Resumo:
Identifying the design features that impact construction is essential to developing cost effective and constructible designs. The similarity of building components is a critical design feature that affects method selection, productivity, and ultimately construction cost and schedule performance. However, there is limited understanding of what constitutes similarity in the design of building components and limited computer-based support to identify this feature in a building product model. This paper contributes a feature-based framework for representing and reasoning about component similarity that builds on ontological modelling, model-based reasoning and cluster analysis techniques. It describes the ontology we developed to characterize component similarity in terms of the component attributes, the direction, and the degree of variation. It also describes the generic reasoning process we formalized to identify component similarity in a standard product model based on practitioners' varied preferences. The generic reasoning process evaluates the geometric, topological, and symbolic similarities between components, creates groupings of similar components, and quantifies the degree of similarity. We implemented this reasoning process in a prototype cost estimating application, which creates and maintains cost estimates based on a building product model. Validation studies of the prototype system provide evidence that the framework is general and enables a more accurate and efficient cost estimating process.
Resumo:
In recent years, there has been a growing interest from the design and construction community to adopt Building Information Models (BIM). BIM provides semantically-rich information models that explicitly represent both 3D geometric information (e.g., component dimensions), along with non-geometric properties (e.g., material properties). While the richness of design information offered by BIM is evident, there are still tremendous challenges in getting construction-specific information out of BIM, limiting the usability of these models for construction. In this paper, we describe our approach for extracting construction-specific design conditions from a BIM model based on user-defined queries. This approach leverages an ontology of features we are developing to formalize the design conditions that affect construction. Our current implementation analyzes the component geometry and topological relationships between components in a BIM model represented using the Industry Foundation Classes (IFC) to identify construction features. We describe the reasoning process implemented to extract these construction features, and provide a critique of the IFC’s to support the querying process. We use examples from two case studies to illustrate the construction features, the querying process, and the challenges involved in deriving construction features from an IFC model.
Resumo:
Accelerating a project can be rewarding. The consequences, however, can be troublesome if productivity and quality are sacrificed for the sake of remaining ahead of schedule, such that the actual schedule benefits are often barely worth the effort. The tradeoffs and paths of schedule pressure and its causes and effects are often overlooked when schedule decisions are being made. This paper analyses the effects that schedule pressure has on construction performance, and focuses on tradeoffs in scheduling. A research framework has been developed using a causal diagram to illustrate the cause-and-effect analysis of schedule pressure. An empirical investigation has been performed by using survey data collected from 102 construction practitioners working in 38 construction sites in Singapore. The results of this survey data analysis indicate that advantages of increasing the pace of work—by working under schedule pressure—can be offset by losses in productivity and quality. The negative effects of schedule pressure arise mainly by working out of sequence, generating work defects, cutting corners, and losing the motivation to work. The adverse effects of schedule pressure can be minimized by scheduling construction activities realistically and planning them proactively, motivating workers, and by establishing an effective project coordination and communication mechanism.
Resumo:
Previous research on construction innovation has commonly recognized the importance of the organizational climate and key individuals, often called “champions,” for the success of innovation. However, it rarely focuses on the role of participants at the project level and addresses the dynamics of construction innovation. This paper therefore presents a dynamic innovation model that has been developed using the concept of system dynamics. The model incorporates the influence of several individual and situational factors and highlights two critical elements that drive construction innovations: (1) normative pressure created by project managers through their championing behavior, and (2) instrumental motivation of team members facilitated by a supportive organizational climate. The model is qualified empirically, using the results of a survey of project managers and their project team members working for general contractors in Singapore, by assessing casual relationships for key model variables. Finally, the paper discusses the implications of the model structure for fostering construction innovations.
Resumo:
Knowledge Management (KM) is a process that focuses on knowledge-related activities to facilitate knowledge creation, capture, transformation and use, with the ultimate aim of leveraging organisations’ intellectual capital to achieve organisational objectives. The KM process receives input from its context (e.g. internal business environment), and produces output (i.e. knowledge). It is argued that the validity of such knowledge should be justified by business performance. The study, this paper reports on, provides enhanced empirical understanding of such an input-process-output relationship through investigating the interactions among different KM activities in the context of how construction organisations in Hong Kong manage knowledge. To this end, a theoretical framework along with a number of hypotheses are proposed and empirically tested through correlation, regression and path analyses. A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to facilitate testing the proposed relationships. More than 140 respondents from 99 organisations responded to the survey. The study findings demonstrate that both organisational and technical environments have the potential to predict the intensity of KM activities. Furthermore, different categories of KM activities interact with each other, and collectively they could be used to predict business performance.
Resumo:
Since the movement for economic reform started in China 20 years ago, the nation's GDP had grown on average from seven to nine per cent a year, making China's construction industry one of the largest in the world. This paper presents an overview of China's foreign economic cooperation development (FECD) in the context of exporting three major construction services namely; contracting, labour and design. The paper outlines the export market profile of Chinese contractors and discusses their current position in the international market. It then addresses challenges; they are facing in view of meeting the ambitious strategic targets set out by the Government for the FECD, which cover the export of construction services. Finally, the paper sheds some light on key exporting strategies currently adopted by Chinese contractors.
Resumo:
This paper describes an empirical study to test the proposition that all construction contract bidders are homogeneous ie. they can be treated as behaving collectively in an identical (statistical) manner. Examination of previous analyses of bidding data reveals a flaw in the method of standardising bids across different size contracts and a new procedure is proposed which involves the estimation of a contract datum. Three independent sets of bidding data were then subjected to this procedure and estimates of the necessary distributional parameters obtained. These were then tested against the bidder homogeneity assumption resulting in the conclusion that the assumption may be appropriate for a three parameter log-normal shape, but not for scale and location.
Resumo:
A theoretical framework for a construction management decision evaluation system for project selection by means of a literature review. The theory is developed by the examination of the major factors concerning the project selection decision from a deterministic viewpoint, where the decision-maker is assumed to possess 'perfect knowledge' of all the aspects involved. Four fundamental project characteristics are identified together with three meaningful outcome variables. The relationship within and between these variables are considered together with some possible solution techniques. The theory is next extended to time-related dynamic aspects of the problem leading to the implications of imperfect knowledge and a nondeterministic model. A solution technique is proposed in which Gottinger's sequential machines are utilised to model the decision process,
Resumo:
Morris' (1986) analysis of the factors affecting project success and failure is considered in relation to the psychology of judgement under uncertainty. A model is proposed whereby project managers may identify the specific circumstances in which human decision-making is prone to systematic error, and hence may apply a number of de-biasing techniques.
Resumo:
Many countries face enormous development challenges in adapting to demographic change, urbanisation and emerging issues such as housing affordability and climate change. These challenges are best resolved in consultation with communities rather than in conflict with them. A rich tradition of research and intellectual frameworks exist in the fields of urban geography and planning to understand and manage community concerns during the pre-development approval stages of new projects. However current theoretical frameworks are inadequate in construction management and a new research agenda is needed to develop conceptual frameworks to guide thinking about the role of communities in the construction process. By discussing the components of such a model, it is concluded that this would require a fundamental shift in thinking which challenges traditional structuralist paradigms. A new constructivist paradigm is presented that conceives community consultation as a negotiation process which does not stop at the pre-development planning stages but which continues over the entire life of a project.
Resumo:
Dynamic capability theory asserts that the learning capabilities of construction organisations influence the degree to which value-for-money (VfM) is achieved on collaborative projects. However, there has been little study conducted to verify this relationship. The evidence is particularly limited within the empirical context of infrastructure delivery in Australia. Primarily drawing on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991), dynamic capabilities (e.g. Helfat et al. 2007), absorptive capacity (e.g. Lane et al. 2006) and knowledge management (e.g. Nonaka 1994), this paper conceptualises learning capability as a knowledge-based dynamic capability. Learning capability builds on the micro-foundations of high-order learning routines, which are deliberately developed by construction organisations for managing collaborative projects. Based on this conceptualisation of learning capability, an exploratory case study was conducted. The study investigated the operational and higher-order learning routines adopted by a project alliance team to successfully achieve VfM. The case study demonstrated that the learning routines of the alliance project were developed and modified by the continual joint learning activities of participant organisations. Project-level learning routines were found to significantly influence the development of organisational-level learning routines. In turn, the learning outcomes generated from the alliance project appeared to significantly influence the development of project management routines and contractual arrangements applied by the participant organisations in subsequent collaborative projects. The case study findings imply that the higher-order learning routines that underpin the learning capability of construction organisations have the potential to influence the VfM achieved on both current and future collaborative projects.
Resumo:
The concept of market-driven rather than product-driven quality management has been given prominence through the report of a recent inquiry into the performance of the Hong Kong construction industry. The report submitted to the Government of Hong Kong in 2001 establishes a new vision of ‘an integrated industry that is capable of continuous improvement towards excellence in the market-driven environment’. Given the current economic downturn, major contractors are facing many challenges to realize this new quality oriented vision. This paper addresses the critical and timely issue of applying quality management to the project delivery process in Hong Kong. The paper attempts to capture and critically examine management perceptions of quality management aspects as applied to a local large-scale road construction project. Based on the analysis of questionnaire feedback and face-to-face interviews, the paper reveals key attributes of a successful application of quality management approaches, and identifies a mechanism for facilitating such implementation.
Resumo:
Better management of knowledge assets has the potential to improve business processes and increase productivity. This fact has led to considerable interest in recent years in the knowledge management (KM) phenomenon, and in the main dimensions that can impact on its application in construction. However, a lack of a systematic way of assessing KM initia-tives’ contribution towards achieving organisational business objectives is evident. This paper describes the first stage of a research project intended to develop, and empirically test, a KM input-process-output framework comprising unique and well-defined theoretical constructs representing the KM process and its internal and external determinants in the context of con-struction. The paper presents the underlying principles used in operationally defining each construct through the use of extant KM literature. The KM process itself is explicitly mod-elled via a number of clearly articulated phases that ultimately lead to knowledge utilisation and capitalisation, which in turn adds value or otherwise to meeting defined business objec-tives. The main objective of the model is to reduce the impact of subjectivity in assessing the contribution made by KM practices and initiatives toward achieving performance improvements.