860 resultados para power study


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Detecting change points in epidemic models has been studied by many scholars. Yao (1993) summarized five existing test statistics in the literature. Out of those test statistics, it was observed that the likelihood ratio statistic showed its standout power. However, all of the existing test statistics are based on an assumption that population variance is known, which is an unrealistic assumption in practice. To avoid assuming known population variance, a new test statistic for detecting epidemic models is studied in this thesis. The new test statistic is a parameter-free test statistic which is more powerful compared to the existing test statistics. Different sample sizes and lengths of epidemic durations are used for the power comparison purpose. Monte Carlo simulation is used to find the critical values of the new test statistic and to perform the power comparison. Based on the Monte Carlo simulation result, it can be concluded that the sample size and the length of the duration have some effect on the power of the tests. It can also be observed that the new test statistic studied in this thesis has higher power than the existing test statistics do in all of cases.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Notre progiciel PoweR vise à faciliter l'obtention ou la vérification des études empiriques de puissance pour les tests d'ajustement. En tant que tel, il peut être considéré comme un outil de calcul de recherche reproductible, car il devient très facile à reproduire (ou détecter les erreurs) des résultats de simulation déjà publiés dans la littérature. En utilisant notre progiciel, il devient facile de concevoir de nouvelles études de simulation. Les valeurs critiques et puissances de nombreuses statistiques de tests sous une grande variété de distributions alternatives sont obtenues très rapidement et avec précision en utilisant un C/C++ et R environnement. On peut même compter sur le progiciel snow de R pour le calcul parallèle, en utilisant un processeur multicœur. Les résultats peuvent être affichés en utilisant des tables latex ou des graphiques spécialisés, qui peuvent être incorporés directement dans vos publications. Ce document donne un aperçu des principaux objectifs et les principes de conception ainsi que les stratégies d'adaptation et d'extension.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Let (X, Y) be bivariate normal random vectors which represent the responses as a result of Treatment 1 and Treatment 2. The statistical inference about the bivariate normal distribution parameters involving missing data with both treatment samples is considered. Assuming the correlation coefficient ρ of the bivariate population is known, the MLE of population means and variance (ξ, η, and σ2) are obtained. Inferences about these parameters are presented. Procedures of constructing confidence interval for the difference of population means ξ – η and testing hypothesis about ξ – η are established. The performances of the new estimators and testing procedure are compared numerically with the method proposed in Looney and Jones (2003) on the basis of extensive Monte Carlo simulation. Simulation studies indicate that the testing power of the method proposed in this thesis study is higher.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Hierarchical clustering is a popular method for finding structure in multivariate data,resulting in a binary tree constructed on the particular objects of the study, usually samplingunits. The user faces the decision where to cut the binary tree in order to determine the numberof clusters to interpret and there are various ad hoc rules for arriving at a decision. A simplepermutation test is presented that diagnoses whether non-random levels of clustering are presentin the set of objects and, if so, indicates the specific level at which the tree can be cut. The test isvalidated against random matrices to verify the type I error probability and a power study isperformed on data sets with known clusteredness to study the type II error.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

El origen del proyecto se encuentra en la mejora de un inversor trifásico sinusoidal comercial sobre la base del estudio de las técnicas de excitación óptimas para los IGBTs que lo componen en su etapa de potencia. En las primeras fases de planteamiento del proyecto se propone una idea mucho más ambiciosa, la realización de un nuevo convertidor de emergencia, destinado al sector ferroviario, para dar servicio de climatización. Este convertidor está formado por la asociación en cascada de un bloque DC/DC elevador y un bloque inversor DC/AC trifásico controlado mediante PWM con modulación sinusoidal. Se pretendía así dar solución a las siguientes problemáticas detectadas en los convertidores comercializados hasta el momento: un bloque elevador excesivamente sobredimensionado, subsistemas de control independientes para los dos bloques que configuran el convertidor, adicionalmente, la tarjeta driver se rediseña con cada cambio de especificaciones por parte de un nuevo cliente y finalmente, las comunicaciones tanto de diagnosis como de mantenimiento necesitaban una importante actualización. Inicialmente, se ha realizado un estudio teórico de los bloques elevador e inversor para poder realizar el diseño y dimensionamiento de sus componentes tanto semiconductores como electromagnéticos. Una vez completada la parte de potencia, se estudia el control que se realiza mediante medidas directas y simulación tanto de la estrategia de control del elevador como del inversor. Así se obtiene una información completa de la funcionalidad de las tarjetas existentes. Se desea realizar el diseño de una única tarjeta controladora y una única tarjeta de drivers para ambos bloques. Por problemas ajenos, en el transcurso de este proyecto se cancela su realización comercial, con lo que se decide al menos crear la placa de control y poder gobernar un convertidor ya existente, sustituyendo la tarjeta de control del bloque elevador. Para poder fabricar la placa de control se divide en dos tarjetas que irán conectadas en modo sándwich. En una tarjeta está el microcontrolador y en otra está todo el interface necesario para operar con el sistema: entradas y salidas digitales, entradas y salidas analógicas, comunicación CAN, y un pequeño DC/DC comercial que proporciona alimentación al prototipo. Se realiza un pequeño programa funcional para poder manejar el convertidor, el cual con una tensión de 110V DC, proporciona a la salida una tensión de 380V AC. Como ya se ha expuesto, debido a la cancelación del proyecto industrial no se profundiza más en su mejora y se decide proponerlo para su evaluación en su fase actual. ABSTRACT. The beginning of the project is found in the improvement of a commercial sine wave three phase inverter which is based in a study about optimal excitation techniques to IGBTs which compose in the power stage. In the early phases of project it is proposed a much more ambitious idea, the fact of a new emergency converter, proposed for the rail sector to work in an air condition unit. This converter is formed by an association of a block cascaded DC/DC booster and a block DC/AC inverter three-phase controlled by a sine wave modulation PWM. The purposed was to give a solution to following problems detected in commercial converters nowadays: an excessively oversized block boost, independent control subsystems for two blocks that configure the converter. In addition, driver board is redesigned with each specifications change demand it a new customer, and finally, the communications, diagnostic and maintenance that needed a important upgrade. Initially, it has been performed a theoretical study of boost and the inverter blocks to be able to perform the component’s design and the size (semiconductor and electromagnetic fields). Once finished power study, it is analysed the control performed using direct measures and simulation of boost control strategy and inverter. With this it is obtained complete information about existing cards functionality. The project is looking for the design of just one controller card and one drivers´ card for both blocks. By unrelated problems, during the course of this project a commercial realization. So at least its decided to create control board to be able to existing converter, replacing boost block’s control board. To be able to manufacture control board it is divided in two cards connected in sandwiching mode. In a card is microcontroller and in another is all needed interface to operate with the system: digital inputs and outputs, analogical inputs and outputs, CAN communication, and a small DC / DC business that provide power supply to the prototype. It is performed a small functional program to handle the converter, which with an input voltage 110V DC provides an output voltage 380V AC. As already has been exposed, due to industrial project cancellation it is decided no to continue with all improvements and directly to evaluate it in the current phase.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This work presents a case study on technology assessment for power quality improvement devices. A system compatibility test protocol for power quality mitigation devices was developed in order to evaluate the functionality of three-phase voltage restoration devices. In order to validate this test protocol, the micro-DVR, a reduced power development platform for DVR (dynamic voltage restorer) devices, was tested and the results are discussed based on voltage disturbances standards. (C) 2011 Elsevier B.V. All rights reserved.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Power converters play a vital role in the integration of wind power into the electrical grid. Variable-speed wind turbine generator systems have a considerable interest of application for grid connection at constant frequency. In this paper, comprehensive simulation studies are carried out with three power converter topologies: matrix, two-level and multilevel. A fractional-order control strategy is studied for the variable-speed operation of wind turbine generator systems. The studies are in order to compare power converter topologies and control strategies. The studies reveal that the multilevel converter and the proposed fractional-order control strategy enable an improvement in the power quality, in comparison with the other power converters using a classical integer-order control strategy. (C) 2010 Elsevier Ltd. All rights reserved.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper we present VERITAS, a tool that focus time maintenance, that is one of the most important processes in the engineering of the time during the development of KBS. The verification and validation (V&V) process is part of a wider process denominated knowledge maintenance, in which an enterprise systematically gathers, organizes, shares, and analyzes knowledge to accomplish its goals and mission. The V&V process states if the software requirements specifications have been correctly and completely fulfilled. The methodologies proposed in software engineering have showed to be inadequate for Knowledge Based Systems (KBS) validation and verification, since KBS present some particular characteristics. VERITAS is an automatic tool developed for KBS verification which is able to detect a large number of knowledge anomalies. It addresses many relevant aspects considered in real applications, like the usage of rule triggering selection mechanisms and temporal reasoning.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Important research effort has been devoted to the topic of optimal planning of distribution systems. The non linear nature of the system, the need to consider a large number of scenarios and the increasing necessity to deal with uncertainties make optimal planning in distribution systems a difficult task. Heuristic techniques approaches have been proposed to deal with these issues, overcoming some of the inherent difficulties of classic methodologies. This paper considers several methodologies used to address planning problems of electrical power distribution networks, namely mixedinteger linear programming (MILP), ant colony algorithms (AC), genetic algorithms (GA), tabu search (TS), branch exchange (BE), simulated annealing (SA) and the Bender´s decomposition deterministic non-linear optimization technique (BD). Adequacy of theses techniques to deal with uncertainties is discussed. The behaviour of each optimization technique is compared from the point of view of the obtained solution and of the methodology performance. The paper presents results of the application of these optimization techniques to a real case of a 10-kV electrical distribution system with 201 nodes that feeds an urban area.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Thesis submitted to obtain the Doctoral degree in Energy and Bioenergy

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The recent proposals presented by EPA aimed to reduce the dependency of fossil fuels and to lower current emissions levels, hoping to gradually shift electric generation units to renewable energy sources. Actually, the Final Rule Proposal announcement day exhibited a negative Abnormal Return on Fossil Fuels but the following days had positive Abnormal Returns, mostly due to legislative change perceived by financial markets which eased up implementation periods of the proposed measures in the Final Rule when compared to the Draft Rule. Oppositely, Renewables and Solar Portfolios exhibited negative Cumulative Abnormal Returns over the period surrounding the Final Rule.