230 resultados para Entrepreneurial organisational environment and risk management


Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Safety-compromising accidents occur regularly in the led outdoor activity domain. Formal accident analysis is an accepted means of understanding such events and improving safety. Despite this, there remains no universally accepted framework for collecting and analysing accident data in the led outdoor activity domain. This article presents an application of Rasmussen's risk management framework to the analysis of the Lyme Bay sea canoeing incident. This involved the development of an Accimap, the outputs of which were used to evaluate seven predictions made by the framework. The Accimap output was also compared to an analysis using an existing model from the led outdoor activity domain. In conclusion, the Accimap output was found to be more comprehensive and supported all seven of the risk management framework's predictions, suggesting that it shows promise as a theoretically underpinned approach for analysing, and learning from, accidents in the led outdoor activity domain.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The safety risk management process describes the systematic application of management policies, procedures and practices to the activities of communicating, consulting, establishing the context, and identifying, analysing, evaluating, treating, monitoring and reviewing risk. This process is undertaken to provide assurances that the risks of a particular unmanned aircraft system activity have been managed to an acceptable level. The safety risk management process and its outcomes form part of the documented safety case necessary to obtain approvals for unmanned aircraft system operations. It also guides the development of an organisation’s operations manual and is a primary component of an organisation’s safety management system. The aim of this chapter is to provide existing risk practitioners with a high level introduction to some of the unique issues and challenges in the application of the safety risk management process to unmanned aircraft systems. The scope is limited to safety risks associated with the operation of unmanned aircraft in the civil airspace system and over inhabited areas. The structure of the chapter is based on the safety risk management process as defined by the international risk management standard ISO 31000:2009 and draws on aviation safety resources provided by International Civil Aviation Organization, the Federal Aviation Administration and U.S. Department of Defense. References to relevant aviation safety regulations, programs of research and fielded systems are also provided.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Not for profit organisations face significant challenges in managing organisational risk. In this regard not-for-profits are not unique but they are distinguishable from their 'for-profit' counterparts in that they are less likely to have the resources to find sufficient risk management strategies and plans, are very vunerable to cyclical changes in the insurance market and are not usually in a position to pass on the costs of increased premiums to third parties such as consumers of their services. This article explores the nature and extent of risks faced by the not-for-profit sector; the appropriateness and scope of risk management to reduce and manage the likelihood and incidence of risk; and the types of insurance and options to cover risks that materialise. It concludes with a recommendation for a potential course of action.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Work in the Australian construction industry is fraught with risk and the potential for serious harm. The industry is consistently placed within the three most hazardous industries to work along with other industries such as mining and transport (National Occupational Health and Safety Commission, 2003). In the 2001 to 2002 period, construction work killed 39 people and injured 13,250 more. Hence, more effort is required to reduce the injury rate and maximise the value of the rehabilitation/back-to-work process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

All civil and private aircraft are required to comply with the airworthiness standards set by their national airworthiness authority and throughout their operational life must be in a condition of safe operation. Aviation accident data shows that over twenty percent of all fatal accidents in aviation are due to airworthiness issues, specifically aircraft mechanical failures. Ultimately it is the responsibility of each registered operator to ensure that their aircraft remain in a condition of safe operation, and this is done through both effective management of airworthiness activities and the effective program governance of safety outcomes. Typically, the projects within these airworthiness management programs are focused on acquiring, modifying and maintaining the aircraft as a capability supporting the business. Program governance provides the structure through which the goals and objectives of airworthiness programs are set along with the means of attaining them. Whilst the principal causes of failures in many programs can be traced to inadequate program governance, many of the failures in large scale projects can have their root causes in the organisational culture and more specifically in the organisational processes related to decision-making. This paper examines the primary theme of project and program based enterprises, and introduces a model for measuring organisational culture in airworthiness management programs using measures drawn from 211 respondents in Australian airline programs. The paper describes the theoretical perspectives applied to modifying an original model to specifically focus it on measuring the organisational culture of programs for managing airworthiness; identifying the most important factors needed to explain the relationship between the measures collected, and providing a description of the nature of these factors. The paper concludes by identifying a model that best describes the organisational culture data collected from seven airworthiness management programs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: Recent knowledge management (KM) literature suggests that KM activities are influenced by the elements of the internal business environment (BE) of organisations. This paper attempts to provide some unique insights into the contextual input of the KM process through empirically identifying the major factors (i.e. “forces”) within the internal BE of construction organisations operating in Hong Kong, and investigating their impact on the intensity of KM activities. Design/methodology/approach: A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal BE and intensity of KM activities as executed by targeted organisations. A total of 149 usable responses were received from 99 organisations representing about 38 percent of the research population. In parallel, to the survey, a total of 15 semi-structured interviews were undertaken to provide more insights into the phenomenon under investigation. Findings: Supported by the empirical and qualitative evidence, this study established that firstly, both organisational and technical environments have the capacity to either positively or negatively impact the intensity of KM activities, and both environments serve as stimuli in increasing each other's dynamism; secondly, certain types of KM activities are stronger “energy receivers” and easily to be “powered up” by manipulating factors representing these two environments. Then, through interactions between KM activities, the intensity of the whole strategic KM cycle will be increased thus helping to strengthen organisational competitive advantage.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Scarcity of large parcels of land in well-serviced areas has motivated people to re-develop brownfield land. Most of brownfield land has high risk of contamination from wide range of industrial activities such as gas works, factories, railway land and waste tips. In addition, people who live in brownfield re-development areas may be exposed to health hazards. This paper discusses public perceptions on the brownfield sites and also the risk and mitigation strategy to promote brownfield re-development. Data is gathered from face to face survey of fifty respondents who work in Brisbane Central Business District (CBD) and interview with an expert on remediation of contaminated land. From this preliminary study, it is found that majority of the population are not aware of any brownfield sites near their residence and those who are aware showed very little concern on their proximity to the site. Further discussion on the paper based on a simple cross tabulation analysis. The main risk mitigation strategy of re-development of brownfield site is by updating the registration through Environmental Management Register (EMR) and Contaminated Land Register (CLR). In addition, insurance may offer to cover cost overruns on remediation cost.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Jakarta, Indonesia’s chronic housing shortage poses multiple challenges for contemporary policy-makers. While it may be in the city’s interest to increase the availability of housing, there is limited land to do so. Market pressures, in tandem with government’s desire for housing availability, demand consideration of even marginal lands, such as those within floodplains, for development. Increasingly, planning for a flood resilient Jakarta is complicated by a number of factors, including: the city is highly urbanized and land use data is limited; flood management is technically complex, creating potential barriers to engagement for both decision-makers and the public; inherent uncertainty exists throughout modelling efforts, central to management; and risk and liability for infrastructure investments is unclear. These obstacles require localized watershed-level participatory planning to address risks of flooding where possible and reduce the likelihood that informal settlements occur in areas of extreme risk. This paper presents a preliminary scoping study for determination of an effective participatory planning method to encourage more resilient development. First, the scoping study provides background relevant to the challenges faced in planning for contemporary Jakarta. Second, the study examines the current use of decision-support tools, such as Geographic Information Systems (GIS), in planning for Jakarta. Existing capacity in the use of GIS allows for consideration of the use of an emerging method of community consultation - Multi-Criteria Decision-Making (MCDM) support systems infused with geospatial information - to aid in engagement with the public and improve decision-making outcomes. While these methods have been used in Australia to promote stakeholder engagement in urban intensification, the planned research will be an early introduction of the method to Indonesia. As a consequence of this intervention, it is expected that planning activities will result in a more resilient city, capable of engaging with disaster risk management in a more effective manner.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper we argue that rationalist ‘predict then act’ approaches to disaster risk management (DRM) policy promote unrealistic public expectations of DRM provisions, the avoidance of decision making by political elites, an over-reliance on technical expertise and engineering solutions to reducing exposure to natural events, and a reactive approach to DRM overall. We propose an alternative incrementalist approach that focuses on managing uncertainties rather than reducing them and building resilience not simply through the reduction of hazard exposure, but also through the ongoing reduction of community vulnerability, the explicit consideration of normative priorities, and more effective community engagement in climate risk debates.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Emergency management and climate change adaptation will increasingly challenge all levels of government because of three main factors. First, Australia is extremely vulnerable to the impacts of climate change, particularly through the increasing frequency and/or intensity of disasters such as floods and bushfires. Second, the system of government that divides powers by function and level can often act as a barrier to a well-integrated response. Third, policymaking processes struggle to cope with such complex inter-jurisdictional issues. This paper discusses these factors and explores the nature of the challenge for Australian governments. Investigations into the 2009 Victorian bushfires, the 2011 Perth Hills bushfires, and the 2011 Brisbane floods offer an indication of the challenges ahead and it is argued that there is a need to: improve community engagement and communication; refocus attention on resilience; improve interagency communication and collaboration; and, develop institutional arrangements that support continual improvement and policy learning. These findings offer an opportunity for improving responses as well as a starting point for integrating disaster risk management and climate change adaptation policies. The paper is based on the preliminary findings of an NCCARF funded research project: The Right Tool for the Job – Achieving climate change adaptation outcomes through improved disaster management policies, planning and risk management strategies involving Griffith University and RMIT.