229 resultados para time dependant cost function


Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVE To report the cost-effectiveness of a tailored handheld computerized procedural preparation and distraction intervention (Ditto) used during pediatric burn wound care in comparison to standard practice. METHODS An economic evaluation was performed alongside a randomized controlled trial of 75 children aged 4 to 13 years who presented with a burn to the Royal Children's Hospital, Brisbane, Australia. Participants were randomized to either the Ditto intervention (n = 35) or standard practice (n = 40) to measure the effect of the intervention on days taken for burns to re-epithelialize. Direct medical, direct nonmedical, and indirect cost data during burn re-epithelialization were extracted from the randomized controlled trial data and combined with scar management cost data obtained retrospectively from medical charts. Nonparametric bootstrapping was used to estimate statistical uncertainty in cost and effect differences and cost-effectiveness ratios. RESULTS On average, the Ditto intervention reduced the time to re-epithelialize by 3 days at AU$194 less cost for each patient compared with standard practice. The incremental cost-effectiveness plane showed that 78% of the simulated results were within the more effective and less costly quadrant and 22% were in the more effective and more costly quadrant, suggesting a 78% probability that the Ditto intervention dominates standard practice (i.e., cost-saving). At a willingness-to-pay threshold of AU$120, there is a 95% probability that the Ditto intervention is cost-effective (or cost-saving) against standard care. CONCLUSIONS This economic evaluation showed the Ditto intervention to be highly cost-effective against standard practice at a minimal cost for the significant benefits gained, supporting the implementation of the Ditto intervention during burn wound care.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper examines key issues emerging from the July 2014 Where We Are Heading sessions conducted between The National Film and Sound Archive (NFSA) CEO Michael Loebenstein, industry stakeholders and members of the public seeking to engage with the future direction of the NFSA. Analysis of transcripts from these public meetings reveal significant conceptual and programmatic gaps exist between what the NFSA has done in the past, how it “self-actualises” in terms of a national collection and what it can practically and effectively achieve in the near future. These significant challenges to the historical function of the Archive occur at a time of pronounced economic austerity for public cultural institutions and expanding, digitally driven curatorial responsibilities. Tensions exist between the need for the NFSA to increase revenue while preserving the function of an open and accessible Archive. Three key areas of challenge are addressed - digitisation, funding and the need for the NFSA to connect more broadly and more deeply with Australian society. The latter area is identified as crucial as the NFSA continues to articulate and actively promote the public value of the Archive through renewed program and outreach efforts.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Virtual Machine (VM) management is an obvious need in today's data centers for various management activities and is accomplished in two phases— finding an optimal VM placement plan and implementing that placement through live VM migrations. These phases result in two research problems— VM placement problem (VMPP) and VM migration scheduling problem (VMMSP). This research proposes and develops several evolutionary algorithms and heuristic algorithms to address the VMPP and VMMSP. Experimental results show the effectiveness and scalability of the proposed algorithms. Finally, a VM management framework has been proposed and developed to automate the VM management activity in cost-efficient way.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Cane railway systems provide empty bins for harvesters to fill and full bins of cane for the factory to process. These operations need to be conducted in a timely fashion to minimise delays to harvesters and the factory and to minimise the cut-to-crush delay, while also minimising the cost of providing this service. A range of tools has been provided over the years to assist in this process. This paper reviews the objectives of the cane transport system and the tools available to achieve those objectives. The facilities within these tools to assist in the control of costs are highlighted.