984 resultados para service productivity


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The productivity of a process is related to how effectively input resources are transformed into value for customers. For the needs of manufacturers of physical products there are widely used productivity concepts and measurements instruments. However, in service processes the underlying assumptions of these concepts and models do not hold. For example, manufacturing-based productivity models assume that an altered configuration of input resources in the production process does not lead to quality changes in outputs (the constant-quality assumption). However, in a service context changes in the production resources and productions systems do affect the perceived quality of services. Therefore, using manufacturing-oriented productivity models in service contexts are likely to give managers wrong directions for action. Research into the productivity of services is still scarce, because of the lack of viable models. The purpose of the present article is to analyse the requirements for the development of a productivity concept for service operations. Based on the analysis, a service productivity model is developed. According to this model, service productivity is a function of 1) how effectively input resources into the service (production) process are transformed to outputs in the form of services (internal or cost efficiency), 2) how well the quality of the service process and its outcome is perceived (external or revenue efficiency), and 3) how effectively the capacity of the service process is utilised (capacity efficiency). In addition, directions for developing measurement models for service productivity are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This chapter provides the theoretical foundation and background on data envelopment analysis (DEA) method. We first introduce the basic DEA models. The balance of this chapter focuses on evidences showing DEA has been extensively applied for measuring efficiency and productivity of services including financial services (banking, insurance, securities, and fund management), professional services, health services, education services, environmental and public services, energy services, logistics, tourism, information technology, telecommunications, transport, distribution, audio-visual, media, entertainment, cultural and other business services. Finally, we provide information on the use of Performance Improvement Management Software (PIM-DEA). A free limited version of this software and downloading procedure is also included in this chapter.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Productivity measurement poses a challenge for service organizations. Conventional management wisdom holds that this challenge is rooted in the difficulty of accurately quantifying service inputs and outputs. Few service firms have adequate service productivity measurement (SPM) systems in place and implementing such systems may involve organizational transformation. Combining field interviews and literature-based insights, the authors develop a conceptual model of antecedents of SPM in service firms and test it using data from 276 service firms. Results indicate that one out of five antecedents affects the choice to use SPM, namely, the degree of service standardization. In addition, all five hypothesized antecedents and one additional antecedent (perceived appropriateness of the current SPM) predict the degree of SPM usage. In particular, the degree of SPM is positively influenced by the degree of service standardization, service customization, investments in service productivity gains, and the appropriateness of current service productivity measures. In turn, customer integration and the perceived difficulty of measuring service productivity negatively affect SPM. The fact that customer integration impedes actual measurement of service productivity is a surprising finding, given that customer integration is widely seen as a means to increase service productivity. The authors conclude with implications for service organizations and directions for research.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Together with hard and soft networks tangible and intangible regional assets play an important role in the knowledge-based development of competing city-regions. The aim of this paper, therefore, is to investigate the best ways of managing invaluable tangible and intangible assets of city-regions. The paper explores the importance of asset management of city-regions by giving special emphasis on their knowledge asset base. This paper develops and introduces a theoretical framework to conceptualise a new approach to articulate the strategic planning mechanism, so called the 6K1C framework. The 6K1C framework is part of the strategic planning process of continuous improvement of overall public sector performance. The framework provides a proactive check-list approach integrated for managing and harnessing tangible and intangible assets of the post-industrial city-regions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Zambia and many other countries in Sub-Saharan Africa face a key challenge of sustaining high levels of coverage of AIDS treatment under prospects of dwindling global resources for HIV/AIDS treatment. Policy debate in HIV/AIDS is increasingly paying more focus to efficiency in the use of available resources. In this chapter, we apply Data Envelopment Analysis (DEA) to estimate short term technical efficiency of 34 HIV/AIDS treatment facilities in Zambia. The data consists of input variables such as human resources, medical equipment, building space, drugs, medical supplies, and other materials used in providing HIV/AIDS treatment. Two main outputs namely, numbers of ART-years (Anti-Retroviral Therapy-years) and pre-ART-years are included in the model. Results show the mean technical efficiency score to be 83%, with great variability in efficiency scores across the facilities. Scale inefficiency is also shown to be significant. About half of the facilities were on the efficiency frontier. We also construct bootstrap confidence intervals around the efficiency scores.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose – This paper aims to contribute to the debate on the drivers of the productivity gap that exists between the UK and its major international competitors. Design/methodology/approach – From the macro perspective the paper explores the quantitative evidence on the productivity differentials and how they are measured. From the micro perspective, the article explores the quantitative evidence on the role of management practices claimed to be a key determinant in promoting firm competitiveness and in bridging the UK gap. Findings – This study suggests that management practices are an ambiguous driver of firm productivity and higher firm performance. On the methodological side, qualitative and subjective measures of either management practices or firm performance are often used. This makes the results not comparable across studies, across firms or even within firms over time. Productivity and profitability are often and erroneously interchangeably used while productivity is only one element of firm performance. On the other hand, management practices are multi-dimensional constructs that generally do not demonstrate a straightforward relationship with productivity variables. To assume that they are the only driver of higher productivity may be misleading. Moreover, there is evidence of an inverse causal relationship between management practices and firm performance. This calls into question most empirical results of the extant literature based on the unidirectional assumption of direct causality between management practices and firm performance. Research limitations/implications – These and other issues suggest that more research is needed to deepen the understanding of the UK productivity gap and more quantitative evidence should be provided on the way in which management practices contribute to the UK competitiveness. Their impact is not easily measurable due to their complexity and their complementary nature and this is a fertile ground for further research. Originality/value – This paper brings together the evidence on the UK productivity gap and its main drivers, provided by the economics, management and performance measurement literature. This issue scores very highly in the agenda of policy makers and academics and has important implications for practitioners interested in evaluating the impact of managerial best practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Since 1993 we have been working on the automation of dragline excavators, the largest earthmoving machines that exist. Recently we completed a large-scale experimental program where the automation system was used for production purposes over a two week period and moved over 200,000 tonnes of overburden. This is a landmark achievement in the history of automated excavation. In this paper we briefly describe the robotic system and how it works cooperatively with the machine operator. We then describe our methodology for gauging machine performance, analyze results from the production trial and comment on the effectiveness of the system that we have created. © Springer-Verlag Berlin Heidelberg 2006.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Currently in the Australian higher education sector, the productivity benefits of occupational therapy clinical education placements are a contested issue. This article will report results of a study that developed a methodology for documenting time use during placements and investigated the productivity changes associated with occupational therapy clinical education placements in Queensland, Australia. Supervisors’ and students’ time use during placements and how this changed for supervisors compared to pre- and post-placement is also presented. Methods: Using a cohort survey design, participants were students from two Queensland universities, and their supervisors employed by Queensland Health. Time use was recorded in 30 minute blocks according to particular categories. Results: There was a significant increase in supervisors’ time spent in patient care activities (F = 94.0112,12.37 df, P < 0.001) between pre- and during placement (P < 0.001) and decrease between during and post-placement (P < 0.001). Supervisors’ time spent in all non-patient care activities was also significant (F = 4.5802,16 df, P = 0.027) increasing between pre- and during placement (P = 0.028). There was a significant decrease in supervisors’ time spent in placement activities (F = 5.1332,19.18 df, P = 0.016) from during to post-placement. Students spent more time than supervisors in patient care activities while on placement. Discussion: A novel method for reporting productivity and time-use changes during clinical education programs for occupational therapy has been applied. Supervisors spent considerable time in assessing and managing students and their clinical education role should be seen as core business in standard occupational therapy practice. This paper will contribute to future assessments of the economic.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The current study was motivated by statements made by the Economic Strategies Committee that Singapore’s recent productivity levels in services were well below countries such as the US, Japan and Hong Kong. Massive employment of foreign workers was cited as the reason for poor productivity levels. To shed more light on Singapore’s falling productivity, a nonparametric Malmquist productivity index was employed which provides measures of productivity change, technical change and efficiency change. The findings reveal that growth in Total Factor Productivity (TFP) was attributed to technical change with no improvement in efficiency change. Such results suggest that gains from TFP were input-driven rather than from a ‘best-practice’ approach such as improvements in operations or better resource allocation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Currently in the Australian higher education sector higher productivity from allied health clinical education placements are a contested issue. This paper will report results of a study that investigated output changes associated with occupational therapy and nutrition/dietetics clinical education placements in Queensland, Australia. Supervisors’ and students’ time use during placements and how this changes for supervisors compared to when students are not present in the workplace is also presented. Methodology/Principal Findings: A cohort design was used with students from four Queensland universities, and their supervisors employed by Queensland Health. There was an increasing trend in the number of occasions of service delivered when the students were present, and a statistically significant increase in the daily mean length of occasions of service delivered during the placement compared to pre-placement levels. For project-based placements that were not directly involved in patient care, supervisors’ project activity time decreased during placements, with students undertaking considerably more time in project activities. Conclusions/Significance: A novel method for estimating productivity and time use changes during clinical education programs for allied health disciplines has been applied. During clinical education placements there was a net increase in outputs, suggesting supervisors engage in longer consultations with patients for the purpose of training students, while maintaining patient numbers. Other activities are reduced. This paper is the first time these data have been shown and form a good basis for future assessments of the economic impact of student placements for allied health disciplines.