384 resultados para Project performance Infrastructure


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project’s life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former’s failure cost is much lower than the latter’s

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper summarises the achievements of the Smart Skies Project, a three-year, multi-award winning international project that researched, developed and extensively flight tested four enabling aviation technologies: an electrooptical mid-air collision avoidance system, a static obstacle avoidance system, a mobile ground-based air traffic surveillance system, and a global automated airspace separation management system. The project included the development of manned and unmanned flight test aircraft, which were used to characterise the performance of the prototype systems for a range of realistic scenarios under a variety of environmental conditions. In addition to the collection of invaluable flight data, the project achieved world-firsts in the demonstration of future automated collision avoidance and separation management concepts. This paper summarises these outcomes, the overall objectives of the project, the research and the development of the prototype systems, the engineering of the flight test systems, and the results obtained from flight-testing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a shared autonomy control scheme for a quadcopter that is suited for inspection of vertical infrastructure — tall man-made structures such as streetlights, electricity poles or the exterior surfaces of buildings. Current approaches to inspection of such structures is slow, expensive, and potentially hazardous. Low-cost aerial platforms with an ability to hover now have sufficient payload and endurance for this kind of task, but require significant human skill to fly. We develop a control architecture that enables synergy between the ground-based operator and the aerial inspection robot. An unskilled operator is assisted by onboard sensing and partial autonomy to safely fly the robot in close proximity to the structure. The operator uses their domain knowledge and problem solving skills to guide the robot in difficult to reach locations to inspect and assess the condition of the infrastructure. The operator commands the robot in a local task coordinate frame with limited degrees of freedom (DOF). For instance: up/down, left/right, toward/away with respect to the infrastructure. We therefore avoid problems of global mapping and navigation while providing an intuitive interface to the operator. We describe algorithms for pole detection, robot velocity estimation with respect to the pole, and position estimation in 3D space as well as the control algorithms and overall system architecture. We present initial results of shared autonomy of a quadrotor with respect to a vertical pole and robot performance is evaluated by comparing with motion capture data.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reports the findings of an in-depth literature review, which was designed as the first phase of a study that ultimately aims to rank the importance of key governance mechanisms on collaborative construction projects, in terms of impact on value-for-money. The absence of such information in the global knowledge base has prompted the current study. Seminal research completed recently concluded that deductive evidence with regard to the performance outcomes of collaborative procurement mechanisms is currently limited (Eriksson and Westerberg 2011). The authors aim to address this gap in current understanding. The literature review identifies key features of both formal and informal mechanisms which have been applied within collaborative contracting contexts. The literature review lays a solid foundation for designing a deductive research strategy to be implemented in the second phase of the study, which will employ a large-scale quantitative survey to shed light on the governance structures of collaborative contracts, and the ways in which they impact on realisation of VfM during project delivery in the Australian infrastructure industry. The current paper aims to identify the main categories of formal and informal governance mechanisms currently being employed globally. This will provide structure for the development of the survey in the second phase of the study.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper investigates the critical role of knowledge sharing (KS) in leveraging manufacturing activities, namely integrated supplier management (ISM) and new product development (NPD) to improve business performance (BP) within the context of Taiwanese electronic manufacturing companies. The research adopted a sequential mixed method research design, which provided both quantitative empirical evidence as well as qualitative insights, into the moderating effect of KS on the relationships between these two core manufacturing activities and BP. First, a questionnaire survey was administered, which resulted in a sample of 170 managerial and technical professionals providing their opinions on KS, NPD and ISM activities and the BP level within their respective companies. On the basis of the collected data, factor analysis was used to verify the measurement model, followed by correlation analysis to explore factor interrelationships, and finally moderated regression analyses to extract the moderating effects of KS on the relationships of NPD and ISM with BP. Following the quantitative study, six semi-structured interviews were conducted to provide qualitative in-depth insights into the value added from KS practices to the targeted manufacturing activities and the extent of its leveraging power. Results from quantitative statistical analysis indicated that KS, NPD and ISM all have a significant positive impact on BP. Specifically, IT infrastructure and open communication were identified as the two types of KS practices that could facilitate enriched supplier evaluation and selection, empower active employee involvement in the design process, and provide support for product simplification and the modular design process, thereby improving manufacturing performance and strengthening company competitiveness. The interviews authenticated many of the empirical findings, suggesting that in the contemporary manufacturing context KS has become an integral part of many ISM and NPD activities and when embedded properly can lead to an improvement in BP. The paper also highlights a number of useful implications for manufacturing companies seeking to leverage their BP through innovative and sustained KS practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – Integrated supplier management (ISM), new product development (NPD) and knowledge sharing (KS) practices are three primary business activities utilised to enhance manufacturers' business performance (BP). The purpose of this paper is to empirically investigate the relationships between these three business activities (i.e. ISM, NPD, KS) and BP in a Taiwanese electronics manufacturing context. Design/methodology/approach – A questionnaire survey is first administered to a sample of electronic manufacturing companies operating in Taiwan to elicit the opinions of technical and managerial professionals regarding business activities and BP within their companies. A total of 170 respondents from 83 companies respond to the survey. Factor, correlation and path analysis are undertaken on this quantitative data set to derive the key factors which leverage business outcomes in these companies. Following empirical analysis, six semi-structured interviews are undertaken with manufacturing executives to provide qualitative insights into the underlying reasons why certain business activity factors are the strongest predictors of BP. Findings – The investigation shows that the ISM, NPD and KS constructs all play an important role in the success of company operations and creating business outcomes. Specifically, the key factors within these constructs which influenced BP are: supplier evaluation and selection; design simplification and modular design; information technology infrastructure and systems and open communication. Accordingly, sufficient financial and human resources should be allocated to these important activities to derive accelerated rates of improved BP. These findings are supported by the qualitative interviews with manufacturing executives. Originality/value – The paper depicts the pathways to improved manufacturing BP, through targeting efforts into the above-mentioned factors within the ISM, NPD and KS constructs. Based on the empirical path model, and the specific insights derived from the explanatory interviews with manufacturing executives, the paper also provides a number of practical implications for manufacturing companies seeking to enhance their BP through improved operational activities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – Within the construction industry there is a growing awareness of the need for linking knowledge management (KM) to business strategy, organisational objectives and existing performance measures. This study was undertaken within the context of construction organisations, and attempts to provide the empirical evidence about the relationships between KM activities and organisational business performance. Design/methodology/approach – A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to investigate the opinions of construction professionals regarding the intensity of KM activities and business performance within their organisations. In parallel to the survey, semi-structured interviews were undertaken to provide qualitative insights that helped to clarify and deepen understanding of the KM process within the context of the research target. Findings – The investigation shows that knowledge utilisation is the strongest contributor to general business performance. In addition, the impact of KM activities on the lagging performance indicators of the Balanced Scorecard (BSC), such as “financial performance”, is in an indirect manner, and through the leading indicators such as performance from “internal process” as well as “learning and growth” perspectives. Originality/value – The study empirically establishes the linkage between intensity of KM activities and business performance, and demonstrates that KM strategies need to be explicitly formulated and measured according to organisational business objectives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction practitioners often experience unexpected results of their scheduling-related decisions. This is mainly due to lack of understanding of the dynamic nature of construction system. However, very little attention has been given to its significant importance and few empirical studies have been undertaken on this issue. This paper, therefore, analyzes the effect of aggressive scheduling, overtime, resource adding, and schedule slippage on construction performance, focusing on workers’ reactions to those scheduling decisions. Survey data from 102 construction practitioners in 38 construction sites are used for the analysis. The results indicate that efforts to increase work rate by working overtime, resource adding, and aggressive scheduling can be offset due to losses in productivity and quality. Based on the research findings, practical guidelines are then discussed to help site managers to effectively deal with the dynamics of scheduling and improve construction performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Accelerating a project can be rewarding. The consequences, however, can be troublesome if productivity and quality are sacrificed for the sake of remaining ahead of schedule, such that the actual schedule benefits are often barely worth the effort. The tradeoffs and paths of schedule pressure and its causes and effects are often overlooked when schedule decisions are being made. This paper analyses the effects that schedule pressure has on construction performance, and focuses on tradeoffs in scheduling. A research framework has been developed using a causal diagram to illustrate the cause-and-effect analysis of schedule pressure. An empirical investigation has been performed by using survey data collected from 102 construction practitioners working in 38 construction sites in Singapore. The results of this survey data analysis indicate that advantages of increasing the pace of work—by working under schedule pressure—can be offset by losses in productivity and quality. The negative effects of schedule pressure arise mainly by working out of sequence, generating work defects, cutting corners, and losing the motivation to work. The adverse effects of schedule pressure can be minimized by scheduling construction activities realistically and planning them proactively, motivating workers, and by establishing an effective project coordination and communication mechanism.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With the growth in project management as a form of work organisation in many sectors of the economy has come the significant rise in the number of project managers and project team members. This change in work organisation brings issues in forging career paths and determining career support in work situations that are often dynamic, short lived and intense. In the relatively small but substantially robust Australian economy, a unique labour market and the tyranny of distance bring their own difficulties. Innovative and collaborative project structures and increasing prevalence of contract work provide both challenges and opportunities for new career pathways in many industries. A growing percentage of Australia's workforce is employed in project-based or project-oriented organisations, leading to the claim that Australia is a project-based economy. This provided a context for our research into the career paths and the issues of career management for project managers working in a project based economy. Using in-depth interviews with project managers from three industry areas we found generational and gender differences in experiences of work, workplace support and mentoring for career development. For a continued strong performance in this economy,organisations that employ project personnel will need to consider how they will ensure the supply of high quality project professionals into the future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Debate about the relationships between business planning and performance has been active for decades (Bhidé, 2000; Mintzberg, 1994). While results have been inconclusive, this topic still strongly divides the research community (Brinckmann et al., 2010; Chwolka & Raith, 2011; Delmar & Shane, 2004; Frese, 2009; Gruber, 2007; Honig & Karlsson, 2004). Previous research explored the relationships between innovation and the venture creation process (Amason et al., 2006, Dewar & Dutton, 1986; Jennings et al., 2009). However, the relationships between business planning and innovation have mostly been invoked indirectly in the strategy and entrepreneurship literatures through the notion of uncertainty surrounding the development of innovation. Some posited that planning may be irrelevant due to the iterative process, the numerous changes innovation development entails and the need to be flexible (Brews & Hunt, 1999). Others suggested that planning may facilitate the achievement of goals and overcoming of obstacles (Locke and Latham, 2000), guide the venture in its allocation of resources (Delmar and Shane, 2003) and help to foster the communication about the innovation being developed (Liao & Welsh, 2008). However, the nature and extents of the relationships between business planning, innovation and performance are still largely unknown. Moreover, if the reasons why ventures should engage (Frese, 2009) –or not- (Honig, 2004) in business planning have been investigated quite extensively (Brinckmann et al., 2010), the specific value of business planning for nascent firms developing innovation is still unclear. The objective of this paper is to shed some light on these important aspects by investigating the two following questions on a large sample of random nascent firms: 1) how is business planning use over time by new ventures developing different types and degrees of innovation? 2) how do business planning and innovation impact the performance of the nascent firms? Methods & Key propositions This PSED-type study draws its data from the first three waves of the CAUSEE project where 30,105 Australian households were randomly contacted by phone using a methodology to capture emerging firms (Davidsson, Steffens, Gordon, Reynolds, 2008). This screening led to the identification of 594 nascent ventures (i.e., firms that were not operating yet at the time of the identification) that were willing to participate in the study. Comprehensive phone interviews were conducted with these 594 ventures. Likewise, two comprehensive follow-ups were organised 12 months and 24 months later where 80% of the eligible cases of the previous wave completed the interview. The questionnaire contains specific sections investigating business plans such as: presence or absence, degree of formality and updates of the plan. Four types of innovation are measured along three degrees of intensity to produce a comprehensive continuous measure ranging from 0 to 12 (Dahlqvist & Wiklund, 2011). Other sections informing on the gestation activities, industry and different types of experiences will be used as controls to measure the relationships and the impacts of business planning and innovation on the performance of nascent firms overtime. Results from two rounds of pre-testing informed the design of the instrument included in the main survey. The three waves of data are used to first test and compare the use of planning amongst nascent firms by their degrees of innovation and then to examine their impact on performance overtime through regression analyses. Results and Implications Three waves of data collection have been completed. Preliminary results show that on average, innovative firms are more likely to have a business plans than their low innovative counterpart. They are also most likely to update their plan suggesting a more continuous use of the plan over time than previously thought. Further analyses regarding the relationships between business planning, innovation and performance are undergoing. This paper is expected to contribute to the literature on business planning and innovation by measuring quantitatively their impact on nascent firms activities and performance at different stages of their development. In addition, this study will shed a new light on the business planning-performance relationship by disentangling plans, types of nascent firms regarding their innovation degres and their performance over time. Finally, we expect to increase the understanding of the venture creation process by analysing those questions on nascent firms from a large longitudinal sample of randomly selected ventures. We acknowledge the results from this study will be preliminary and will have to be interpreted with caution as the business planning-performance is not a straightforward relationship (Brinckmann et al., 2010). Meanwhile, we believe that this study is important to the field of entrepreneurship as it provides some much needed insights on the processes used by nascent firms during their creation and early operating stages.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This is a summative evaluation of the Stronger Smarter Learning Communities (SSLC) project that examines whether and how the SSLC project had an impact on Australian state schools which adopted its models and approaches. Drawing from qualitative and quantitative data sets, it also presents the largest scale and most comprehensive analysis of Indigenous education practices and outcomes to date. It includes empirical findings on: success in changing school ethos and community engagement; challenges in progress at closure of the 'gap' in conventionally measured achievement and performance; schools' and principals' choices in curriculum and instruction; profiles of teachers' and principals' training and views on teacher education; and a strong emphasis on community and school Indigenoous voices and views on Indigenous education.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fluid Infrastructure: Landscape Architecture Exhibition: This exhibition showcases the work of 4th Year undergraduate landscape architecture students in response to the 2011 Queensland floods through five installations: Systima Fluid Flux Flex Fluid Connectivity The Floods Verge Fluid Evolution The focus of these installations is the post-flood conditions of Brisbane’s riverside public infrastructure, within a scenario of flood as a normalised event. It recognises that within this scenario, parts of this city cannot be described as definitively ‘land’ or ‘water,’ but are best described as ‘fluid terrains’(Mathur, A. and Da Cunha, D. 2006). The landscape design propositions within the five installations include public transport diversification (RiverRats) schemes, greenspace elevations, ephemeral gardens and evolving landscapes, creative interpretation and warning devices and systems. These propositions do not resist fluid conditions, but work with them to propose a more resilient urban river landscape than Brisbane currently has. This QUT exhibition was developed as part of the 2011 Flood of Ideas Project (http://www.floodofideas.org.au) in partnership with Healthy Waterways (Water by Design), State Library of Queensland (The Edge), Brisbane City Council, Australian Institute of Architects, University of Queensland, Green Cross Australia, Stormwater Industry Association.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents an Image Based Visual Servo control design for Fixed Wing Unmanned Aerial Vehicles tracking locally linear infrastructure in the presence of wind using a body fixed imaging sensor. Visual servoing offers improved data collection by posing the tracking task as one of controlling a feature as viewed by the inspection sensor, although is complicated by the introduction of wind as aircraft heading and course angle no longer align. In this work it is shown that the effects of wind alter the desired line angle required for continuous tracking to equal the wind correction angle as would be calculated to set a desired course. A control solution is then sort by linearizing the interaction matrix about the new feature pose such that kinematics of the feature can be augmented with the lateral dynamics of the aircraft, from which a state feedback control design is developed. Simulation results are presented comparing no compensation, integral control and the proposed controller using the wind correction angle, followed by an assessment of response to atmospheric disturbances in the form of turbulence and wind gusts