11 resultados para Total Cost Management
em Universidade do Minho
Resumo:
The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão Industrial
Resumo:
Dissertação de mestrado em Engenharia e Gestão da Qualidade
Resumo:
This paper proposes a smart battery charging strategy for Electric Vehicles (EVs) targeting the future smart homes. The proposed strategy consists in regulate the EV battery charging current in function of the total home current, aiming to prevent overcurrent trips in the main switch breaker. Computational and experimental results were obtained under real-time conditions to validate the proposed strategy. For such purpose was adapted a bidirectional EV battery charger prototype to operate in accordance with the aforementioned strategy. The proposed strategy was validated through experimental results obtained both in steady and transient states. The results show the correct operation of the EV battery charger even under heavy load variations.
Resumo:
During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).
Resumo:
Security risk management is by definition, a subjective and complex exercise and it takes time to perform properly. Human resources are fundamental assets for any organization, and as any other asset, they have inherent vulnerabilities that need to be handled, i.e. managed and assessed. However, the nature that characterize the human behavior and the organizational environment where they develop their work turn these task extremely difficult, hard to accomplish and prone to errors. Assuming security as a cost, organizations are usually focused on the efficiency of the security mechanisms implemented that enable them to protect against external attacks, disregarding the insider risks, which are much more difficult to assess. All these demands an interdisciplinary approach in order to combine technical solutions with psychology approaches in order to understand the organizational staff and detect any changes in their behaviors and characteristics. This paper intends to discuss some methodological challenges to evaluate the insider threats and its impacts, and integrate them in a security risk framework, that was defined according to the security standard ISO/IEC_JTC1, to support the security risk management process.
Resumo:
This article describes the evaluation of a psychological intervention—the Career Self-Management Seminar, Version A, for undergraduate students, and Version B for postgraduate students—developed to support Portuguese college students in career exploration, goal setting, design and implementation of action plans, and decision-making. A total of 120 participants from CSMS-A (experimental group, n = 58; control group, n = 62) and 98 from CSMS-B (experimental group, n = 62; control group, n = 36) were assessed by the Career Exploration Survey according to a pretest and posttest plan. Results demonstrate a significant increase in most of the cognitive, behavioral, and affective career exploration dimensions among the CSMS-A and CSMS-B experimental groups.
Resumo:
Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão Industrial
Resumo:
A teoria institucional constituiu o enquadramento no qual foi suportada a pergunta geral desta investigação: como e porquê a Normalização da Contabilidade de Gestão (NCG) nos hospitais públicos portugueses surgiu e evoluiu? O objetivo geral foi compreender de forma profunda o surgimento e a mudança nas regras de NCG dos hospitais públicos portugueses no período histórico 1954-2011. Face ao enquadramento institucional que justificou uma investigação interpretativa, foi usado como método de investigação um estudo de caso explanatório. A evidência sobre o caso da NCG nos hospitais públicos portugueses foi recolhida em documentos e através de 58 entrevistas realizadas em 47 unidades de análise (nos serviços centrais de contabilidade do Ministério da Saúde e em 46 hospitais públicos, num total de 53 existentes). Quanto aos principais resultados obtidos, no período 1954-1974, as regras criadas pelo poder político para controlo dos gastos públicos e a contabilidade orçamental de base de caixa estiveram na génese dos primeiros conceitos de Contabilidade de Gestão (CG) para os serviços públicos de saúde portugueses. A transição de um regime ditatorial para um regime democrático (25 de Abril de 1974), a criação do Plano Oficial de Contabilidade (POC/77) e a implementação de um estado social com Serviço Nacional de Saúde (SNS) criaram a conjuntura crítica necessária para o surgimento de um Plano Oficial de Contabilidade para os Serviços de Saúde (POCSS/80) que incluiu regras de CG. A primeira edição do Plano de Contabilidade Analítica dos Hospitais (PCAH), aprovada em 1996, não foi uma construção de raiz, mas antes uma adaptação para os hospitais das regras de CG incluídas no POCSS/91 que havia revisto o POCSS/80. Após o início da implementação do PCAH, em 1998, ocorreram sequências de autorreforço institucionalizadoras destas normas, no período 1998-2011, por influência de pressões isomórficas coercivas que delinearam um processo de evolução incremental cujo resultado foi uma reprodução por adaptação, num contexto de dependência de recursos. Vários agentes internos e externos pressionaram, no período 2003-2011, através de sequências reativas para a desinstitucionalização do PCAH em resposta ao persistente fenómeno de loose coupling. Mas o PCAH só foi descontinuado nos hospitais com privatização da governação e rejeição dos anteriores sistemas de informação. Ao nível da extensão da teoria, este estudo de caso adotou o institucionalismo histórico na investigação em CG, quanto se sabe pela primeira vez, que se mostra útil na interpretação dos processos e dos resultados da criação e evolução de instituições de CG num determinado contexto histórico. Na condição de dependência de recursos, as sequências de autorreforço, via isomorfismo coercivo, tendem para uma institucionalização com fenómeno de loose coupling. Como resposta a este fenómeno, ocorrem sequências reativas no sentido da desinstitucionalização. Perante as pressões (políticas, funcionais, sociais e tecnológicas) desinstitucionalizadoras, o fator governação privada acelera o processo de desinstitucionalização, enquanto o fator governação pública impede ou abranda esse processo.
Resumo:
The selection of spawning habitat of a population of Octopus vulgaris that is subject to a small-scale exploitation was studied in the Cíes Islands within the National Park of the Atlantic Islands of Galicia (NW Spain). The technique used was visual censuses by scuba diving. We conducted 93 visual censuses from April 2012 to April 2014. The total swept area was 123.69 ha. Habitat features (season, depth, zone, bottom temperature, swept area, bottom substrate type, and creels fishing impact) were evaluated as predictors of the presence/absence of spawning dens using GAM models. O. vulgaris has a noteworthy preference for spawning in areas with hard bottom substrate and moderate depth (approximately 20 m). The higher density of spawning dens (1.08ha−1) was found in a surveyed area of 50.14ha located in the northeastern part of the northern Cíes Island. We propose to protect the area comprised from Punta Escodelo to Punta Ferreiro between 5 and 30 m depth. This area has a surface of 158 ha equivalent to 5.98% of the total marine area of the Cíes islands. The strengths and weaknesses of a management strategy based on the protection of the species’ spawning habitat are discussed.