619 resultados para Civil engineering|Mechanical engineering


Relevância:

90.00% 90.00%

Publicador:

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Nonlinearity, uncertainty and subjectivity are the three predominant characteristics of contractors prequalification which cause the process more of an art than a scientific evaluation. A fuzzy neural network (FNN) model, amalgamating both the fuzzy set and neural network theories, has been developed aiming to improve the objectiveness of contractor prequalification. Through the FNN theory, the fuzzy rules as used by the prequalifiers can be identified and the corresponding membership functions can be transformed. Eighty-five cases with detailed decision criteria and rules for prequalifying Hong Kong civil engineering contractors were collected. These cases were used for training (calibrating) and testing the FNN model. The performance of the FNN model was compared with the original results produced by the prequalifiers and those generated by the general feedforward neural network (GFNN, i.e. a crisp neural network) approach. Contractor’s ranking orders, the model efficiency (R2) and the mean absolute percentage error (MAPE) were examined during the testing phase. These results indicate the applicability of the neural network approach for contractor prequalification and the benefits of the FNN model over the GFNN model. The FNN is a practical approach for modelling contractor prequalification.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The selection criteria for contractor pre-qualification are characterized by the co-existence of both quantitative and qualitative data. The qualitative data is non-linear, uncertain and imprecise. An ideal decision support system for contractor pre-qualification should have the ability of handling both quantitative and qualitative data, and of mapping the complicated nonlinear relationship of the selection criteria, such that rational and consistent decisions can be made. In this research paper, an artificial neural network model was developed to assist public clients identifying suitable contractors for tendering. The pre-qualification criteria (variables) were identified for the model. One hundred and twelve real pre-qualification cases were collected from civil engineering projects in Hong Kong, and eighty-eight hypothetical pre-qualification cases were also generated according to the “If-then” rules used by professionals in the pre-qualification process. The results of the analysis totally comply with current practice (public developers in Hong Kong). Each pre-qualification case consisted of input ratings for candidate contractors’ attributes and their corresponding pre-qualification decisions. The training of the neural network model was accomplished by using the developed program, in which a conjugate gradient descent algorithm was incorporated for improving the learning performance of the network. Cross-validation was applied to estimate the generalization errors based on the “re-sampling” of training pairs. The case studies show that the artificial neural network model is suitable for mapping the complicated nonlinear relationship between contractors’ attributes and their corresponding pre-qualification (disqualification) decisions. The artificial neural network model can be concluded as an ideal alternative for performing the contractor pre-qualification task.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Multi-storey buildings are highly vulnerable to terrorist bombing attacks in various parts of the world. Large numbers of casualties and extensive property damage result not only from blast overpressure, but also from the failing of structural components. Understanding the blast response and damage consequences of reinforced concrete (RC) building frames is therefore important when assessing multi-storey buildings designed to resist normal gravity loads. However, limited research has been conducted to identify the blast response and damage of RC frames in order to assess the vulnerability of entire buildings. This paper discusses the blast response and evaluation of damage of three-dimension (3D) RC rigid frame under potential blast loads scenarios. The explicit finite element modelling and analysis under time history blast pressure loads were carried out by LS DYNA code. Complete 3D RC frame was developed with relevant reinforcement details and material models with strain rate effect. Idealised triangular blast pressures calculated from standard manuals are applied on the front face of the model in the present investigation. The analysis results show the blast response, as displacements and material yielding of the structural elements in the RC frame. The level of damage is evaluated and classified according to the selected load case scenarios. Residual load carrying capacities are evaluated and level of damage was presented by the defined damage indices. This information is necessary to determine the vulnerability of existing multi-storey buildings with RC frames and to identify the level of damage under typical external explosion environments. It also provides basic guidance to the design of new buildings to resist blast loads.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper reports on the development of specifications for an on-board mass monitoring (OBM) application for regulatory requirements in Australia. An earlier paper reported on feasibility study and pilot testing program prior to the specification development [1]. Learnings from the pilot were used to refine this testing process and a full scale testing program was conducted from July to October 2008. The results from the full scale test and evidentiary implications are presented in this report. The draft specification for an evidentiary on-board mass monitoring application is currently under development.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The new cold-formed LiteSteel beam (LSB) sections have found increasing popularity in residential, industrial and commercial buildings due to their lightweight and cost-effectiveness. They have the beneficial characteristics of including torsionally rigid rectangular flanges combined with economical fabrication processes. Currently there is significant interest in using LSB sections as flexural members in floor joist systems. When used as floor joists, the LSB sections require holes in the web to provide access for inspection and various services. But there are no design methods that provide accurate predictions of the moment capacities of LSBs with web holes. In this study, the buckling and ultimate strength behaviour of LSB flexural members with web holes was investigated in detail by using a detailed parametric study based on finite element analyses with an aim to develop appropriate design rules and recommendations for the safe design of LSB floor joists. Moment capacity curves were obtained using finite element analyses including all the significant behavioural effects affecting their ultimate member capacity. The parametric study produced the required moment capacity curves of LSB section with a range of web hole combinations and spans. A suitable design method for predicting the ultimate moment capacity of LSB with web holes was finally developed. This paper presents the details of this investigation and the results

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper presents the details of experimental and numerical studies on the shear behaviour of a recently developed, cold-formed steel beam known as LiteSteel Beam (LSB). The LSB sections are produced by a patented manufacturing process involving simultaneous cold-forming and electric resistance welding. It has a unique shape of a channel beam with two rectangular hollow flanges. Recent research has demonstrated the presence of increased shear capacity of LSBs due to the additional fixity along the web to flange juncture, but the current design rules ignore this effect. Therefore they were modified by including a higher elastic shear buckling coefficient. In the present study, the ultimate shear capacity results obtained from the experimental and numerical studies of 10 different LSB sections were compared with the modified shear capacity design rules. It was found that they are still conservative as they ignore the presence of post-buckling strength. Therefore the design rules were further modified to include the available post-buckling strength. Suitable design rules were also developed under the direct strength method format. This paper presents the details of this study and the results including the final design rules for the shear capacity of LSBs.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Road and highway infrastructure provides the backbone for a nation's economic growth. The versatile dispersion of population in Australia, from sparsely settled communities in remote areas to regenerated inner city suburbs with high density living in metropolitans, calls for continuing development and improvement on roads infrastructure under the current federal government policies and state governments' strategic plans. As road infrastructure projects involve large resources and mechanism, achieving sustainability not only in economic scales but also through environmental and social responsibility becomes a crucial issue. Current efforts are often impeded by different interpretation on sustainability agenda by stakeholders involved in these types of projects. As a result, sustainability deliverables at the project level is not often as transparent and measurable, compared to promises in project briefs and designs. This paper reviews the past studies on sustainable infrastructure construction, focusing on roads and highway projects. Through literature study and consultation with the industry, key sustainability indicators specific to road infrastructure projects have been identified. Based on these findings, this paper introduces an on-going research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, and issues that impact on the gap between sustainability foci and its actual realization at project end level. The exploration helps generate an integrated decision-making model for sustainable road infrastructure projects. The research will promote to the industry more systematic and integrated approaches to decision-making on the implementation of sustainability strategies to achieve deliverable goals throughout the development and delivery process of road infrastructure projects in Australia.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper has two main sections, the first of which presents a summarized review of the literature concerning previous studies on the implementation of ISO 9000 quality management systems (QMSs) both in global construction companies as well as in Indonesian construction firms, and the perceived correlation between organisational culture and QMS practices in the construction sector. The first section of the paper contributes to the development of the second section, which presents details of the research project being undertaken. Based on the fundamental questions that led to the development of the main research objectives, suitable research methods have been developed in order to meet these objectives. Primary data will be collected by use of a mixed methods approach, i.e., questionnaire surveys and focus group discussions/interviews in order to obtain opinions from respondents drawn from targeted ISO construction firms. Most of the data expected to be obtained will be in future be analyzed using statistical software then the findings will be discussed in order to ultimately develop a culture-based QMS framework.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The importance of sustainable development has been internationally recognized and the principles have been widely used as an impetus for promoting housing sustainability. In the situation of mixed-use urban development in close proximity to heavy industrial areas in Malaysia, rising incomes are developing hand in hand with higher expectations for better and more sustainable housing designs. Negative environmental impacts due current deficiency in Malaysia’s approach to the implementation of sustainable development principles can be seen in this case study of the Pasir Gudang Industrial Area in Malaysia. This study aimed to highlight the level of residents’ satisfaction with living near the industrial area, and to relate their awareness of the relevance of sustainable principles with indoor environmental conditions, which found that the residents’ has limited understanding of the environmental problems in their indoor living conditions and in their neighborhoods. This study has suggested that proactive and integrated involvement by housing authorities from all levels of government in Malaysia should be encouraged in order to rationalise the approaches to develop better planning solutions for such mixed-used urban developments. This initiative should then encourage housing vendors to provide innovative ‘smart’ technological changes to their projects and so, to achieve a new direction in sustainable housing development.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The purpose of this paper is to emphasis the significance of public asset management in Indonesia that is by identifying opportunities and challenges of Indonesian local governments in adopting current practice of Public Asset Management System. A Case Study, in South Sulawesi Provincial government was used as the approach to achieve the research objective. The case study involved two data collection techniques i.e. interviews followed by study on documents. The result of the study indicates there are some significant opportunities and challenges that Indonesian local government might deal with in adopting current practice of public asset management. There are opportunities that can lead to more effective and efficient local government, accountable and auditable local government organization, increase local government portfolio, and improve the quality of public services. The challenges include no clear institutional and legal framework to support the asset management application, non-profit principle of public assets, cross jurisdictions in public asset management, complexity of local government objectives, and unavailability of data for managing public property. The study only covers condition of South Sulawesi Province, which could not represent exactly the whole local governments’ condition in Indonesia. Findings from this study provide useful input for the policy makers, scholars and asset management practitioners in Indonesia to establish a public asset management framework that suitable for Indonesia.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Asset management in local government is an emerging discipline and over a decade has become a crucial aspect towards a more efficient and effective organisation. One crucial feature in the public asset management is performance measurement toward the public real estates. This measurement critically at the important component of public wealth and seeks to apply a standard of economic efficiency and effective organisational management especially in such global financial crisis condition. This paper aims to identify global economic crisis effect and proposes alternative solution for local governments to softening the impact of the crisis to the local governments organisation. This study found that the most suitable solution for local government to solve the global economic crisis in Indonesia is application of performance measurement in its asset management. Thus, it is important to develop performance measurement system in local government asset management process. This study provides suggestions from published documents and literatures. The paper also discusses the elements of public real estate performance measurement. The measurement of performance has become an essential component of the strategic thinking of assets owners and managers. Without having a formal measurement system for performance, it is difficult to plan, control and improve local government real estate management system. A close look at best practices in public sectors reveals that in most cases these practices were transferred from private sector reals estate management under the direction of real estate experts retained by government. One of the most significant advances in government property performance measurement resulted from recognition that the methodology used by private sector, non real estate corporations for managing their real property offered a valuable prototype for local governments. In general, there are two approaches most frequently used to measure performance of public organisations. Those are subjective and objective measures. Finally, findings from this study provides useful input for the local government policy makers, scholars and asset management practitioners to establish a public real estate performance measurement system toward more efficient and effective local governments in managing their assets as well as increasing public services quality in order to soften the impact of global financial crisis.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The stimulus for this project rose from the need to find an alternative solution to aging superstructures of road-bridge in low volume roads (LVR). The solution investigated, designed and consequently plans to construct, involved replacing an aging super-structure of a 10m span bridge with Flat-Bed Rail Wagon (FBRW). The main focus of this paper is to present alternate structural system for the design of the FBRW as road bridge deck conforming to AS5100. The structural adequacy of the primary members of the FBRW was first validated using full scale experimental investigation to AS5100 serviceability and ultimate limit state loading. The bare FBRW was further developed to include a running surface. Two options were evaluated during the design phase, namely timber and reinforced concrete. First option, which is presented here, involved strengthening of the FBRW using numerous steel sections and overlaying the bridge deck with timber planks. The idea of this approach was to use all the primary and secondary members of the FBRW in load sharing and to provide additional members where weaknesses in the original members arose. The second option, which was the preferred option for construction, involved use of primary members only with an overlaying reinforced concrete slab deck. This option minimised the risk associated with any uncertainty of secondary members to its structural adequacy. The paper will report selected results of the experiment as well as the design phases of option one with conclusions highlighting the viability of option 1 and its limitations.