808 resultados para Heritage Management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Brisbane City Hall (BCH) is arguably one of Brisbane’s most notable and iconic buildings. Serving as the public’s central civic and municipal building since 1930, the importance of this heritage listed building to cultural significance and identity is unquestionable. This attribute is reflected within the local government, with a simplified image of the halls main portico entrance supplying Brisbane City Council with its insignia and trademark signifier. Regardless of these qualities, this building has been neglected in a number of ways, primarily in the physical sense with built materials, but also, and just as importantly, through inaccurate and undocumented works. Numerous restoration and renovation works have been undertaken throughout BCH’s lifetime, however the records of these amendments are far and few between. Between 2010 and 2013, BCH underwent major restoration works, the largest production project undertaken on the building since its initial construction. Just prior to this conservation process, the full extent of the buildings deterioration was identified, much of which there was little to no original documentation of. This has led to a number of issues pertaining to what investigators expected to find within the building, versus what was uncovered (the unexpected), which have resulted directly from this lack of data. This absence of record keeping is the key factor that has contributed to the decay and unknown deficiencies that had amassed within BCH. Accordingly, this raises a debate about the methods of record keeping, and the need for a more advanced process that is able to be integrated within architectural and engineering programs, whilst still maintaining the ability to act as a standalone database. The immediate objective of this research is to investigate the restoration process of BCH, with focus on the auditorium, to evaluate possible strategies to record and manage data connected to building pathology so that a framework can be developed for a digital heritage management system. The framework produced for this digital tool will enable dynamic uses of a centralised database and aims to reduce the significant data loss. Following an in-depth analysis of this framework, it can be concluded that the implementation of the suggested digital tool would directly benefit BCH, and could ultimately be incorporated into a number of heritage related built form.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper outlines how the Ortelia project’s 3D virtual reality models have the capacity to assist our understanding of sites of cultural heritage. The VR investigation of such spaces can be a valuable tool in 'real world' empirical research in theatre and spatiality. Through a demonstration of two of Ortelia's VR models (an art gallery and a theatre), we suggest how we might consider interpreting cultural space and sites as contributing significantly to cultural capital. We also introduce the potential for human interaction in such venues through motion-capture to discuss the potential for assessing how humans interact in such contexts.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This book disseminates current information pertaining to the modulatory effects of foods and other food substances on behavior and neurological pathways and, importantly, vice versa. This ranges from the neuroendocrine control of eating to the effects of life-threatening disease on eating behavior. The importance of this contribution to the scientific literature lies in the fact that food and eating are an essential component of cultural heritage but the effects of perturbations in the food/cognitive axis can be profound. The complex interrelationship between neuropsychological processing, diet, and behavioral outcome is explored within the context of the most contemporary psychobiological research in the area. This comprehensive psychobiology- and pathology-themed text examines the broad spectrum of diet, behavioral, and neuropsychological interactions from normative function to occurrences of severe and enduring psychopathological processes

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The effects of rapid development have increased pressures on these places exacerbated by the competition between two key industry sectors, commercial base and tourism development. This, in supplement with urbanisation and industrialisation, has posted a high demand for the uses of these spaces. The political scenario and lack of adaptation on ecological principles and public participations in its design approach have sparked stiff environmental, historical and cultural constraint towards its landscape character as well as the ecological system. Therefore, a holistic approach towards improving the landscape design process is extremely necessary to protect human well being, cultural, environmental and historical values of these places. Limited research also has been carried out to overcome this situation. This further has created an urgent need to explore better ways to improve the landscape design process of Malaysian heritage urban river corridor developments that encompass the needs and aspirations of the Malaysian multi-ethnic society without making any drastic changes to the landscape character of the rivers. This paper presents a methodology to develop an advanced Landscape Character Assessment (aLCA) framework for evaluating the landscape character of the places, derived from the perception of two keys yet oppositional stakeholders: urban design team and special interest public. The triangulation of subjectivist paradigm methodologies: the psychophysical approach; the psychological approach; and, the phenomenological approach will be employed. The outcome will be used to improve the present landscape design process for future development of these places. Unless a range of perspectives can be brought to bear on enhancing the form and function of their future development and management, urban river corridors in the Malaysian context will continue to decline.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper outlines how the Ortelia project’s 3D virtual reality models have the capacity to assist our understanding of sites of cultural heritage. The VR investigation of such spaces can be a valuable tool in 'real world' empirical research in theatre and spatiality. Through a demonstration of two of Ortelia's VR models (an art gallery and a theatre), we suggest how we might consider interpreting cultural space and sites as contributing significantly to cultural capital. We also introduce the potential for human interaction in such venues through motion-capture to discuss the potential for assessing how humans interact in such contexts.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Art and Cultural Heritage: Law, Policy and Practice Barbara Hoffman as editor brings together an impressive array of practitioners from a variety of fields (from archaeologists to lawyers), to present in single volume aspects of policy, law and practice relevant to cultural heritage, which are not normally addressed in such texts. The book is indeed a comprehensive work to be recommended to policy makers, practitioners, students and other interested readers...

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Old Government House, a former residence of the Queen’s representatives in Brisbane, Australia, symbolises British cultural heritage of Colonial Queensland. Located on the campus of the Queensland University of Technology, it is one of the oldest surviving examples of a stately residence in Queensland. Built in 1860s, the Old Government House was originally intended as a temporary residence for the first governor of the newly independent colony of Queensland. However, it remained the vice-regal residence until 1909, serving eleven succeeding governors. Nearly seven decades later, it became the first building in Queensland to be protected under heritage legislation. Thus its importance, as an excellent exemplar that demonstrates the significance of cultural heritage, was established. The Old Government House has survived 150 years of restoration work, refurbishments, and additions. Through these years, it has served the people of Queensland in a multitude of roles. This paper aims to investigate the survival of heritage listed buildings through their adaptive re-use. Its focus will be on the adaptive reuse of the Old Government House through its refurbishments and additions over a period of 150 years. Through a qualitative research process this paper will endeavour to establish the significance of restoration work on the Old Government house; the new opportunities that has opened up as a result of the restoration work; the continued maintenance and management of the building through adaptive re-use; the economic benefits of restoration work; and its contribution to the on-going interest in the preservation of the Tangible Cultural Heritage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The feral pig, Sus scrofa, is a widespread and abundant invasive species in Australia. Feral pigs pose a significant threat to the environment, agricultural industry, and human health, and in far north Queensland they endanger World Heritage values of the Wet Tropics. Historical records document the first introduction of domestic pigs into Australia via European settlers in 1788 and subsequent introductions from Asia from 1827 onwards. Since this time, domestic pigs have been accidentally and deliberately released into the wild and significant feral pig populations have become established, resulting in the declaration of this species as a class 2 pest in Queensland. The overall objective of this study was to assess the population genetic structure of feral pigs in far north Queensland, in particular to enable delineation of demographically independent management units. The identification of ecologically meaningful management units using molecular techniques can assist in targeting feral pig control to bring about effective long-term management. Molecular genetic analysis was undertaken on 434 feral pigs from 35 localities between Tully and Innisfail. Seven polymorphic and unlinked microsatellite loci were screened and fixation indices (FST and analogues) and Bayesian clustering methods were used to identify population structure and management units in the study area. Sequencing of the hyper-variable mitochondrial control region (D-loop) of 35 feral pigs was also examined to identify pig ancestry. Three management units were identified in the study at a scale of 25 to 35 km. Even with the strong pattern of genetic structure identified in the study area, some evidence of long distance dispersal and/or translocation was found as a small number of individuals exhibited ancestry from a management unit outside of which they were sampled. Overall, gene flow in the study area was found to be influenced by environmental features such as topography and land use, but no distinct or obvious natural or anthropogenic geographic barriers were identified. Furthermore, strong evidence was found for non-random mating between pigs of European and Asian breeds indicating that feral pig ancestry influences their population genetic structure. Phylogenetic analysis revealed two distinct mitochondrial DNA clades, representing Asian domestic pig breeds and European breeds. A significant finding was that pigs of Asian origin living in Innisfail and south Tully were not mating randomly with European breed pigs populating the nearby Mission Beach area. Feral pig control should be implemented in each of the management units identified in this study. The control should be coordinated across properties within each management unit to prevent re-colonisation from adjacent localities. The adjacent rainforest and National Park Estates, as well as the rainforest-crop boundary should be included in a simultaneous control operation for greater success.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The thesis uses creative practice and Indigenous knowledge frameworks with design methods to explore the ways in which virtual technology can represent Indigenous history and culture.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

World Heritage Landscapes (WHLs) are receiving increased attention from researchers, urban planners, managers, and policy makers and many heritage values and resources are becoming irreversibly lost. This phenomenon is especially prominent for WHLs located in cities, where greater development opportunities are involved. Decision making for sustainable urban landscape planning, conservation and management of WHLs often takes place from an economic perspective, especially in developing countries. This, together with the uncertain source of funding to cover WHL operating and maintenance costs, has resulted in many urban managers seeking private sector funding either in the form of visitor access fees or leasing part of the site for high-rental facilities such as five star hotels, clubs and expensive restaurants. For the former, this can result in low-income urban citizens being unable to afford the access fees and hence contradicting the principle of equal access for all; while, for the latter, the principle of open access for all is equally violated. To resolve this conflict, a game model is developed to determine how urban managers should allocate WHL spaces to maximize the combination of economic, social and ecological benefits and cultural values. A case study is provided of the Hangzhou's West Lake Scenic Area, a WHL located at the centre of Hangzhou city, in which several high-rental facilities have recently been closed down by the local authorities due to charges of elitism and misuse of public funds by government officials. The result shows that the best solution is to lease a small space with high rents and leave the remainder of the site to the public. This solution is likely to be applicable only in cities with a strong economy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Through its mandate to protect and preserve places of ‘outstanding universal value’, the World Heritage Convention provides an unlikely yet effective tool in global efforts to mitigate climate change. The practical efficacy of the Strategy to Assist States Parties to Implement Appropriate Management Responses (‘the Strategy’), which represents the World Heritage Committee’s primary response to the threats posed by climate change to World Heritage sites, is undermined by its weak stance on mitigation. This paper argues that the World Heritage Convention imposes stronger obligations on States Parties than those contained in the Strategy, including a duty on States Parties to commit to ‘deep cuts’ in greenhouse gas emissions. In order to ensure the continuing success of the World Heritage Convention States Parties must engage in extensive mitigation strategies without delay.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

While education researchers have drawn on the work of a wide diversity of theorists over the years, much contemporary theory building in these areas has revolved around the work of Pierre Bourdieu. Theory as Method in Research develops the capacity of students, researchers and teachers to successfully put Bourdieu’s ideas to work in their own research and prepare them effectively for conducting Masters and Doctoral scholarships. Structured around four core themes, this book provides a range of research case studies exploring educational identities, educational inequalities, school leadership and management, and research in teacher education. Issues as diverse as Chinese language learning and identity, school leadership in Australia and the school experience of Afro-Trinidadian boys, are covered, intertwined with a set of innovative approaches to theory application in education research. This collection brings together, in one comprehensive volume, a set of education researchers who place Pierre Bourdieu’s key concepts such as habitus, capital and field at the centre of their research methodologies. Full of insight and innovation, the book is an essential read for practitioners, student teachers, researchers and academics who want to harness the potential of Bourdieu’s core concepts in their own work, thereby helping to bridge the gap between theory and method in education research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research was undertaken to encompass and identify challenges and impact factors that affect the successful outcomes of heritage building projects, especially those related to finding major causes of delays and cost overruns across projects in all Australian states. This project determined and analysed the causes of such delays and programme issues emanating from the planning and execution phases, whilst also analysing the requirements for management of multiple stakeholder relationships and the influence of unforeseen technical factors. The research proposes "call for action" guidance and was validated by experienced experts in heritage building projects in Australia. The proposed guidance is designed to ensure that realistic cost targets and delivery timeframes are set in future heritage projects, and necessary interventions made at appropriate project stages to ensure decisions are made that will help to prevent overtime and cost overuns.