-East Queensland. Subjects: Fifteen retail outlets were surveyed (five of each retail stream). Results: Average basket prices were not significantly different across the socioeconomic spectrum however prices in low socioeconomic areas were cheapest. Availability, variety, and quality did not differ across levels of socioeconomic position however the areas with the most socioeconomic disadvantage scored poorest for quality and variety. Supermarkets had significantly better fruit and vegetable availability than farmers’ markets however price, variety and quality scores were not different across retail streams. Results demonstrate a trend to fruit and vegetable prices being more expensive at farmers’ markets, with the price of the Fruit basket being significantly greater at the organic farmer’s market compared with the non-organic farmers’ markets. Conclusions: Neither area-level socioeconomic position nor the form of retail stream was significantly associated with differences in the availability, price, variety and quality of fruit and vegetables, except for availability which was higher in supermarkets than farmers’ markets. Further research is needed to determine what role farmers’ markets can play in affecting fruit and vegetable intake.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The railway industry has been slow to adopt limit states principles in the structural design of concrete sleepers for its tracks, despite the global take up of this form of design for almost every other type of structural element. Concrete sleeper design is still based on limiting stresses but is widely perceived by track engineers to lead to untapped reserves of strength in the sleepers. Limit design is a more rational philosophy, especially where it is based on the ultimate dynamic capacity of the concrete sleepers. The paper describes the development of equations and factors for a limit design methodology for concrete sleepers in flexure using a probabilistic evaluation of sleeper loading. The new method will also permit a cogent, defensible means of establishing the true capacity of the billions of concrete sleepers that are currently in-track around the world, leading to better utilisation of track infrastructure. The paper demonstrates how significant cost savings may be achieved by track owners.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recently updated information has raised a concern over not only the existing cost-ineffective design method but also the unrealistic analysis mode of railroad prestressed concrete sleepers. Because of the deficient knowledge in the past, railway civil engineers have been mostly aware of the over-conservative design methods for structural components in any railway track, which rely on allowable stresses and material strength reductions. Based on a number of proven experiments and field data, it is believed that the concrete sleepers which complied with the allowable stress concept possess unduly untapped fracture toughness. A collaborative research project run by the Australian Cooperative Research Centre for Railway Engineering and Technologies (RailCRC) was initiated to ascertain the reserved capacity of Australian railway prestressed concrete sleepers designed using the existing design code. The findings have led to the development of a new limit states design concept. This briefing highlights the conventional and the new limit states design philosophies and their implication to both the railway and the public community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The decision of Lai v Soineva [2011] QSC 247 in relation to the operation of standard conditions in the Queensland REIQ contract highlights a very practical issue often overlooked in the heat of a transaction .The point is relatively simple. In this instance ,the case concerned the interpretation of the printed "Building and Pest Inspection Clause" but is of relevance to the printed "Finance Clause" in the same contract as the wording and principles are identical. It highlights the issue of knowing well what is in the standard contract and not making assumptions. The case also highlights the cost to a party of dithering in making an election in a time of the essence environment