Scheduling tools to reduce the cost of cane railway transport
Data(s) |
01/04/2016
|
---|---|
Resumo |
Cane railway systems provide empty bins for harvesters to fill and full bins of cane for the factory to process. These operations need to be conducted in a timely fashion to minimise delays to harvesters and the factory and to minimise the cut-to-crush delay, while also minimising the cost of providing this service. A range of tools has been provided over the years to assist in this process. This paper reviews the objectives of the cane transport system and the tools available to achieve those objectives. The facilities within these tools to assist in the control of costs are highlighted. |
Formato |
application/pdf |
Identificador | |
Publicador |
Australian Society of Sugar Cane Technologists Ltd |
Relação |
http://eprints.qut.edu.au/95470/3/95470.pdf http://www.assct.com.au Kent, Geoffrey Alan & Pinkney, Arthur John (2016) Scheduling tools to reduce the cost of cane railway transport. In Proceedings of the 38th conference of the Australian Society of Sugar Cane Technologists, Australian Society of Sugar Cane Technologists Ltd, Mackay, Qld, pp. 306-314. |
Direitos |
Copyright 2016 Australian Society of Sugar Cane Technologists Ltd No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage and retrieval system, without permission of the publisher. |
Fonte |
School of Chemistry, Physics & Mechanical Engineering; Centre for Tropical Crops and Biocommodities; Institute for Future Environments; Science & Engineering Faculty |
Palavras-Chave | #Cane transport #Schedule #Cost #Real-time #Rail |
Tipo |
Conference Paper |