830 resultados para project management tools
Resumo:
The goal of this paper is to show the results of an on-going experience on teaching project management to grade students by following a development scheme of management related competencies on an individual basis. In order to achieve that goal, the students are organized in teams that must solve a problem and manage the development of a feasible solution to satisfy the needs of a client. The innovative component advocated in this paper is the formal introduction of negotiating and virtual team management aspects, as different teams from different universities at different locations and comprising students with different backgrounds must collaborate and compete amongst them. The different learning aspects are identified and the improvement levels are reflected in a rubric that has been designed ad hoc for this experience. Finally, the effort frameworks for the student and instructor have been established according to the requirements of the Bologna paradigms. This experience is developed through a software-based support system allowing blended learning for the theoretical and individual?s work aspects, blogs, wikis, etc., as well as project management tools based on WWW that allow the monitoring of not only the expected deliverables and the achievement of the goals but also the progress made on learning as established in the defined rubric
Resumo:
Objective of the thesis is to develop project management procedure for chilled beam projects. In organization is recognized that project management techniques could help in large and complex projects. Information sharing have been challenging in projects, so improvement of information sharing is one key topic of the thesis. Academic researches and literature are used to find suitable project management theories and methods. Main theories are related to phases of the project and project management tools. Practical knowledge of project management is collected from two project business oriented companies. Project management tools are chosen and modified to fulfill needs of the beam projects. Result of the thesis is proposed project management procedure, which includes phases of the chilled beam projects and project milestones. Project management procedure helps to recognize the most critical phases of the project and tools help to manage information of the project. Procedure increases knowledge of the project management techniques and tools. It also forms coherent project management working method among the chilled beam project group.
Resumo:
Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.
Resumo:
The purpose of this paper is to show how project management governance is addressed through the use of a specific meta-method. Governance is defined here on two criteria: accountability and performance. Accountability is promoted through transparency and performance is promoted by responsive and responsible decision-making. According to a systemic perspective, transparency and decision-making involve having information, tacit or explicit knowledge, as well as understanding of the context, the different parameters and variables, their interaction and conditions of change. Although this method of methods was built according a heuristic process involving 25 years of various researches and consulting activities, it seems appropriate to draw its foundations. I clarify first my epistemological position and the notion of project and project management, as Art and Science. This lead me to define a "Be" / "Have" posture to this regards. Then, the main theoretical roots of MAP Method are exposed: Boisot' s Social Learning Cycle, Praxeology and Theory of Convention. Then we introduced the main characteristics of the method and the 17 methods and tools constituting MAP "tool box", thus with regard to the project management governance perspective. Finally, I discuss the integration of two managerial modes (operational and project modes) and the consequence in term of governance in a specific socio-techno-economic project/context ecosystem.
Resumo:
Foreword: In this paper I call upon a praxiological approach. Praxeology (early alteration of praxiology) is the study of human action and conduct. The name praxeology/praxiologyakes is root in praxis, Medieval Latin, from Greek, doing, action, from prassein to do, practice (Merriam-Webster Dictionary). Having been involved in project management education, research and practice for the last twenty years, I have constantly tried to improve and to provide a better understanding/knowledge of the field and related practice, and as a consequence widen and deepen the competencies of the people I was working with (and my own competencies as well!), assuming that better project management lead to more efficient and effective use of resources, development of people and at the end to a better world. For some time I have perceived a need to clarify the foundations of the discipline of project management, or at least elucidate what these foundations could be. An immodest task, one might say! But not a neutral one! I am constantly surprised by the way the world (i.e., organizations, universities, students and professional bodies) sees project management: as a set of methods, techniques, tools, interacting with others fields – general management, engineering, construction, information systems, etc. – bringing some effective ways of dealing with various sets of problems – from launching a new satellite to product development through to organizational change.
Resumo:
Purpose – The purpose of this paper is to provide a summary description of the doctoral thesis investigating the field of project management (PM) deployment. Researchers will be informed of the current contributions within this topic and of the possible further investigations and researches. The decision makers and practitioners will be aware of a set of tools addressing the PM deployment with new perspectives. Design/methodology/approach – Research undertaken with the thesis is based on quantitative methods using time series statistics (time distance analysis) and comparative and correlation analysis aimed to better define and understand the PM deployment within and between countries or groups. Findings – The results suggest a project management deployment index (PMDI) to objectively measure the PM deployment based on the concept of certification. A proposed framework to empirically benchmark the PM deployment between countries by integrating the PMDI time series with the two dimensional comparative analysis of Sicherl. The correlation analysis within Hoftsede cultural framework shows the impact of the national culture dimensions on the PM deployment. The forecasting model shows a general continual growth trend of the PM deployment, with continual increase in the time distance between the countries. Research limitations/implications – The PM researchers are offered an empirical quantification on which they can construct further investigations and understanding of this phenomenon. The number of possible units that can be studied offers wide possibilities to replicate the thesis work. New researches can be undertaken to investigate further the contribution of other social or economical indicators, or to refine and enrich the definition of the PMDI indicator. Practical implications – These results have important implications on the PM deployment approaches. The PMDI measurements and time series comparisons facilitate considerably the measurement and benchmarking between the units (e.g. countries) and against targets, while the readiness setting of the studied unit (in terms of development and cultural levels) impacts the PM deployment within this country. Originality/value – This paper provides a summary of cutting-edge research work in the studied field of PM deployment and a link to the published works that researchers can use to help them understand the thesis research as well as how it can be extended.
Resumo:
This work describes a new web system to aid project management that was created to correct the principal deficiencies identified in systems having a common purpose which are at present available, as well as to follow the guidelines that are proposed in the Project Management Body of Knowledge (PMBoK) and the quality characteristics described in the ISO/IEC 9126 norm. As from the adopted methodology, the system was structured to attend the real necessities of project managers and also to contribute towards obtaining quality results from the projects. The validation of the proposed solution was done with the collaboration of professionals that used the functions available in it for a period of 15 days. Results attested to the quality and adequacy of the developed system.
Resumo:
Teamwork, is one of the abilities that today is highly valued in the professional arena with a great importance for various personal and interpersonal skills associated with it. In this context, the Technical University of Madrid, is developing a coordinated educational innovation project, which main objective is to develop methodological and assessment tools for the acquisition of personal skills necessary to improve the employability of graduates and their skills for project management. Within this context, this paper proposes a methodology composed of various activities and indicators, as well as specific assessment instruments linked to the teamwork competence. Through a series of systematic steps it was allowed the design of an instrument and construction of a scale for measuring the competence of teamwork. The practical application of the methodology has been carried out in Projects lectures from different Schools of Engineering at the Technical University of Madrid, which results are presented in this document as a pilot experience. Results show the various aspects and methods that teachers should consider in evaluating the competence of the work, including analysis of the quality of results, through reliability and construct validity. On the other hand, show the advantages of applying this methodology in the field of project management teaching.
Resumo:
This document presents an innovative, formal educational initiative that is aimed at enhancing the development of engineering students’ specific competences when studying Project Management (PM) subject. The framework of the experience combines (1) theoretical concepts, (2) the development of a real-case project carried out by multidisciplinary groups of three different universities, (3) the use of software web 2.0 tools and (4) group and individual assignments of students that play different roles (project managers and team members). Under this scenario, the study focuses on monitoring the communication competence in the ever growing PM virtual environment. Factors such as corporal language, technical means, stage, and PM specific vocabulary among others have been considered in order to assess the students’ performance on this issue. As a main contribution, the paper introduces an ad-hoc rubric that, based on previous investigations, has been adapted and tested for the first time to this new and specific context. Additionally, the research conducted has provided some interesting findings that suggest further actions to improve and better define future rubrics, oriented to communication or even other competences. As specific PM subject concerns, it has been detected that students playing the role of Project Managers strengthen their competences more than those ones that play the role of Team Members. It has also been detected that students have more difficulty assimilating concepts related to risk and quality management. However those concepts related with scope, time or cost areas of knowledge have been better assimilated by the students.
Resumo:
According to the PMBOK (Project Management Body of Knowledge), project management is “the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements” [1]. Project Management has proven to be one of the most important disciplines at the moment of determining the success of any project [2][3][4]. Given that many of the activities covered by this discipline can be said that are “horizontal” for any kind of domain, the importance of acknowledge the concepts and practices becomes even more obvious. The specific case of the projects that fall in the domain of Software Engineering are not the exception about the great influence of Project Management for their success. The critical role that this discipline plays in the industry has come to numbers. A report by McKinsey & Co [4] shows that the establishment of programs for the teaching of critical skills of project management can improve the performance of the project in time and costs. As an example of the above, the reports exposes: “One defense organization used these programs to train several waves of project managers and leaders who together administered a portfolio of more than 1,000 capital projects ranging in Project management size from $100,000 to $500 million. Managers who successfully completed the training were able to cut costs on most projects by between 20 and 35 percent. Over time, the organization expects savings of about 15 percent of its entire baseline spending”. In a white paper by the PMI (Project Management Institute) about the value of project management [5], it is stated that: “Leading organizations across sectors and geographic borders have been steadily embracing project management as a way to control spending and improve project results”. According to the research made by the PMI for the paper, after the economical crisis “Executives discovered that adhering to project management methods and strategies reduced risks, cut costs and improved success rates—all vital to surviving the economic crisis”. In every elite company, a proper execution of the project management discipline has become a must. Several members of the software industry have putted effort into achieving ways of assuring high quality results from projects; many standards, best practices, methodologies and other resources have been produced by experts from different fields of expertise. In the industry and the academic community, there is a continuous research on how to teach better software engineering together with project management [4][6]. For the general practices of Project Management the PMI produced a guide of the required knowledge that any project manager should have in their toolbox to lead any kind of project, this guide is called the PMBOK. On the side of best practices 10 and required knowledge for the Software Engineering discipline, the IEEE (Institute of Electrical and Electronics Engineers) developed the SWEBOK (Software Engineering Body of Knowledge) in collaboration with software industry experts and academic researchers, introducing into the guide many of the needed knowledge for a 5-year expertise software engineer [7]. The SWEBOK also covers management from the perspective of a software project. This thesis is developed to provide guidance to practitioners and members of the academic community about project management applied to software engineering. The way used in this thesis to get useful information for practitioners is to take an industry-approved guide for software engineering professionals such as the SWEBOK, and compare the content to what is found in the PMBOK. After comparing the contents of the SWEBOK and the PMBOK, what is found missing in the SWEBOK is used to give recommendations on how to enrich project management skills for a software engineering professional. Recommendations for members of the academic community on the other hand, are given taking into account the GSwE2009 (Graduated Software Engineering 2009) standard [8]. GSwE2009 is often used as a main reference for software engineering master programs [9]. The standard is mostly based on the content of the SWEBOK, plus some contents that are considered to reinforce the education of software engineering. Given the similarities between the SWEBOK and the GSwE2009, the results of comparing SWEBOK and PMBOK are also considered valid to enrich what the GSwE2009 proposes. So in the end the recommendations for practitioners end up being also useful for the academic community and their strategies to teach project management in the context of software engineering.
Resumo:
Este proyecto consiste en la construcción de un prototipo para la gestión de proyectos, destinada a usuarios del entorno profesional. La herramienta pretende servir de soporte a los equipos que realicen un proyecto dotando al usuario con la posibilidad de gestionar los tiempos del proyecto, gestión de requisitos, gestión de recursos, gestión de la documentación, etc. Adicionalmente, este trabajo llevará asociado un plan de negocio para poder estudiar la viabilidad del proyecto, en este plan de negocio se analizará; el entorno externo (competencia); análisis de las debilidades, fortalezas, amenazas y oportunidades; plan de marketing; plan económicofinanciero; análisis de riesgos del proyecto. A grandes rasgos, la herramienta desarrollada se compone de dos bases de datos (una relacional y otra no relacional), un conjunto de módulos que implementan la funcionalidad y una interfaz gráfica que proporciona a los usuarios una forma cómoda de interactuar con el sistema, principalmente ofrecerá las siguientes opciones: Gestión de proyectos Gestión de usuarios. Gestión de recursos Gestión de tiempos Cuadro de mando y notificaciones. ---ABSTRACT---This Project consist of the construction of a prototype for Project management, intended for users of the profesional environment. The software aims to support teams conducting a project by providing the user with the ability to manage time, requirements management, resource management, document management, etc. In addition, this work includes a business plan to study the viability of the project. This business plan addresses the following; analysis of the external enviroment; analysis of the strengths, weaknesses, opportunities and threats; marketing plan; economic and financial plan; analysis of project risks. In general terms, the developed tools are composed of two databases (relational and nonrelational), a set of modules that implement the functionality and a web interface that gives users a convenient way to interact with the system. The options that the system offers are: Project management User management Resource management Time management Dashboard and notifications
Resumo:
La gestión de las tecnologías de la información tiene cada vez más importancia dentro de un mundo totalmente digitalizado y donde la capacidad de respuesta al cambio puede marcar el devenir de una compañía, y resulta cada vez más evidente que los modelos de gestión tradicionales utilizados en la mayoría de las compañías no son capaces de dar respuesta por si solos a estas nuevas necesidades. Aun teniendo identificado este área de mejora, son muchas las empresas reacias a abordar estos cambios, principalmente por el cambio rupturista que significa a nivel interno. De cara a facilitar esta transformación, se propone en este documento un modelo de transición controlada donde las grandes compañías puedan incorporar nuevas alternativas y herramientas ágiles de forma paulatina y asegurando que el proceso de cambio es seguro y efectivo. Mediante una modificación del ciclo de vida de proyecto dentro de la compañía, se incorporan en las áreas, equipos o dominios de la empresa que se identifiquen los nuevos modelos de gestión ágil, permitiendo así una transición gradual y controlada, y pudiendo además analizar los detalles sobre todo en etapas tempranas de la transformación. Una vez seleccionada el área o dominio objeto de la transformación, se realiza un análisis a nivel de Portfolio de proyectos, identificando aquellos que cumplen una serie de condiciones que les permiten ser gestionados utilizando modelos de gestión ágil. Para ello, se plantea una matriz de decisión con las principales variables a tener en cuenta a la hora de tomar una decisión. Una vez seleccionado y consensuado con los interesados el modelo de gestión utilizando la matriz de decisión, se plantean una serie de herramientas y métricas asociadas para que la gestión ágil del proyecto dé una visibilidad completa y detallada del estado en cada momento, asegurando un correcto proceso de gestión de proyectos para proveer visibilidad regular del progreso, riesgos, planes de contingencia y problemas, con las alertas y escalaciones adecuadas. Además de proponerse una serie de herramientas y métricas para la gestión ágil del proyecto, se plantean las modificaciones necesarias sobre las tipologías habituales de contrato y se propone un nuevo modelo de contrato: el Contrato Agile. La principal diferencia entre este nuevo modelo de contrato y los habituales es que, al igual que las metodologías ágiles, es ejecutado en segmentos o iteraciones. En definitiva, el objetivo de este documento es proveer un mecanismo que facilite la inclusión de nuevos modelos ágiles de gestión en grandes organizaciones, llevando a cabo una transición controlada, con herramientas y métricas adaptadas para tener visibilidad completa sobre los proyectos en todo momento.---ABSTRACT---The information technology management is every time more important in a totally digitized world, where the capacity to response the change could mark the future of a company, and results every time more evident that the traditional management models used in the most of the companies are not able to respond by themselves to these new necessities. Even having identified this improvement area, many companies are reluctant to address these changes, mainly due to the disruptive change that it means internally in the companies. In order to facilitate this transformation, this document proposed a controlled transition model to help the big companies to incorporate new alternatives and agile tools gradually and ensuring that the change process is safe and effective. Through a modification the project life cycle inside the company, the new agile management models are incorporated in the selected areas, teams or domains, permitting a gradual and controlled transition, and enabling further analyze the details above all in the early phases of the transformation. Once is selected the area or domain object of the transformation, a portfolio level analysis is performed, identifying those projects that meet a some conditions that allow them to be managed using agile management models. For that, a decision matrix is proposed with the principal variables to have into account at the time of decision making. Once the management model is selected using the decision matrix and it is agreed with the different stakeholders, a group of tools and metrics associated with the agile management projects are proposed to provide a regular visibility of the project progress, risks, contingency plans and problems, with proper alerts and escalations. Besides the group of tools and metrics proposed for agile project management, the necessary modifications over the traditional contract models and a new contract model are proposed: the Agile Contract. The main difference between this new contract model and the traditional ones is that, as the agile methodologies, it is executed in segments or iterations. To sum up, the objective of this document is to provide a mechanism that facilitates the inclusion of new agile management models in big companies, with a controlled transition and proposing adapted tools and metrics to have a full visibility over the project in all the phases of the project life cycle.
Resumo:
Camera traps have become a widely used technique for conducting biological inventories, generating a large number of database records of great interest. The main aim of this paper is to describe a new free and open source software (FOSS), developed to facilitate the management of camera-trapped data which originated from a protected Mediterranean area (SE Spain). In the last decade, some other useful alternatives have been proposed, but ours focuses especially on a collaborative undertaking and on the importance of spatial information underpinning common camera trap studies. This FOSS application, namely, “Camera Trap Manager” (CTM), has been designed to expedite the processing of pictures on the .NET platform. CTM has a very intuitive user interface, automatic extraction of some image metadata (date, time, moon phase, location, temperature, atmospheric pressure, among others), analytical (Geographical Information Systems, statistics, charts, among others), and reporting capabilities (ESRI Shapefiles, Microsoft Excel Spreadsheets, PDF reports, among others). Using this application, we have achieved a very simple management, fast analysis, and a significant reduction of costs. While we were able to classify an average of 55 pictures per hour manually, CTM has made it possible to process over 1000 photographs per hour, consequently retrieving a greater amount of data.