7 resultados para Professional field

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines two kinds of questions relating to the lexical needs of professional ESP students: (1) what range of terms and words do they need help with? (2) what types of dictionary, bilingual and/or monolingual, can they make use of in solving lexical problems?

Relevância:

60.00% 60.00%

Publicador:

Resumo:

At present, in the University curricula in most countries, the decision theory and the mathematical models to aid decision making is not included, as in the graduate program like in Doctored and Master´s programs. In the Technical School of High Level Agronomic Engineers of the Technical University of Madrid (ETSIA-UPM), the need to offer to the future engineers training in a subject that could help them to take decisions in their profession was felt. Along the life, they will have to take a lot of decisions. Ones, will be important and others no. In the personal level, they will have to take several very important decisions, like the election of a career, professional work, or a couple, but in the professional field, the decision making is the main role of the Managers, Politicians and Leaders. They should be decision makers and will be paid for it. Therefore, nobody can understand that such a professional that is called to practice management responsibilities in the companies, does not take training in such an important matter. For it, in the year 2000, it was requested to the University Board to introduce in the curricula an optional qualified subject of the second cycle with 4,5 credits titled " Mathematical Methods for Making Decisions ". A program was elaborated, the didactic material prepared and programs as Maple, Lingo, Math Cad, etc. installed in several IT classrooms, where the course will be taught. In the course 2000-2001 this subject was offered with a great acceptance that exceeded the forecasts of capacity and had to be prepared more classrooms. This course in graduate program took place in the Department of Applied Mathematics to the Agronomic Engineering, as an extension of the credits dedicated to Mathematics in the career of Engineering.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

El objetivo de la presente investigación es el desarrollo de un modelo de cálculo rápido, eficiente y preciso, para la estimación de los costes finales de construcción, en las fases preliminares del proyecto arquitectónico. Se trata de una herramienta a utilizar durante el proceso de elaboración de estudios previos, anteproyecto y proyecto básico, no siendo por tanto preciso para calcular el “predimensionado de costes” disponer de la total definición grafica y literal del proyecto. Se parte de la hipótesis de que en la aplicación práctica del modelo no se producirán desviaciones superiores al 10 % sobre el coste final de la obra proyectada. Para ello se formulan en el modelo de predimensionado cinco niveles de estimación de costes, de menor a mayor definición conceptual y gráfica del proyecto arquitectónico. Los cinco niveles de cálculo son: dos que toman como referencia los valores “exógenos” de venta de las viviendas (promoción inicial y promoción básica) y tres basados en cálculos de costes “endógenos” de la obra proyectada (estudios previos, anteproyecto y proyecto básico). El primer nivel de estimación de carácter “exógeno” (nivel .1), se calcula en base a la valoración de mercado de la promoción inmobiliaria y a su porcentaje de repercusión de suelo sobre el valor de venta de las viviendas. El quinto nivel de valoración, también de carácter “exógeno” (nivel .5), se calcula a partir del contraste entre el valor externo básico de mercado, los costes de construcción y los gastos de promoción estimados de la obra proyectada. Este contraste entre la “repercusión del coste de construcción” y el valor de mercado, supone una innovación respecto a los modelos de predimensionado de costes existentes, como proceso metodológico de verificación y validación extrínseca, de la precisión y validez de las estimaciones resultantes de la aplicación práctica del modelo, que se denomina Pcr.5n (Predimensionado costes de referencia con .5niveles de cálculo según fase de definición proyectual / ideación arquitectónica). Los otros tres niveles de predimensionado de costes de construcción “endógenos”, se estiman mediante cálculos analíticos internos por unidades de obra y cálculos sintéticos por sistemas constructivos y espacios funcionales, lo que se lleva a cabo en las etapas iniciales del proyecto correspondientes a estudios previos (nivel .2), anteproyecto (nivel .3) y proyecto básico (nivel .4). Estos cálculos teóricos internos son finalmente evaluados y validados mediante la aplicación práctica del modelo en obras de edificación residencial, de las que se conocen sus costes reales de liquidación final de obra. Según va evolucionando y se incrementa el nivel de definición y desarrollo del proyecto, desde los estudios previos hasta el proyecto básico, el cálculo se va perfeccionando en su nivel de eficiencia y precisión de la estimación, según la metodología aplicada: [aproximaciones sucesivas en intervalos finitos], siendo la hipótesis básica como anteriormente se ha avanzado, lograr una desviación máxima de una décima parte en el cálculo estimativo del predimensionado del coste real de obra. El cálculo del coste de ejecución material de la obra, se desarrolla en base a parámetros cúbicos funcionales “tridimensionales” del espacio proyectado y parámetros métricos constructivos “bidimensionales” de la envolvente exterior de cubierta/fachada y de la huella del edificio sobre el terreno. Los costes funcionales y constructivos se ponderan en cada fase del proceso de cálculo con sus parámetros “temáticos/específicos” de gestión (Pg), proyecto (Pp) y ejecución (Pe) de la concreta obra presupuestada, para finalmente estimar el coste de construcción por contrata, como resultado de incrementar al coste de ejecución material el porcentaje correspondiente al parámetro temático/especifico de la obra proyectada. El modelo de predimensionado de costes de construcción Pcr.5n, será una herramienta de gran interés y utilidad en el ámbito profesional, para la estimación del coste correspondiente al Proyecto Básico previsto en el marco técnico y legal de aplicación. Según el Anejo I del Código Técnico de la Edificación (CTE), es de obligado cumplimiento que el proyecto básico contenga una “Valoración aproximada de la ejecución material de la obra proyectada por capítulos”, es decir , que el Proyecto Básico ha de contener al menos un “presupuesto aproximado”, por capítulos, oficios ó tecnologías. El referido cálculo aproximado del presupuesto en el Proyecto Básico, necesariamente se ha de realizar mediante la técnica del predimensionado de costes, dado que en esta fase del proyecto arquitectónico aún no se dispone de cálculos de estructura, planos de acondicionamiento e instalaciones, ni de la resolución constructiva de la envolvente, por cuanto no se han desarrollado las especificaciones propias del posterior proyecto de ejecución. Esta estimación aproximada del coste de la obra, es sencilla de calcular mediante la aplicación práctica del modelo desarrollado, y ello tanto para estudiantes como para profesionales del sector de la construcción. Como se contiene y justifica en el presente trabajo, la aplicación práctica del modelo para el cálculo de costes en las fases preliminares del proyecto, es rápida y certera, siendo de sencilla aplicación tanto en vivienda unifamiliar (aisladas y pareadas), como en viviendas colectivas (bloques y manzanas). También, el modelo es de aplicación en el ámbito de la valoración inmobiliaria, tasaciones, análisis de viabilidad económica de promociones inmobiliarias, estimación de costes de obras terminadas y en general, cuando no se dispone del proyecto de ejecución y sea preciso calcular los costes de construcción de las obras proyectadas. Además, el modelo puede ser de aplicación para el chequeo de presupuestos calculados por el método analítico tradicional (estado de mediciones pormenorizadas por sus precios unitarios y costes descompuestos), tanto en obras de iniciativa privada como en obras promovidas por las Administraciones Públicas. Por último, como líneas abiertas a futuras investigaciones, el modelo de “predimensionado costes de referencia 5 niveles de cálculo”, se podría adaptar y aplicar para otros usos y tipologías diferentes a la residencial, como edificios de equipamientos y dotaciones públicas, valoración de edificios históricos, obras de urbanización interior y exterior de parcela, proyectos de parques y jardines, etc….. Estas lineas de investigación suponen trabajos paralelos al aquí desarrollado, y que a modo de avance parcial se recogen en las comunicaciones presentadas en los Congresos internacionales Scieconf/Junio 2013, Rics‐Cobra/Septiembre 2013 y en el IV Congreso nacional de patología en la edificación‐Ucam/Abril 2014. ABSTRACT The aim of this research is to develop a fast, efficient and accurate calculation model to estimate the final costs of construction, during the preliminary stages of the architectural project. It is a tool to be used during the preliminary study process, drafting and basic project. It is not therefore necessary to have the exact, graphic definition of the project in order to be able to calculate the cost‐scaling. It is assumed that no deviation 10% higher than the final cost of the projected work will occur during the implementation. To that purpose five levels of cost estimation are formulated in the scaling model, from a lower to a higher conceptual and graphic definition of the architectural project. The five calculation levels are: two that take as point of reference the ”exogenous” values of house sales (initial development and basic development), and three based on calculation of endogenous costs (preliminary study, drafting and basic project). The first ”exogenous” estimation level (level.1) is calculated over the market valuation of real estate development and the proportion the cost of land has over the value of the houses. The fifth level of valuation, also an ”exogenous” one (level.5) is calculated from the contrast between the basic external market value, the construction costs, and the estimated development costs of the projected work. This contrast between the ”repercussions of construction costs” and the market value is an innovation regarding the existing cost‐scaling models, as a methodological process of extrinsic verification and validation, of the accuracy and validity of the estimations obtained from the implementation of the model, which is called Pcr.5n (reference cost‐scaling with .5calculation levels according to the stage of project definition/ architectural conceptualization) The other three levels of “endogenous” construction cost‐scaling are estimated from internal analytical calculations by project units and synthetic calculations by construction systems and functional spaces. This is performed during the initial stages of the project corresponding to preliminary study process (level.2), drafting (level.3) and basic project (level.4). These theoretical internal calculations are finally evaluated and validated via implementation of the model in residential buildings, whose real costs on final payment of the works are known. As the level of definition and development of the project evolves, from preliminary study to basic project, the calculation improves in its level of efficiency and estimation accuracy, following the applied methodology: [successive approximations at finite intervals]. The basic hypothesis as above has been made, achieving a maximum deviation of one tenth, in the estimated calculation of the true cost of predimensioning work. The cost calculation for material execution of the works is developed from functional “three‐dimensional” cubic parameters for the planned space and constructive “two dimensional” metric parameters for the surface that envelopes around the facade and the building’s footprint on the plot. The functional and building costs are analyzed at every stage of the process of calculation with “thematic/specific” parameters of management (Pg), project (Pp) and execution (Pe) of the estimated work in question, and finally the cost of contractual construction is estimated, as a consequence of increasing the cost of material execution with the percentage pertaining to the thematic/specific parameter of the projected work. The construction cost‐scaling Pcr.5n model will be a useful tool of great interest in the professional field to estimate the cost of the Basic Project as prescribed in the technical and legal framework of application. According to the appendix of the Technical Building Code (CTE), it is compulsory that the basic project contains an “approximate valuation of the material execution of the work, projected by chapters”, that is, that the basic project must contain at least an “approximate estimate” by chapter, trade or technology. This approximate estimate in the Basic Project is to be performed through the cost‐scaling technique, given that structural calculations, reconditioning plans and definitive contruction details of the envelope are still not available at this stage of the architectural project, insofar as specifications pertaining to the later project have not yet been developed. This approximate estimate of the cost of the works is easy to calculate through the implementation of the given model, both for students and professionals of the building sector. As explained and justified in this work, the implementation of the model for cost‐scaling during the preliminary stage is fast and accurate, as well as easy to apply both in single‐family houses (detached and semi‐detached) and collective housing (blocks). The model can also be applied in the field of the real‐estate valuation, official appraisal, analysis of the economic viability of real estate developments, estimate of the cost of finished projects and, generally, when an implementation project is not available and it is necessary to calculate the building costs of the projected works. The model can also be applied to check estimates calculated by the traditional analytical method (state of measurements broken down into price per unit cost details), both in private works and those promoted by Public Authorities. Finally, as potential lines for future research, the “five levels of calculation cost‐scaling model”, could be adapted and applied to purposes and typologies other than the residential one, such as service buildings and public facilities, valuation of historical buildings, interior and exterior development works, park and garden planning, etc… These lines of investigation are parallel to this one and, by way of a preview, can be found in the dissertations given in the International Congresses Scieconf/June 2013, Rics‐Cobra/September 2013 and in the IV Congress on building pathology ‐Ucam/April 2014.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Inside COBRA 2011 RICS International Research Conference, the present paper is linked to analyze the liability of the construction professional in his practice as a expert witness in the Spanish legal framework. In a large number of legal procedures related to the building it is necessary the intervention of the expert witness to report on the subject of litigation, and to give an opinion about possible causes and solutions. This field is increasingly importantly for the practice of construction professional that requires an important specialization. The expert provides his knowledge to the judge in the matter he is dealing with (construction, planning, assessment, legal, ...), providing arguments or reasons as the base for his case and acting as part of the evidence. Although the importance of expert intervention in the judicial process, the responsibilities arising from their activity is a slightly studied field. Therefore, the study has as purpose to think about the regulation of professional activities raising different aims. The first is to define the action of the construction professional-expert witness and the need for expert evidence, establishing the legal implications of this professional activity. The different types of responsibilities (the civil, criminal and administrative) have been established as well as the economic, penal or disciplinary damages that can be derived from the expert report

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Teamwork, is one of the abilities that today is highly valued in the professional arena with a great importance for various personal and interpersonal skills associated with it. In this context, the Technical University of Madrid, is developing a coordinated educational innovation project, which main objective is to develop methodological and assessment tools for the acquisition of personal skills necessary to improve the employability of graduates and their skills for project management. Within this context, this paper proposes a methodology composed of various activities and indicators, as well as specific assessment instruments linked to the teamwork competence. Through a series of systematic steps it was allowed the design of an instrument and construction of a scale for measuring the competence of teamwork. The practical application of the methodology has been carried out in Projects lectures from different Schools of Engineering at the Technical University of Madrid, which results are presented in this document as a pilot experience. Results show the various aspects and methods that teachers should consider in evaluating the competence of the work, including analysis of the quality of results, through reliability and construct validity. On the other hand, show the advantages of applying this methodology in the field of project management teaching.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El análisis del rendimiento en deportes juega un papel esencial en el fútbol profesional. Aunque el estudio del análisis del juego en fútbol se ha utilizado desde diferentes ámbitos y situaciones, todavía existen diferentes aspectos y componentes del juego que siguen sin estar estudiados. En este sentido existen diferentes aspectos que deben de superar los estudios previos centrados en el componente descriptivo tales como el uso de variables/ indicadores de rendimiento que no se han definido ni estudiado, la validez de los métodos observaciones que no han sido testados con los softwares específicos en fútbol, la aplicación y utilidad de los resultados, así como las limitaciones del estudio de las variables situacionales/contextuales. Con el objetivo de cubrir las citadas limitaciones se han diseñado 6 estudios independientes e inter-relacionados que tratan de estudiar los aspectos anteriormente referidos. El primer estudio evalua la fiabilidad inter-observadores de las estadísticas de juego de la empresa privada OPTA Sportsdata, estos datos son la muestra de estudio de la presente tesis doctoral. Dos grupos de observadores experimentados se requieren para analizar un partido de la liga española de manera independiente. Los resultados muestran que los eventos de equipos y porteros codificados por los inter-operadores alcanzan un acuerdo muy bueno (valores kappa entre 0.86 y 0.94). La validez inter-observadores de las acciones de juego y los datos de jugadores individuales se evaluó con elevados niveles de acuerdo (valores del coeficiente de correlación intraclase entre 0.88 hasta 1.00, el error típico estandarizado variaba entre 0.00 hasta 0.37). Los resultados sugieren que las estadísticas de juego registradas por los operadores de la empresa OPTA Sportsdata están bien entrenados y son fiables. El segundo, tercer y cuarto estudio se centran en resaltar la aplicabilidad del análisis de rendimiento en el fútbol así como para explicar en profundidad las influencias de las variables situacionales. Utilizando la técnica de los perfiles de rendimiento de jugadores y equipos de fútbol se puede evaluar y comparar de manera gráfica, fácil y visual. Así mismo, mediante esta técnica se puede controlar el efecto de las variables situacionales (localización del partido, nivel del equipo y del oponente, y el resultado final del partido). Los perfiles de rendimiento de porteros (n = 46 porteros, 744 observaciones) y jugadores de campo (n = 409 jugadores, 5288 observaciones) de la primera division professional de fútbol Española (La Liga, temporada 2012-13), los equipos (n = 496 partidos, 992 observaciones) de la UEFA Champions League (temporadas 2009-10 a 2012-13) fueron analizados registrando la media, desviación típica, mediana, cuartiles superior e inferior y el recuento de valores de cada indicador de rendimiento y evento, los cuales se presentaron en su forma tipificada y normalizada. Los valores medios de los porteros de los equipos de diferentes niveles de La Liga y de los equipos de diferente nivel de la UEFA Champions League cuando jugaban en diferentes contextos de juego y situaciones (variables situacionales) fueron comparados utilizando el ANOVA de un factor y la prueba t para muestras independientes (localización del partido, diferencias entre casa y fuera), y fueron establecidos en los perfiles de red después de unificar todos los registros en la misma escala derivada con valores estandarizados. Mientras que las diferencias de rendimiento entre los jugadores de los mejores equipos (Top3) y los peores (Bottom3) fueron comparados mediante el uso de diferencias en la magnitud del tamaño del efecto. El quinto y el sexto estudio analizaban el rendimiento del fútbol desde un punto de vista de predicción del rendimiento. El modelo linear general y el modelo lineal general mixto fue empleado para analizar la magnitud de las relaciones de los indicadores y estadísticas de juego con el resultado final del partido en función del tipo de partido (partidos ajustados o todos los partidos) en la fase de grupos de la Copa del Mundo 2014 de Brasil (n = 48 partidos, 38 partidos ajustados) y La Liga 2012-13 (n = 320 partidos ajustados). Las relaciones fueron evaluadas mediante las inferencias en la magnitud de las diferencias y se expresaron como partidos extra ganados o perdidos por cada 10 partidos mediante la variable calculada en 2 desviaciones típicas. Los resultados mostraron que, para los 48 partidos de la fase de grupos de la Copa del Mundo 2014, nueve variables tuvieron un efecto positive en la probabilidad de ganar (tiros, tiros a puerta, tiros de contraataque, tiros dentro del área, posesión de balón, pases en corto, media de secuencia de pases, duelos aéreos y entradas), cuatro tuvieron efectos negativos (tiros bloqueados, centros, regates y tarjetas amarillas), y otras 12 variables tenían efectos triviales o poco claros. Mientras que los 38 partidos ajustados, el efecto de duelos aéreos y tarjetas amarillas fueron triviales y claramente negativos respectivamente. En la La Liga, existió un efecto moderado positive para cada equipo para los tiros a puerta (3.4 victorias extras por cada 10 partidos; 99% IC ±1.0), y un efecto positivo reducido para tiros totales (1.7 victorias extrsa; ±1.0). Los efectos de la mayoría de los eventos se han relacionado con la posesión del balón, la cual obtuvo efectos negativos entre equipos (1.2 derrotas extras; ±1.0) pero un efecto positivo pequeño entra equipos (1.7 victorias extras; ±1.4). La localización del partido mostró un efecto positive reducido dentro de los equipos (1.9 victorias extras; ±0.9). Los resultados obtenidos en los perfiles y el modelado del rendimiento permiten ofrecer una información detallada y avanzada para el entrenamiento, la preparación previa a los partidos, el control de la competición y el análisis post-partido, así como la evaluación e identificación del talento de los jugadores. ABSTRACT Match performance analysis plays an important role in the modern professional football. Although the research in football match analysis is well-developed, there are still some issues and problems remaining in this field, which mainly include the lack of operational definitions of variables, reliability issues, applicability of the findings, the lack of contextual/situational variables, and focusing too much on descriptive and comparative analysis. In order to address these issues, six independent but related studies were conducted in the current thesis. The first study evaluated the inter-operator reliability of football match statistics from OPTA Sportsdata Company which is the data resourse of the thesis. Two groups of experienced operators were required to analyse a Spanish league match independently in the experiment. Results showed that team events and goalkeeper actions coded by independent operators reached a very good agreement (kappa values between 0.86 and 0.94). The inter-operator reliability of match actions and events of individual outfield players was also tested to be at a high level (intra-class correlation coefficients ranged from 0.88 to 1.00, standardised typical error varied from 0.00 to 0.37). These results suggest that the football match statistics collected by well-trained operators from OPTA Sportsdata Company are reliable. The second, third and fourth study aims to enhance the applicability of football match performance analysis and to explore deeply the influences of situational variables. By using a profiling technique, technical and tactical performances of football players and teams can be interpreted, evaluated and compared more easily and straightforwardly, meanwhile, influences and effects from situational variables (match location, strength of team and opposition, and match outcome) on the performances can be properly incorporated. Performance profiles of goalkeepers (n = 46 goalkeepers, 744 full match observations) and outfield players (n = 409 players, 5288 full match observations) from the Spanish First Division Professional Football League (La Liga, season 2012-13), teams (n = 496 matches, 992 observations) from UEFA Champions League (seasons 2009-10 to 2012-13) were set up by presenting the mean, standard deviation, median, lower and upper quartiles of the count values of each performance-related match action and event to represent their typical performances and spreads. Means of goalkeeper from different levels of team in La Liga and teams of different strength in UEFA Champions League when playing under different situational conditions were compared by using one-way ANOVA and independent sample t test (for match location, home and away differences), and were plotted into the same radar charts after unifying all the event counts by standardised score. While differences between the performances of outfield players from Top3 and from Bottom3 teams were compared by magnitude-based inferences. The fifth and sixth study aims to move from the descriptive and comparative football match analysis to a more predictive one. Generalised linear modelling and generalised mixed linear modelling were undertaken to quantify relationships of the performance-related match events, actions and variables with the match outcome in different types of games (close games and all games) in the group stage of 2014 Brazil FIFA World Cup (n = 48 games, 38 close games) and La Liga 2012-13 (n = 320 close games). Relationships were evaluated with magnitude-based inferences and were expressed as extra matches won or lost per 10 matches for an increase of two standard deviations of a variable. Results showed that, for all the 48 games in the group stage of 2014 FIFA World Cup, nine variables had clearly positive effects on the probability of winning (shot, shot on target, shot from counter attack, shot from inside area, ball possession, short pass, average pass streak, aerial advantage, and tackle), four had clearly negative effects (shot blocked, cross, dribble and red card), other 12 variabless had either trivial or unclear effects. While for the 38 close games, the effects of aerial advantage and yellow card turned to trivial and clearly negative, respectively. In the La Liga, there was a moderate positive within-team effect from shots on target (3.4 extra wins per 10 matches; 99% confidence limits ±1.0), and a small positive within-team effect from total shots (1.7 extra wins; ±1.0). Effects of most other match events were related to ball possession, which had a small negative within-team effect (1.2 extra losses; ±1.0) but a small positive between-team effect (1.7 extra wins; ±1.4). Game location showed a small positive within-team effect (1.9 extra wins; ±0.9). Results from the established performance profiles and modelling can provide detailed and straightforward information for training, pre-match preparations, in-match tactical approaches and post-match evaluations, as well as for player identification and development. 摘要 比赛表现分析在现代足球中起着举足轻重的作用。尽管如今对足球比赛表现分析的研究已经相对完善,但仍有很多不足之处。这些不足主要体现在:研究中缺乏对研究变量的清晰定义、数据信效度缺失、研究结果的实用性受限、比赛情境因素缺失以及过于集中在描述性和对比性分析等。针对这些问题,本论文通过六个独立而又相互联系的研究,进一步对足球比赛表现分析进行完善。 第一个研究对本论文的数据源--OPTA Sportsdata公司的足球比赛数据的信效度进行了实验检验。实验中,两组数据收集人员被要求对同一场西班牙足球甲级联赛的比赛进行分析。研究结果显示,两组收集人员记录下的球队比赛事件和守门员比赛行为具有高度的一致性(卡帕系数介于0.86和0.94)。收集人员输出的外场球员的比赛行为和比赛事件也具有很高的组间一致性(ICC相关系数介于0.88和1.00,标准化典型误差介于0.00和0.37)。实验结果证明了OPTA Sportsdata公司收集的足球比赛数据具有足够高的信效度。 第二、三、四个研究旨在提升足球比赛表现分析研究结果的实用性以及深度探讨比赛情境因素对足球比赛表现的影响。通过对足球运动员和运动队的比赛技战术表现进行档案创建,可以对运动员和运动队的比赛表现进行简直接而直观的呈现、评价和对比,同时,情境变量(比赛场地、球队和对手实力、比赛结果)对比赛表现的影响也可以被整合到表现档案中。本部分对2012-13赛季西班牙足球甲级联赛的参赛守门员(n = 46球员人次,744比赛场次)和外场球员(n = 409球员人次, 5288比赛场次)以及2009-10至2012-13赛季欧洲足球冠军联赛的参赛球队(n = 496比赛场次)的比赛技战术表现进行了档案创建。在表现档案中,各项比赛技战术指标的均值、标准差、中位数和大小四分位数被用来展现守门员、外场球员和球队的普遍表现和表现浮动性。方差分析(ANOVA)被用来对西甲不同水平球队的守门员、欧冠中不同水平球队在不同比赛情境下的普遍表现(各项指标的均值)进行对比,独立样本t检验被用来对比主客场比赛普遍表现的差异。数据量级推断(magnitude-based inferences)的方法则被用来对西甲前三名和最后三名球队外场球员的普遍表现进行对比分析。所有来自不同水平球队的运动员和不同水平运动队的各项比赛指标皆被转换成了标准分数,从而能把他们在各种不同比赛情境下的普遍表现(各项比赛指标的均值)投到相同的雷达图中进行直观的对比。 第五和第六个研究目的在于进行预测性足球比赛表现分析,从而跨越之前固有的描述性和对比性分析。广义线性模型和广义混合线性模型被用来对2014年巴西世界杯小组赛(n = 48 比赛场次,38小分差场次)和2012-13赛季西甲联赛(n = 320小分差场次)的比赛中各表现相关比赛事件、行为和变量与比赛结果(胜、平、负)的关系进行建模。模型中的关系通过数据量级推断(magnitude-based inferences)的方法来界定,具体表现为某个变量增加两个标准差对比赛结果的影响(每10场比赛中额外取胜或失利的场数)。研究结果显示,在2014年巴西世界杯小组赛的所有48场比赛中,9个变量(射门、射正、反击中射门、禁区内射门、控球、短传、连续传球平均次数、高空球争抢成功率和抢断)与赢球概率有清晰的正相关关系,4个变量(射门被封堵、传中、过人和红牌)与赢球概率有清晰的负相关关系,其他12个被分析的变量与赢球概率的相关关系微小或不清晰。而在38场小分差比赛中,高空球争抢成功率由正相关变为微小关系,黄牌则由微小关系变为清晰的负相关。在西甲联赛中,每一支球队增加两个标准差的“射正球门”可以给每10场比赛带来3.4场额外胜利(99%置信区间±1.0场),而所有球队作为一个整体,每增加两个标准差的“射正球门”可以给每10场比赛带来1.7场额外胜利(99%置信区间±1.0场)。其他大多数比赛相关事件与比赛结果的相关关系与“控球”相关联。每一支球队增加两个标准差的“控球”将会给每10场比赛带来1.2场额外失利(99%置信区间±1.0场),而所有球队作为一个整体,每增加两个标准差的“控球”可以给每10场比赛带来1.7场额外胜利(99%置信区间±1.4场)。与客场比赛相对,主场能给球队带来1.9 /10场额外胜利(99%置信区间±0.9场)。 比赛表现档案和模型中得出的研究结果可以为俱乐部、足球队、教练组、表现分析师和运动员提供详细而直接的参考信息。这些信息可用于训练指导、赛前备战、赛中技战术调整和赛后技战术表现分析,也可运用于足球运动员选材、培养和发展。

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aiming to identify educational needs to promote employment in the field of Occupational Health and Safety in Spain, this paper analyses the matching degree between the existing university educational offer and the professional demand. Results indicate that the new official Masters are well driven but, at graduate level, a broad range of topics regarding occupational hazards should be promoted and the scope of cross subjects should be expanded. New profiles that are emerging within this field are also identified.