757 resultados para Project organisation
Resumo:
As computer applications become more available—both technically and economically—construction project managers are increasingly able to access advanced computer tools capable of transforming the role that project managers have typically performed. Competence at using these tools requires a dual commitment in training—from the individual and the firm. Improving the computer skills of project managers can provide construction firms with a competitive advantage to differentiate from others in an increasingly competitive international market. Yet, few published studies have quantified what existing level of competence construction project managers have. Identification of project managers’ existing computer application skills is a necessary first step to developing more directed training to better capture the benefits of computer applications. This paper discusses the yet to be released results of a series of surveys undertaken in Malaysia, Singapore, Indonesia, Australia and the United States through QUT’s School of Construction Management and Property and the M.E. Rinker, Sr. School of Building Construction at the University of Florida. This international survey reviews the use and reported competence in using a series of commercially-available computer applications by construction project managers. The five different country locations of the survey allow cross-national comparisons to be made between project managers undertaking continuing professional development programs. The results highlight a shortfall in the ability of construction project managers to capture potential benefits provided by advanced computer applications and provide directions for targeted industry training programs. This international survey also provides a unique insight to the cross-national usage of advanced computer applications and forms an important step in this ongoing joint review of technology and the construction project manager.
Resumo:
Competitive markets are increasingly driving new initiatives for shorter cycle times resulting in increased overlapping of project phases. This, in turn, necessitates improving the interfaces between the different phases to be overlapped (integrated), thus allowing transfer of processes, information and knowledge from one individual or team to another. This transfer between phases, within and between projects, is one of the basic challenges to the philosophy of project management. To make the process transfer more transparent with minimal loss of momentum and project knowledge, this paper draws upon Total Quality Management (TQM) and Business Process Re-engineering (BPR) philosophies to develop a Best Practice Model for managing project phase integration. The paper presents the rationale behind the model development and outlines its two key parts; (1) Strategic Framework and (2) Implementation Plan. Key components of both the Strategic Framework and the Implementation Plan are presented and discussed.
Resumo:
The issue of ensuring that construction projects achieve high quality outcomes continues to be an important consideration for key project stakeholders. Although a lot of quality practices have been done within the industry, establishment and achievement of reasonable levels of quality in construction projects continues to be a problem. While some studies into the introduction and development of quality practices and stakeholder management in the construction industry have been undertaken separately, no major studies have so far been completed that examine in depth how quality management practices that specifically address stakeholders’ perspectives of quality can be utilised to contribute to the ultimate constructed quality of projects. This paper encompasses and summarizes a review of the literature related to previous research undertaken on quality within the industry, focuses on the benefits and shortcomings, together with examining the concept of integrating stakeholder perspectives of project quality for improvement of outcomes throughout the project lifecycle. Findings discussed in this paper reveal a pressing need for investigation, development and testing of a framework to facilitate better implementation of quality management practices and thus achievement of better quality outcomes within the construction industry. The framework will incorporate and integrate the views of stakeholders on what constitutes final project quality to be utilised in developing better quality management planning and systems aimed ultimately at achieving better project quality delivery.
Resumo:
Infrastructure capacity management is the process of ensuring optimal provision of infrastructure assets to support business operations. Effectiveness in this process will enable infrastructure asset owners and its stakeholders to receive full value on their investment. Management research has shown that an organisation can only achieve business value when it has the right capabilities. This paradigm can also be applied to infrastructure capacity management. With competing needs for limited organisation resources, the challenge for infrastructure organisations is to identify and invest their limited resources to develop the right capabilities in the management of their infrastructure capacity. Using a multiple case study approach, the challenges faced in the management of infrastructure asset capacity and the approaches that can be adopted to overcome these challenges were explored. Conceptualising the approaches adopted by the case participants, the findings suggest that infrastructure organisations must strengthen their stakeholder connectivity capability in order to effectively manage the capacity of their infrastructure assets.
Resumo:
The focus of the present research was to investigate how Local Governments in Queensland were progressing with the adoption of delineated DM policies and supporting guidelines. The study consulted Local Government representatives and hence, the results reflect their views on these issues. Is adoption occurring? To what degree? Are policies and guidelines being effectively implemented so that the objective of a safer, more resilient community is being achieved? If not, what are the current barriers to achieving this, and can recommendations be made to overcome these barriers? These questions defined the basis on which the present study was designed and the survey tools developed. While it was recognised that LGAQ and Emergency Management Queensland (EMQ) may have differing views on some reported issues, it was beyond the scope of the present study to canvass those views. The study resolved to document and analyse these questions under the broad themes of: • Building community capacity (notably via community awareness). • Council operationalisation of DM. • Regional partnerships (in mitigation/adaptation). Data was collected via a survey tool comprising two components: • An online questionnaire survey distributed via the LGAQ Disaster Management Alliance (hereafter referred to as the “Alliance”) to DM sections of all Queensland Local Government Councils; and • a series of focus groups with selected Queensland Councils
Resumo:
This paper explains how the smoking policy at the Victorian Aboriginal Community Controlled Health Organisation (VACCHO) was developed as part of the Goreen Narrkwarren Ngrn-toura - Healthy Family Air project.
Researching employment relations : a self-reflexive analysis of a multi-method, school-based project
Resumo:
Drawing on primary data and adjunct material, this article adopts a critical self-reflexive approach to a three-year, Australian Research Council-funded projectthat explored themes around 'employment citizenship'for high school students in Queensland. The article addresses three overlapping areas that reflect some of the central dilemmas and challenges arising through the project- consent in the context of research ethics, questionnaire administration in schools, and focus group research practice. It contributes to the broader methodological literature addressing research with young people by canvassing pragmatic suggestions for future school-based research, and research addressing adolescent employment.
Resumo:
Faced with the need for strategic change, structural and cultural realignment, innovation and value-adding, many public sector organisations are tapping into a wider senior leadership talent pool and attracting successful leaders from other sectors (Flynn and Thompson, 2009). Leadership renewal has resulted, in some cases, in the external recruitment of whole senior leadership teams (Hockridge, 2008), raising issues about the influence of context on leader success (Pawar and Eastman, 1997) and potential leader transition failure, a costly outcome for leaders and organisations (Howard, 2001). There is little research on inter-sector leader transitions, which is surprising given the significant costs associated with leader acquisition and failure(Conger, 2010; Day and Halpin, 2004). For example, it is not clear what organizations do (or do not do) to ensure the outcomes of their significant investment in inter sector transitions are realised. In addition, it is not clear how the individual leader manages the challenging transition into a new leadership context and how their approach to leadership facilitates or inhibits successful transition (Avolio, 2010). Leader assimilation programs have been developed to assimilate new leaders (Manderscheid, 2008); however, assimilation is not necessarily a desired organisational outcome (Denis and Pineault, 2000). In this paper we critically review the limited literature on inter-sector leader transitions and transformational change outcomes and argue for a mutual accommodation approach. We draw on our own initial empirical work to propose the elements of a program for achieving this outcome from the perspective of the public organisation and the inter-sector appointee.
Resumo:
Hillsides in urban areas around the world are being developed at an accelerating rate, to accommodate population growth and rapid urbanization. Developments at hillside are attractive places to live because of the views, fresh air, exclusivity and the sense of being close to nature. Despite its attractiveness, hillside developments are prone to natural hazards such as landslides that can have environmental, social and economic consequences. To minimise these risks, it is necessary to consider the concerns of all stakeholders during the project review stage. This paper proposes that project governance concept can be used for this purpose by defining the rights, responsibilities and interests of the key stakeholders. It can also provide a framework within which decisions are made in order to minimise risks associated with natural hazards.
Resumo:
The literature abounds with descriptions of failures in high-profile projects and a range of initiatives has been generated to enhance project management practice (e.g., Morris, 2006). Estimating from our own research, there are scores of other project failures that are unrecorded. Many of these failures can be explained using existing project management theory; poor risk management, inaccurate estimating, cultures of optimism dominating decision making, stakeholder mismanagement, inadequate timeframes, and so on. Nevertheless, in spite of extensive discussion and analysis of failures and attention to the presumed causes of failure, projects continue to fail in unexpected ways. In the 1990s, three U.S. state departments of motor vehicles (DMV) cancelled major projects due to time and cost overruns and inability to meet project goals (IT-Cortex, 2010). The California DMV failed to revitalize their drivers’ license and registration application process after spending $45 million. The Oregon DMV cancelled their five year, $50 million project to automate their manual, paper-based operation after three years when the estimates grew to $123 million; its duration stretched to eight years or more and the prototype was a complete failure. In 1997, the Washington state DMV cancelled their license application mitigation project because it would have been too big and obsolete by the time it was estimated to be finished. There are countless similar examples of projects that have been abandoned or that have not delivered the requirements.
Resumo:
Georgia’s ‘National Integrity Systems’ are the institutions, laws, procedures, practices and attitudes that encourage and support integrity in the exercise of power in modern Georgian society. Integrity systems function to ensure that power is exercised in a manner that is true to the values, purposes and duties for which that power is entrusted to, or held by, institutions and individual office-holders. This report presents the results of the Open Society Institute / Open Society – Georgia Foundation funded project Georgian National Integrity Systems Assessment (GNISA), conducted in 2005–2006 by Caucasus Institute for Peace, Democracy and Development, Transparency International Georgia, Georgian Young Lawyers Association, in close cooperation with Griffith University Institute for Ethics, Governance and Law (Australia), and Tiri Group (UK), into how different elements of integrity systems interact, which combinations of institutions and reforms make for a strong integrity system, and how Georgia’s integrity systems should evolve to ensure coherence, not chaos in the way public integrity is maintained. Nevertheless all participants of the research may not share some conclusions given in the GNISA report.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.