276 resultados para Buried infrastructure
Resumo:
Response to discussion on Gallage CPK, Chan D and Kodilara J (2012) Response of a plastic pipe buried in expansive clay. Proceedings of ICE, Geotechnical Engineering, Vol 164, February 2012, Issue GE1, pages 45-57.
Resumo:
Fluid Infrastructure: Landscape Architecture Exhibition: This exhibition showcases the work of 4th Year undergraduate landscape architecture students in response to the 2011 Queensland floods through five installations: Systima Fluid Flux Flex Fluid Connectivity The Floods Verge Fluid Evolution The focus of these installations is the post-flood conditions of Brisbane’s riverside public infrastructure, within a scenario of flood as a normalised event. It recognises that within this scenario, parts of this city cannot be described as definitively ‘land’ or ‘water,’ but are best described as ‘fluid terrains’(Mathur, A. and Da Cunha, D. 2006). The landscape design propositions within the five installations include public transport diversification (RiverRats) schemes, greenspace elevations, ephemeral gardens and evolving landscapes, creative interpretation and warning devices and systems. These propositions do not resist fluid conditions, but work with them to propose a more resilient urban river landscape than Brisbane currently has. This QUT exhibition was developed as part of the 2011 Flood of Ideas Project (http://www.floodofideas.org.au) in partnership with Healthy Waterways (Water by Design), State Library of Queensland (The Edge), Brisbane City Council, Australian Institute of Architects, University of Queensland, Green Cross Australia, Stormwater Industry Association.
Resumo:
This paper presents an Image Based Visual Servo control design for Fixed Wing Unmanned Aerial Vehicles tracking locally linear infrastructure in the presence of wind using a body fixed imaging sensor. Visual servoing offers improved data collection by posing the tracking task as one of controlling a feature as viewed by the inspection sensor, although is complicated by the introduction of wind as aircraft heading and course angle no longer align. In this work it is shown that the effects of wind alter the desired line angle required for continuous tracking to equal the wind correction angle as would be calculated to set a desired course. A control solution is then sort by linearizing the interaction matrix about the new feature pose such that kinematics of the feature can be augmented with the lateral dynamics of the aircraft, from which a state feedback control design is developed. Simulation results are presented comparing no compensation, integral control and the proposed controller using the wind correction angle, followed by an assessment of response to atmospheric disturbances in the form of turbulence and wind gusts
Resumo:
The Australian Government and most Australian road authorities have set ambitious greenhouse gas emission (GHGe) reduction targets for the near future, many of which have translated into action plans. However, previous research has shown that the various Australian state road authorities are at different stages of implementing ‘green’ initiatives in construction planning and development, with considerable gaps in their monitoring, tendering, and contracting. This study illustrates the differences between procurement standards and project specific practices that aim to reduce GHGe from road construction projects in three of the largest Australian road construction clients, with a focus on the tools used, contract type and incentives for better performance.
Resumo:
Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and delivering Value for Money (VfM). As part of the background to this challenge, a critique is given of current practice in the selection of the approach to procure major public sector infrastructure in Australia and which is akin to the Multi-Attribute Utility Approach (MAUA). To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision-making model is presented. The model addresses the make-or-buy decision (risk allocation); the bundling decision (property rights incentives), as well as the exchange relationship decision (relational to arms-length exchange) in its novel approach to articulating a procurement strategy designed to yield superior VfM across the whole life of the asset. The aim of this paper is report on the development of this decisionmaking model in terms of the procedural tasks to be followed and the method being used to test the model. The planned approach to testing the model uses a sample of 87 Australian major infrastructure projects in the sum of AUD32 billion and deploys a key proxy for VfM comprising expressions of interest, as an indicator of competition.
Resumo:
This document provides data for the case study presented in our recent earthwork planning papers. Some results are also provided in a graphical format using Excel.
Resumo:
As highlighted by previous work in Normal Accident Theory1 and High Reliability Organisations, 2 the ability of a system to be flexible is of critical importance to its capability to prepare for, respond to, and recover from disturbance and disasters. This paper proposes that the research into ‘edge organisations’3 and ‘agility’4 is a potential means to operationalise components that embed high reliable traits in the management and oversight of critical infrastructure systems. Much prior work has focused on these concepts in a military frame whereas the study reported on here examines the application of these concepts to aviation infrastructure, specifically, a commercial international airport. As a commercial entity functions in a distinct manner from a military organisation this study aims to better understand the complementary and contradictory components of the application of agility work to a commercial context. Findings highlight the challenges of making commercial operators of infrastructure systems agile as well as embedding traits of High Reliability in such complex infrastructure settings.
Resumo:
The natural disasters incident that frequently hit Indonesia are floods, severe droughts, tsunamis, earth-quakes, volcano, eruptions, landslides, windstorm and forest fires. The impact of those natural disasters are significantly severe and affecting the quality of life of the community due to the breakdown of the public as-sets as one source to deliver public services. This paper is aimed to emphasis the importance of natural disaster risk-informed in relation to public asset management in Indonesian Central Government, particularly in asset planning stage where asset decision is made as the gate into the whole public asset management processes. A Case study in the Ministry of Finance Indonesia as the central government public asset manager and in 5 (five) line ministries/governmental agencies as public asset users was used as the approach to achieved the research objective. The case study devoured three data collection techniques i.e. interviews, observations and document archival which will be analysed by a content analysis approach. The result of the study indicates that Indonesian geographical position exposing many of public infra-structure assets as a high vulnerability to natural disasters. Information on natural-disaster trends and predictions to identify and measure the risks are available, however, such information are not utilise and integrated to the process of public infrastructure asset planning as the gate to the whole public asset management processes. Therefore, in order to accommodate and incorporate this natural disaster risk-information into public asset management processes, particularly in public asset planning, a public asset performance measurements framework should be adopted and applied in the process as one sources in making decision for infrastructure asset planning. Findings from this study provide useful input for the Ministry of Finance as public asset manager, scholars and private asset management practitioners in Indonesia to establish natural disaster risks awareness in public infrastructure asset management processes.
Resumo:
A range of authors from the risk management, crisis management, and crisis communications literature have proposed different models as a means of understanding components of crisis. A generic component of these sources has focused on preparedness practices before disturbance events and response practices during events. This paper provides a critical analysis of three key explanatory models of how crises escalate highlighting the strengths and limitations of each approach. The paper introduces an optimised conceptual model utilising components from the previous work under the four phases of pre-event, response, recovery, and post-event. Within these four phases, a ten step process is introduced that can enhance understanding of the progression of distinct stages of disturbance for different types of events. This crisis evolution framework is examined as a means to provide clarity and applicability to a range of infrastructure failure contexts and provide a path for further empirical investigation in this area.
Resumo:
The thesis provides a framework for potential implementation of the design-build (DB) project delivery system in road infrastructure projects in Indonesia. This framework proposed a structure of the hierarchy of factors promoting the potential implementation of the DB project delivery system and introduced ways to implement the DB project delivery system through level of hierarchical factors. These findings not only give benefit to the academic knowledge but also to the public officials in guiding them with regard to the priority of promoting factors in the process to implement the DB system.
Resumo:
As the adoption of project financing is gaining momentum, there is a concurrent need of innovation in project financing scheme in order to accelerate infrastructure assets provision in Indonesia. As the largest Muslim population in the world, sharia-compliant financing offers tremendous potential as a source for infrastructure financing for Indonesia. To realize this potential, there is a need of a framework to guide its adoption. Hence this paper discusses the potential implementation of Islamic finance to fund infrastructure projects in Indonesia. Through comparative analysis, this paper illustrates how Islamic principles can be incorporated into Indonesian infrastructure project financing.
Resumo:
Jakarta, Indonesia’s chronic housing shortage poses multiple challenges for contemporary policy-makers. While it may be in the city’s interest to increase the availability of housing, there is limited land to do so. Market pressures, in tandem with government’s desire for housing availability, demand consideration of even marginal lands, such as those within floodplains, for development. Increasingly, planning for a flood resilient Jakarta is complicated by a number of factors, including: the city is highly urbanized and land use data is limited; flood management is technically complex, creating potential barriers to engagement for both decision-makers and the public; inherent uncertainty exists throughout modelling efforts, central to management; and risk and liability for infrastructure investments is unclear. These obstacles require localized watershed-level participatory planning to address risks of flooding where possible and reduce the likelihood that informal settlements occur in areas of extreme risk. This paper presents a preliminary scoping study for determination of an effective participatory planning method to encourage more resilient development. First, the scoping study provides background relevant to the challenges faced in planning for contemporary Jakarta. Second, the study examines the current use of decision-support tools, such as Geographic Information Systems (GIS), in planning for Jakarta. Existing capacity in the use of GIS allows for consideration of the use of an emerging method of community consultation - Multi-Criteria Decision-Making (MCDM) support systems infused with geospatial information - to aid in engagement with the public and improve decision-making outcomes. While these methods have been used in Australia to promote stakeholder engagement in urban intensification, the planned research will be an early introduction of the method to Indonesia. As a consequence of this intervention, it is expected that planning activities will result in a more resilient city, capable of engaging with disaster risk management in a more effective manner.
Resumo:
The thesis develops an Organisational Culture (OC) based framework for potentially improving the current practice of the infrastructure project selection process (PSP) in Indonesia, particularly for regional road projects. This framework is developed to address the suggestion emanating from the research that there is a need for strengthening the relevant organisational culture dimensions and making changes to current organisational culture profiles to support the effectiveness of the decision-making process of the current PSP. The findings not only benefit existing knowledge but also provide practical contributions for those decision-makers within the Indonesian regional government that are involved in PSP, i.e. by raising the awareness of the influence and the role of organisational culture.
Resumo:
Highway infrastructure development typically requires major capital input. Unless planned properly, such requirements can cause serious financial constraints for investors. The push for sustainability adds a new dimension to the complexity of evaluating highway projects. Finding environmentally and socially responsible solutions for highway construction will improve its potential for acceptance by the society and in many instances the infrastructure's life span. Even so, the prediction and determination of a project's long-term financial viability can be a precarious exercise. Existing studies in this area have not indicated details of how to identify and deal with costs incurred in pursuing sustainability measures in highway infrastructure. This paper provides insights into the major challenges of implementing sustainability in highway project development in terms of financial concerns and obligations. It discusses the results from recent research through a literature study and a questionnaire survey of key industry stakeholders involved in highway infrastructure development. The research identified critical cost components relating to sustainability measures based on perspectives of industry stakeholders. All stakeholders believe sustainability related costs are an integral part of the decision making. However, the importance rating of these costs is relative to each stakeholder's core business objectives. This will influence the way these cost components are dealt with during the evaluation of highway investment alternatives and financial implications. This research encourages positive thinking among the highway infrastructure practitioners about sustainability. It calls for the construction industry to maximise sustainability deliverables while ensuring financial viability over the life cycle of highway infrastructure projects.
Resumo:
Democratic governments raise taxes and charges and spend revenue on delivering peace, order and good government. The delivery process begins with a legislature as that can provide a framework of legally enforceable rules enacted according to the government’s constitution. These rules confer rights and obligations that allow particular people to carry on particular functions at particular places and times. Metadata standards as applied to public records contain information about the functioning of government as distinct from the non-government sector of society. Metadata standards apply to database construction. Data entry, storage, maintenance, interrogation and retrieval depend on a controlled vocabulary needed to enable accurate retrieval of suitably catalogued records in a global information environment. Queensland’s socioeconomic progress now depends in part on technical efficiency in database construction to address queries about who does what, where and when; under what legally enforceable authority; and how the evidence of those facts is recorded. The Survey and Mapping Infrastructure Act 2003 (Qld) addresses technical aspects of where questions – typically the officially recognised name of a place and a description of its boundaries. The current 10-year review of the Survey and Mapping Regulation 2004 provides a valuable opportunity to consider whether the Regulation makes sense in the context of a number of later laws concerned with management of Public Sector Information (PSI) as well as policies for ICT hardware and software procurement. Removing ambiguities about how official place names are to be regarded on a whole-of-government basis can achieve some short term goals. Longer-term goals depend on a more holistic approach to information management – and current aspirations for more open government and community engagement are unlikely to occur without such a longer-term vision.