266 resultados para Projects in dispute
Resumo:
State and local governments frequently look to flagship cultural projects to improve the city image and catalyze tourism but, in the process, often overlook their potential to foster local arts development. To better understand this role, the article examines if and how cultural institutions in Los Angeles and San Francisco attract and support arts-related activity. The analysis reveals that cultural flagships have mixed success in generating arts-based development and that their ability may be improved through attention to the local context, facility and institutional characteristics, and the approach of the sponsoring agencies. Such knowledge is useful for planners to enhance their revitalization efforts, particularly as the economic development potential of arts organizations and artists has become more apparent.
Resumo:
Who, ultimately, has power? Is it the senior executive with his finger on the off switch, is it the users themselves who make the decision to participate and contribute financially, or is it those who report on the actions of the company with the ability to reach large numbers of existing and potential players? In both the gambling and gaming industries, power is up for grabs. This work undertakes to consider how norms are formed in online gaming communities; that is, how the developers and players negotiate amongst themselves both how the game will operate. Also considered is how to resolve disputes that arise, and what power and limitations each side has when they need to make an impact – from developers switching off the server, to players quitting en-mass or causing disruption within the environment (using the recent example of Eve Online). Outside of the direct sphere of the game however a third party lurks – commentators. These may take the form of well established review sites, community forums or, in the case of the gambling industry, dispute resolution services but their power stake is clear – by publicising and interpreting the acts of both developers and players, they are in a position to influence whether current players stick with a company, whether new players join a company and how the company is perceived in the wider community.
Resumo:
Based on an investigation of 106 projects involving the use of building information modelling (BIM), this paper examines current BIM practices in China, and assesses how various practices alter their effectiveness. The results reveal that in current practice BIM is principally employed as a visualization tool, and how it is implemented is significantly associated with project characteristics. BIM use in the majority of the surveyed projects is seen to have positive outcomes, with the benefits of improved task effectiveness being more substantial than those related to efficiency improvement. The results also provide evidence that project characteristics significantly influence the success of BIM use; however, more substantial contributing factors to BIM effectiveness are the extent of integrated use and client/owner support. While indicating that current BIM practices involve both technological and organizational problems, the findings also provide insights into how the potential for BIM could be better exploited within the industry.
Resumo:
In current practice, urban-rural development has been regarded as one of the key pillars in driving regenerative development that includes economic, social, and environmental balance. In association with rapid urbanization, an important contemporary issue in China is that its rural areas are increasingly lagging behind urban areas in their development and a coordinated provision of public facilities in rural areas is necessary to achieve a better balance. A model is therefore introduced for quantifying the effect of individual infrastructure projects on urban-rural balance (e-UR) by focusing on two attributes, namely, efficiency and equity. The model is demonstrated through a multi-criteria model, developed with data collected from infrastructure projects in Chongqing, with the criteria values for each project being scored by comparing data collected from the project involved with e-UR neutral “benchmark” values derived from a survey of experts in the field. The model helps evaluate the contribution of the projects to improving rural-urban balance and hence enable government decision-makers for the first time to prioritize future projects rigorously in terms of their likely contribution too.
Resumo:
Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.
Resumo:
This research aims to explore and identify political risks on a large infrastructure project in an exaggerated environment to ascertain whether sufficient objective information can be gathered by project managers to utilise risk modelling techniques. During the study, the author proposes a new definition of political risk; performs a detailed project study of the Neelum Jhelum Hydroelectric Project in Pakistan; implements a probabilistic model using the principle of decomposition and Bayes probabilistic theorem and answers the question: was it possible for project managers to obtain all the relevant objective data to implement a probabilistic model?
Resumo:
Although rework is a common phenomenon in the Chinese construction industry and significantly affects project success, the reasons for rework remain largely unknown and most construction companies are unable to manage the issue effectively. To investigate the causes of rework in construction projects, a total of 39 causes were first identified through a comprehensive literature review and semi-structured interviews with 13 experienced construction professionals in China. A questionnaire survey was further conducted to prioritize these causes, in which unclear project process management, poor quality of construction technology, and the use of poor construction materials rank the highest. Finally, a factor analysis revealed 11 major underlying dimensions of these causes, relating to design management, communication management, field management, project scope management, project process management, active rework, project plan changes, subcontractor management, contract management, owner capability, and the external environment. The contribution of this work lies in its examination of the underlying causes of rework perceived by construction professionals in the world’s largest developing country, which is characterized by its unique economic and social systems. In particular, newly identified causes of contract management, active rework, and scope management help expand existing knowledge of the underlying causes of rework for the global construction community.
Resumo:
Corruption has been identified as the greatest obstacle to economic and social development. Public construction projects, in particular, face high corruption risk as public construction sector has been consecutively deemed as the most corrupt one. Despite considerable efforts have been undertaken to measure corruption at a nation level, few focus on the measurement of corruption in construction projects. This paper develops a fuzzy measurement model for the potential corruption in public construction projects in China. Through semi-structured interviews with 14 experts, followed by a questionnaire survey with 188 respondents, 24 measurement items of corruption were identified and further categorized into five constructs. The fuzzy set theory was then adopted to quantify each measurement item, construct and the overall corruption level. This model can facilitate in evaluating, revealing and monitoring corruption in public construction projects. Although this study focuses on measuring corruption in public construction projects in China, similar research methods can be applied in other countries around the world and thus contribute to the global body of knowledge of corruption.
Resumo:
This thesis developed a thematic structure for evaluating social externalities of major resource projects using a mixed methods approach and structural equation modelling. The implications offer important insights into the extent quality of life is being influenced by coal seam gas projects in regional communities in Southeast Queensland, Australia. Findings show that unresolved concerns of community residents about environmental and social impacts contribute to lower life-satisfaction, inhibit the community to plan for the future, and lead to a weaker local economy.
Resumo:
This paper outlines an approach for teaching Marketing Principles in an MBA course through service-learning to enable adult learners to connect the lectures’ marketing content to a real-world marketing project. During the course, 40 students in groups of four to five individuals were involved in eight different client-sponsored marketing projects executed simultaneously. The rationale, planning and management of this approach utilised current research on service-learning, living cases and client-sponsored projects in marketing education. The experimental curriculum design is presented in a timeline that mirrors the preparation and management of the group projects and the considerations to be taken into account when initiating and facilitating the projects. Reflections from this iteration of the service-learning design suggest the importance of: detailed project planning, the involvement of students in choosing the projects, the introduction of forms and feedback loops, the role of the instructor in facilitating the students and managing expectations, and the role of the company representative in supporting the groups.
Resumo:
With the current emerging development pattern in Malaysia, Malaysian government has enthusiastically promoted green procurement approach that will help the construction project being green. Previous studies highlighted that the concept of green procurement is still very new to the Malaysian construction industry, and this increases the needs for further research in this area. This paper addresses the needs of guidelines for stakeholders to procure environmentally-friendly construction. Currently, there is a limited practical guideline for stakeholders to procure green projects. This paper discusses the progress to date of a research project aimed at developing a green procurement framework for construction projects in the Malaysian construction industry. This framework will guide the stakeholders to plan the green procurement implementation to procure a construction projects. Through literature and expert opinion, this paper explores the list of green practices within procurement practices which becomes the basis to develop a survey instrument that will be used in the later part of this study. The paper will shed useful information for construction researchers and practitioners in exploring the green procurement concept for construction industry in Malaysia.
Resumo:
Since 2003, Mainland China has been promoting the public–private partnership (PPP) procurement model in the waste-to-energy incineration sector to reduce the waste burying rate and improve environmental quality. Five critical risk factors (CRFs) that affect the construction and operation of waste-to-energy incineration projects have been identified from real-life risk events of 14 PPP waste-to-energy incineration plants through content analysis. These risk factors are insufficient waste supply, disposal of non-licensed waste, environmental risk, payment risk, and lack of supporting infrastructure. A recently completed PPP waste-to-energy incineration plant, the Shanghai Tianma project, was investigated to learn from the effective management of CRFs. First-hand data about the Shanghai Tianma project was collected, with a focus on project negotiation and concession agreement. Lessons learned about risk management were acquired. This paper presents a detailed study of the contractual structure, risk sharing scheme, risk response measures to CRFs, and project transfer of a PPP project. The study results will provide governments with management implications to prepare equitable concession agreements and benefit private investors by effectively mitigating and managing risks in future PPP waste-to-energy incineration projects.
Resumo:
Theories of deliberative politics position grass-roots community members as more than spectators of politics, and instead recognize their capacity for political engagement by discussing and evaluating options in order to make decisions about issues affecting community life. The processes and products of journalism can assist deliberative politics by providing community members with information resources that are vital for understanding the root causes of problems, weighing up competing claims, forming networks around shared concerns, reaching decisions and undertaking action. This article presents the findings of case studies of four community–classroom projects--one each from Australia, New Zealand, the United States and South Africa--that develop the capacity of journalism students to be effective contributors to deliberative politics. The research points to the importance of learning activities that prepare students to work in diverse communities, map significant community places and structures, identify leaders and stakeholders, engage in respectful dialogue about problems and perspectives, and appreciate community frames and values.
Resumo:
Enterprise System (ES) implementation and management are knowledge intensive tasks that inevitably draw upon the experience of a wide range of people with diverse knowledge capabilities. Knowledge Management (KM) has been identified as a critical success factor in ES projects. Despite the recognized importance of managing knowledge for ES benefits realization, systematic attempts to conceptualize KM-structures have been few. Where the adequacy of KM-structures is assessed, the process and measures are typically idiosyncratic and lack credibility. Using the ‘KM-process’, itself based in sociology of knowledge, this paper conceptualizes four main constructs to measure the adequacy of KM-structures. The SEM model is tested using 310 responses gathered from 27 ES installations that had implemented SAP R/3. The findings reveal six constructs for KM-structure. Furthermore, the paper demonstrates the application of KM-structures in the context of ES using the Adaptive Structuration Theory. The results demonstrate that having adequate KM-structures in place, while necessary, is not sufficient. These rules and resources must be appropriated to have greater positive influence on the Enterprise System. Furthermore, the study provides empirical support for knowledge-based theory by illustrating the importance of knowledge use/re-use (vs. knowledge creation) as the most important driver in the process of KM.