859 resultados para Project Pre-Schooner.
Resumo:
The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP ----- ----- Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trial. ----- ----- Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. ----- ----- This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.
Resumo:
Project alliancing is a new alternative to traditional project delivery systems, especially in the commercial building sector. The Collaborative Process is a theoretical model of people and systems characteristics that are required to reduce the adversarial nature of most construction projects. Although developed separately, both are responses to the same pressures. Project alliancing was just used successfully to complete the National Museum of Australia. This project was analyzed as a case study to determine the extent to which it could be classified as a “collaborative project”. Five key elements of The Collaborative Process were reviewed and numerous examples from the management of this project were cited that support the theoretical recommendations of this model. In the case of this project, significant added value was delivered to the client and many innovations resulted from the collective work of the parties to the contract. It was concluded that project alliances for commercial buildings offer many advantages over traditional project delivery systems, which are related to increasing the levels of collaboration among a project management team.
Resumo:
Traditional business approaches do not take account of the rapid technological developments underpinning today's world. Further understanding the role of technology and its efficient management to build and maintain a competitive edge in business can allow project managers to more successfully manage organisations, and to adapt to and capitalise on, today’s rapidly changing environment. Strategic Technology Management links engineering, science and management principles to identify, choose, and implement the most effective means of attaining compatibility between internal skills and resources of an organisation and its competitive, economic and social environment. This paper reviews the rationale and the development of a new Strategic Technology Management subject in QUT’s Master of Project Management program. It discusses recent developments in the area of technology management from an international perspective, provides details of the curriculum developed and discusses the experience of completing two years of teaching the new program.
Resumo:
This paper outlines how the project agreement operating on the Australian National Museum project in Canberra, Australia facilitated a responsible and responsive workplace environment for construction workers. A project alliancing approach was adopted and designed to encourage industrial relations innovation in the workplace. The trigger for this approach was the perceived success of the alliancing working arrangements between key project delivery teams and a desire to extend this arrangement to subcontractors, suppliers and the workforce. Changes in the Australian workplace relations environment and introduction of a national code of practice for the Australian construction industry provided impetus for reaching a new type of workplace agreement. The workplace culture and characteristics of relationships formed between workers and management on that site shaped the agreed terms and conditions of work. It also spurred the pursuit of innovative approaches to project delivery from a technology, management and workplace culture perspective.
Resumo:
Significant differences between project partnering and project alliancing occur in the selection process, management structure of the organisations undertaking the project and nature of risk and reward incentives. This paper helps clarify the nature of project alliancing and how alliance member organisations were selected for this case study. A core issue that differentiates between the two approaches is that in partnering, partners may reap rewards at the expense of other partners. In alliancing each alliance member places their profit margin and reward structure ÁÁat riskÂÂ. Thus in alliancing, the entire alliance entity either benefits together or not all. This fundamentally changes the motivation and dynamics of the relationship between alliance members.
Resumo:
Objectives: The periosteum plays an indispensable role in both bone formation and bone defect healing. The aim of this project is to produce tissue engineered periosteum for bone defect treatment. Methods: In this study we constructed an artificial in vitro periosteum by incorporating osteogenic differentiated bone marrow stromal cells (BMSCs) and cobalt chloride (CoCl2)-treated BMSCs. The engineered periostea were implanted both subcutaneously and into skull bone defects in SCID mice to investigate ectopic and orthotopic osteogenesis and vascularisation. After two weeks in subcutaneous and four weeks in bone defect areas, the implanted constructs were assessed for ectopic and orthotopic osteogenesis and vascularisation by micro-CT, histomorphometrical and immunohistochemical methods. Results: The results showed that CoCl2 pre-treated BMSCs induced higher degree of vascularisation and enhanced osteogenesis within the implants in both ectopic and orthotopic areas. Conclusion: This study provided a novel approach using BMSCs sourced from the same patient for both osteogenic and pro-angiogenic purposes in constructing tissue engineered periosteum to enhance vascularized osteogenesis.
Resumo:
Much of the effort of the construction industry is directed towards the provision of services and products, many with substantial long term implications. Systems and procedures have evolved over centuries to provide these services and products, but inefficiencies have developed. One strategy for improving the efficiency of the construction industry is to restructure the systems and procedures which deliver projects so that improved benefits to the end users are provided. In this paper, contemporary systems and procedures for the delivery of projects are reviewed and the roles of the major stakeholders are examined. The recent construction of Woodford Correctional Centre in Queensland is reviewed as a case study in restructuring the delivery process and the lessons learned from this successful project are summarised.
Resumo:
The Blair Witch Project was a low budget movie made by student filmmakers that become an international box office hit in 1999. Blair Witch was a landmark in movie marketing and distribution because it was the first time that any movie had successfully leveraged the Internet as a marketing platform to reach a wide audience. The marketing team employed a range of innovative strategies and tactics to stimulate audience demand. This case study describes and analyses the success of the marketing launch of The Blair Witch Project.It also provides an Instructors booklet comprising seven questions and answers related to the marketing success of the movie.
Resumo:
This brief consumer marketing case study was published in a consumer marketing text book.
Resumo:
Fourteen sase studies extracted from the final project report - December 2009 Australian Flexible Learning Framework: E-portfolios Community of Practice (Aus) Personal learning plans and ePortfolio (Aus) RMIT University: Introducing ePortfolios (Aus) ePortfolio Practice: ALTC Exchange (Aus) Australian PebblePad User Group (APpUG) (Aus) ePortfolios in the library and information services sector (Aus) PDP and ePortfolios UK (UK) SURF NL Portfolio (Netherlands) University of Canterbury ePortfolio (NZ) AAEEBL: Association for Authentic, Experiential and Evidence-Based Learning (USA) Midlands Eportfolio Group, West Midlands(UK) EPAC: Electronic Portfolio Action and Communication (USA) Scottish Higher Education PDP Forum (UK) Centre for Recording Achievement (CRA)(UK)
Resumo:
It is widely acknowledged that entrepreneurship is one of the most important forces shaping changes in the economic landscape (van Praag and Versloot 2007). An understanding of the process by which new economic activity and business entities emerge is therefore vital. The Comprehensive Australian Study of Entrepreneurial Emergence (CAUSEE) is a research project that aims to uncover the factors that initiate, hinder, or facilitate the process of emergence, survival, and success of new independent businesses.
Resumo:
About 1.6 million students currently study outside their home country. Despite this, and the fact that Australia, the United States, the United Kingdom and many of the other host countries of international students are themselves extremely culturally diverse communities, business education remains essentially mono-cultural in form and Anglo American in content. Whilst it is true that these international students may want to understand the "Western" way of doing things, they may not be familiar or comfortable with the processes used to facilitate learning. This paper explores a project undertaken to create a tool that provides essential pre-orientation information and advice to students before they leave home. Where cultural adjustment is required, catching students before departure is a very effective time to introduce key information about lifestyle, culture and approaches to teaching and learning that would assist students with the complex and difficult adjustment to studying abroad, so that they could make a smoother transition to their new place of learning. Welcome to Studying Business at QUT is a Data DVD with 19 short videos capturing a student perspective on life and study. Forty percent of the content is related to living and studying and includes sections on accommodation, lifestyle, food and transport etc., and 60% takes an in-depth look at studying business, featuring students and academics talking about issues such as assessment, academic writing and working in groups. This paper outlines the process of developing the DVD and the range of issues addressed.
Resumo:
This article reports on a project to embed information literacy skills development in a first-year undergraduate business course at an Australian university. In accordance with prior research suggesting that first-year students are over-confident about their skills, the project used an optional online quiz to allow students to pre-test their information literacy skills. The students' lower than expected results subsequently encouraged greater skill development. However, not all students elected to undertake the first quiz. A final assessable information literacy quiz increased the levels of student engagement, suggesting that skill development activities need to be made assessable. We found that undertaking the information literacy quizzes resulted in a statistically significant improvement in students' information literacy skills from the pre-test to the post-test. This research therefore extends previous research by providing an effective means of delivering information literacy skill development to large cohorts of first-year students.
Resumo:
Effective use of information and communication technologies (ICT) is necessary for delivering efficiency and improved project delivery in the construction industry. Convincing clients or contracting organisations to embrace ICT is a difficult task, there are few templates of an ICT business model for the industry to use. ICT application in the construction industry is relatively low compared to automotive and aerospace industries. The National Museum of Australia project provides a unique opportunity for investigating and reporting on this deficiency in publicly available knowledge. Concentrates on the business model content and objectives, briefly indicates the evaluation framework that was used to evaluate ICT effectiveness.
Resumo:
This paper provides an overview of the A$11 billion English Channel Tunnel Project. The author's experiences are based on his recent work experience with a British Consulting Engineer involved with this unique project. After providing an historical background, the project is considered in terms of the project structure and funding, the cross Channel transport market and the planned integrated transport system in terms of both design and construction.