978 resultados para maintenance cost
Resumo:
Dissertação apresentada como requisito parcial para obtenção do grau de Mestre em Estatística e Gestão de Informação.
Resumo:
This paper deals with the problem of estimation maintenance costs for the case of the pitch controls system of wind farms turbines. Previous investigations have estimated these costs as (traditional) “crisp” values, simply ignoring the uncertainty nature of data and information available. This paper purposes an extended version of the estimation model by making use of the Fuzzy Set Theory. The results alert decision-makers to consequent uncertainty of the estimations along with their overall level, thus improving the information given to the mainte-nance support system.
Resumo:
Remote monitoring through the use of cameras is widely utilized for traffic operation, but has not been utilized widely for roadway maintenance operations. The Utah Department of Transportation (UDOT) has implemented a new remote monitoring system, referred to as a Cloud-enabled Remote Video Streaming (CRVS) camera system for snow removal-related maintenance operations in the winter. The purpose of this study was to evaluate the effectiveness of the use of the CRVS camera system in snow removal-related maintenance operations. This study was conducted in two parts: opinion surveys of maintenance station supervisors and an analysis on snow removal-related maintenance costs. The responses to the opinion surveys mostly displayed positive reviews of the use of the CRVS cameras. On a scale of 1 (least effective) to 5 (most effective), the average overall effectiveness given by the station supervisors was 4.3. An expedition trip for this study was defined as a trip that was made to just check the roadways if snow-removal was necessary. The average of the responses received from surveys was calculated to be a 33 percent reduction in expedition trips. For the second part of this study, an analysis was performed on the snow removal-related maintenance cost data provided by UDOT to see if the installation of a CRVS camera had an effect in reducing expedition trips. This expedition cost comparison was performed for 10 sets of maintenance stations within Utah. It was difficult to make any definitive inferences from the comparison of expedition costs over the years for which precipitation and expedition cost data were available; hence a statistical analysis was performed using the Mixed Model ANOVA. This analysis resulted in an average of 14 percent higher ratio of expedition costs at maintenance stations with a CRVS camera before the installation of the camera compared to the ratio of expedition costs after the installation of the camera. This difference was not proven to be statistically significant at the 95 percent confident level, but indicated that the installation of CRVS cameras was on the average helpful in reducing expedition costs and may be considered practically significant. It is recommended that more detailed and consistent maintenance cost records be prepared for accurate analysis of cost records for this type of study in the future.
Resumo:
The paper presents the techno-economic modelling of CO2 capture process in coal-fired power plants. An overall model is being developed to compare carbon capture and sequestration options at locations within the UK, and for studies of the sensitivity of the cost of disposal to changes in the major parameters of the most promising solutions identified. Technological options of CO2 capture have been studied and cost estimation relationships (CERs) for the chosen options calculated. Created models are related to the capital, operation and maintenance cost. A total annualised cost of plant electricity output and amount of CO2 avoided have been developed. The influence of interest rates and plant life has been analysed as well. The CERs are included as an integral part of the overall model.
Resumo:
Dynamic measurements will become a standard for bridge monitoring in the near future. This fact will produce an important cost reduction for maintenance. US Administration has a long term intensive research program in order to diminish the estimated current maintenance cost of US$7 billion per year over 20 years. An optimal intervention maintenance program demands a historical dynamical record, as well as an updated mathematical model of the structure to be monitored. In case that a model of the structure is not actually available it is possible to produce it, however this possibility does not exist for missing measurement records from the past. Current acquisition systems to monitor structures can be made more efficient by introducing the following improvements, under development in the Spanish research Project “Low cost bridge health monitoring by ambient vibration tests using wireless sensors”: (a) a complete wireless system to acquire sensor data, (b) a wireless system that permits the localization and the hardware identification of the whole sensor system. The applied localization system has been object of a recent patent, and (c) automatization of the modal identification process, aimed to diminish human intervention. This system is assembled with cheap components and allows the simultaneous use of a large number of sensors at a low placement cost. The engineer’s intervention is limited to the selection of sensor positions, probably based on a preliminary FE analysis. In case of multiple setups, also the position of a number of fixed reference sensors has to be decided. The wireless localization system will obtain the exact coordinates of all these sensors positions. When the selection of optimal positions is difficult, for example because of the lack of a proper FE model, this can be compensated by using a higher number of measuring (also reference) points. The described low cost acquisition system allows the responsible bridge administration to obtain historical dynamic identification records at reasonable costs that will be used in future maintenance programs. Therefore, due to the importance of the baseline monitoring record of a new bridge, a monitoring test just after its construction should be highly recommended, if not compulsory.
Resumo:
Con 1.300 millones de personas en el mundo sin acceso a la electricidad (la mayoría en entornos rurales de países empobrecidos), la energía solar fotovoltaica constituye una solución viable técnica y económicamente para electrificar las zonas más remotas del planeta donde las redes eléctricas convencionales no llegan. Casi todos los países en el mundo han desarrollado algún tipo de programa de electrificación fotovoltaica rural durante los últimos 40 años, principalmente los países más pobres, donde a través de diferentes modelos de financiación, se han instalado millones de sistemas solares domiciliarios (pequeños sistemas fotovoltaicos para uso doméstico). Durante este largo período, se han ido superando muchas barreras, como la mejora de la calidad de los sistemas fotovoltaicos, la reducción de costes, la optimización del diseño y del dimensionado de los sistemas, la disponibilidad financiera para implantar programas de electrificación rural, etc. Gracias a esto, la electrificación rural descentralizada ha experimentado recientemente un salto de escala caracterizada por la implantación de grandes programas con miles de sistemas solares domiciliarios e integrando largos períodos de mantenimiento. Muchos de estos grandes programas se están llevando a cabo con limitado éxito, ya que generalmente parten de supuestos e hipótesis poco contrastadas con la realidad, comprometiendo así un retorno económico que permita el desarrollo de esta actividad a largo plazo. En este escenario surge un nuevo reto: el de cómo garantizar la sostenibilidad de los grandes programas de electrificación rural fotovoltaica. Se argumenta que la principal causa de esta falta de rentabilidad es el imprevisto alto coste de la fase de operación y mantenimiento. Cuestiones clave tales como la estructura de costes de operación y mantenimiento o la fiabilidad de los componentes del sistema fotovoltaico no están bien caracterizados hoy en día. Esta situación limita la capacidad de diseñar estructuras de mantenimiento capaces de asegurar la sostenibilidad y la rentabilidad del servicio de operación y mantenimiento en estos programas. Esta tesis doctoral tiene como objetivo responder a estas cuestiones. Se ha realizado varios estudios sobre la base de un gran programa de electrificación rural fotovoltaica real llevado a cabo en Marruecos con más de 13.000 sistemas solares domiciliarios instalados. Sobre la base de este programa se ha hecho una evaluación en profundidad de la fiabilidad de los sistemas solares a partir de los datos de mantenimiento recogidos durante 5 años con más de 80.000 inputs. Los resultados han permitido establecer las funciones de fiabilidad de los equipos tal y como se comportan en condiciones reales de operación, las tasas de fallos y los tiempos medios hasta el fallo para los principales componentes del sistema, siendo este el primer caso de divulgación de resultados de este tipo en el campo de la electrificación rural fotovoltaica. Los dos principales componentes del sistema solar domiciliario, la batería y el módulo fotovoltaico, han sido analizados en campo a través de una muestra de 41 sistemas trabajando en condiciones reales pertenecientes al programa solar marroquí. Por un lado se ha estudiado la degradación de la capacidad de las baterías y por otro la degradación de potencia de los módulos fotovoltaicos. En el caso de las baterías, los resultados nos han permitido caracterizar la curva de degradación en capacidad llegando a obtener una propuesta de nueva definición del umbral de vida útil de las baterías en electrificación rural. También sobre la base del programa solar de Marruecos se ha llevado a cabo un estudio de caracterización de los costes reales de operación y mantenimiento a partir de la base de datos de contabilidad del programa registrados durante 5 años. Los resultados del estudio han permitido definir cuáles son costes que más incidencia tienen en el coste global. Se han obtenido los costes unitarios por sistema instalado y se han calculado los montantes de las cuotas de mantenimiento de los usuarios para garantizar la rentabilidad de la operación y mantenimiento. Finalmente, se propone un modelo de optimización matemática para diseñar estructuras de mantenimiento basado en los resultados de los estudios anteriores. La herramienta, elaborada mediante programación lineal entera mixta, se ha aplicado al programa marroquí con el fin de validar el modelo propuesto. ABSTRACT With 1,300 million people worldwide deprived of access to electricity (mostly in rural environments), photovoltaic solar energy has proven to be a cost‐effective solution and the only hope for electrifying the most remote inhabitants of the planet, where conventional electric grids do not reach because they are unaffordable. Almost all countries in the world have had some kind of rural photovoltaic electrification programme during the past 40 years, mainly the poorer countries, where through different organizational models, millions of solar home systems (small photovoltaic systems for domestic use) have been installed. During this long period, many barriers have been overcome, such as quality enhancement, cost reduction, the optimization of designing and sizing, financial availability, etc. Thanks to this, decentralized rural electrification has recently experienced a change of scale characterized by new programmes with thousands of solar home systems and long maintenance periods. Many of these large programmes are being developed with limited success, as they have generally been based on assumptions that do not correspond to reality, compromising the economic return that allows long term activity. In this scenario a new challenge emerges, which approaches the sustainability of large programmes. It is argued that the main cause of unprofitability is the unexpected high cost of the operation and maintenance of the solar systems. In fact, the lack of a paradigm in decentralized rural services has led to many private companies to carry out decentralized electrification programmes blindly. Issues such as the operation and maintenance cost structure or the reliability of the solar home system components have still not been characterized. This situation does not allow optimized maintenance structure to be designed to assure the sustainability and profitability of the operation and maintenance service. This PhD thesis aims to respond to these needs. Several studies have been carried out based on a real and large photovoltaic rural electrification programme carried out in Morocco with more than 13,000 solar home systems. An in‐depth reliability assessment has been made from a 5‐year maintenance database with more than 80,000 maintenance inputs. The results have allowed us to establish the real reliability functions, the failure rate and the main time to failure of the main components of the system, reporting these findings for the first time in the field of rural electrification. Both in‐field experiments on the capacity degradation of batteries and power degradation of photovoltaic modules have been carried out. During the experiments both samples of batteries and modules were operating under real conditions integrated into the solar home systems of the Moroccan programme. In the case of the batteries, the results have enabled us to obtain a proposal of definition of death of batteries in rural electrification. A cost assessment of the Moroccan experience based on a 5‐year accounting database has been carried out to characterize the cost structure of the programme. The results have allowed the major costs of the photovoltaic electrification to be defined. The overall cost ratio per installed system has been calculated together with the necessary fees that users would have to pay to make the operation and maintenance affordable. Finally, a mathematical optimization model has been proposed to design maintenance structures based on the previous study results. The tool has been applied to the Moroccan programme with the aim of validating the model.
Resumo:
Performance-based maintenance contracts differ significantly from material and method-based contracts that have been traditionally used to maintain roads. Road agencies around the world have moved towards a performance-based contract approach because it offers several advantages like cost saving, better budgeting certainty, better customer satisfaction with better road services and conditions. Payments for the maintenance of road are explicitly linked to the contractor successfully meeting certain clearly defined minimum performance indicators in these contracts. Quantitative evaluation of the cost of performance-based contracts has several difficulties due to the complexity of the pavement deterioration process. Based on a probabilistic analysis of failures of achieving multiple performance criteria over the length of the contract period, an effort has been made to develop a model that is capable of estimating the cost of these performance-based contracts. One of the essential functions of such model is to predict performance of the pavement as accurately as possible. Prediction of future degradation of pavement is done using Markov Chain Process, which requires estimating transition probabilities from previous deterioration rate for similar pavements. Transition probabilities were derived using historical pavement condition rating data, both for predicting pavement deterioration when there is no maintenance, and for predicting pavement improvement when maintenance activities are performed. A methodological framework has been developed to estimate the cost of maintaining road based on multiple performance criteria such as crack, rut and, roughness. The application of the developed model has been demonstrated via a real case study of Miami Dade Expressways (MDX) using pavement condition rating data from Florida Department of Transportation (FDOT) for a typical performance-based asphalt pavement maintenance contract. Results indicated that the pavement performance model developed could predict the pavement deterioration quite accurately. Sensitivity analysis performed shows that the model is very responsive to even slight changes in pavement deterioration rate and performance constraints. It is expected that the use of this model will assist the highway agencies and contractors in arriving at a fair contract value for executing long term performance-based pavement maintenance works.
Resumo:
Power distribution systems are susceptible to extreme damage from natural hazards especially hurricanes. Hurricane winds can knock down distribution poles thereby causing damage to the system and power outages which can result in millions of dollars in lost revenue and restoration costs. Timber has been the dominant material used to support overhead lines in distribution systems. Recently however, utility companies have been searching for a cost-effective alternative to timber poles due to environmental concerns, durability, high cost of maintenance and need for improved aesthetics. Steel has emerged as a viable alternative to timber due to its advantages such as relatively lower maintenance cost, light weight, consistent performance, and invulnerability to wood-pecker attacks. Both timber and steel poles are prone to deterioration over time due to decay in the timber and corrosion of the steel. This research proposes a framework for conducting fragility analysis of timber and steel poles subjected to hurricane winds considering deterioration of the poles over time. Monte Carlo simulation was used to develop the fragility curves considering uncertainties in strength, geometry and wind loads. A framework for life-cycle cost analysis is also proposed to compare the steel and timber poles. The results show that steel poles can have superior reliability and lower life-cycle cost compared to timber poles, which makes them suitable substitutes.
Resumo:
With the advent of object-oriented languages and the portability of Java, the development and use of class libraries has become widespread. Effective class reuse depends on class reliability which in turn depends on thorough testing. This paper describes a class testing approach based on modeling each test case with a tuple and then generating large numbers of tuples to thoroughly cover an input space with many interesting combinations of values. The testing approach is supported by the Roast framework for the testing of Java classes. Roast provides automated tuple generation based on boundary values, unit operations that support driver standardization, and test case templates used for code generation. Roast produces thorough, compact test drivers with low development and maintenance cost. The framework and tool support are illustrated on a number of non-trivial classes, including a graphical user interface policy manager. Quantitative results are presented to substantiate the practicality and effectiveness of the approach. Copyright (C) 2002 John Wiley Sons, Ltd.
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para a obtenção do Grau de Mestre em Engenharia Informática.
Resumo:
Structural health monitoring has long been identified as a prominent application of Wireless Sensor Networks (WSNs), as traditional wired-based solutions present some inherent limitations such as installation/maintenance cost, scalability and visual impact. Nevertheless, there is a lack of ready-to-use and off-the-shelf WSN technologies that are able to fulfill some most demanding requirements of these applications, which can span from critical physical infrastructures (e.g. bridges, tunnels, mines, energy grid) to historical buildings or even industrial machinery and vehicles. Low-power and low-cost yet extremely sensitive and accurate accelerometer and signal acquisition hardware and stringent time synchronization of all sensors data are just examples of the requirements imposed by most of these applications. This paper presents a prototype system for health monitoring of civil engineering structures that has been jointly conceived by a team of civil, and electrical and computer engineers. It merges the benefits of standard and off-the-shelf (COTS) hardware and communication technologies with a minimum set of custom-designed signal acquisition hardware that is mandatory to fulfill all application requirements.
Resumo:
No Estádio do Dragão existem doze juntas de dilatação localizadas simetricamente, que separam o estádio em doze corpos independentes, com o objetivo de minimizar a fendilhação provocada pelas movimentações da estrutura resultantes da solicitação de ações diretas e, principalmente, indiretas nessa mesma estrutura. Neste relatório explicar-se-á a importância, causas e objetivos que levam à necessidade de utilização destas juntas de dilatação em geral nas edificações, e no caso particular do estádio referido. Este elemento estrutural é considerado pela empresa responsável pela manutenção do Estádio do Dragão como a causa de um dos principais problemas recorrentes no estádio que necessitam de uma exigente atenção. Esta consideração deve-se ao fato das intervenções nas juntas de dilatação terem um custo de manutenção bastante oneroso e também pelo frequente aparecimento de novas patologias associadas a este elemento, tais como infiltrações de água, que necessitam de uma reparação urgente. Portanto, no sentido de resolver estas patologias decorrentes do mau funcionamento dos sistemas de juntas existentes no Estádio do Dragão, foi proposto pela PortoEstádio a elaboração de procedimentos de um plano de manutenção das juntas de dilatação que permitisse planear as intervenções e mitigar o aparecimento dessas patologias, com o objetivo principal de minimizar os custos inerentes à manutenção das juntas de dilatação. Estes procedimentos solicitados e demais elementos complementares são apresentados no presente trabalho, com a classificação dos sistemas de juntas do Estádio do Dragão, identificação das principais patologias nos diversos sistemas de juntas, escolha de novos sistemas para substituição dos existentes no estádio e finalmente, a criação de uma calendarização de intervenções nas juntas para a implementação de um plano de manutenção preventiva neste elemento de grande importância estrutural.
Resumo:
The Quadrennial Needs Study was developed to assist in the identification of highway needs and the distribution of road funds in Iowa among the various highway entities. During the period 1978 to 1990, the process has seen large shifts in needs and associated funding distribution in individual counties with no apparent reasons. This study investigated the reasons for such shifts. The study identified program inputs that can result in major shifts in needs either up or down from minor changes in the input values. The areas of concern were identified as the condition ratings for roads and structures, traffic volume and mix counts, and the assignment of construction cost areas. Eight counties exhibiting the large shifts (greater than 30%) in needs over time were used to test the sensitivity of the variables. A ninth county was used as the base line for the study. Recommendations are identified for improvements in the process of data collection in the areas of road and structure condition--rating, traffic, and in the assignment of construction cost areas. Advice is also offered in how to account for changes in jurisdiction between successive studies. Maintenance cost area assignment and levels of maintenance service are identified as requiring additional detailed research.
Resumo:
This business plan describes the methods by which the Iowa Department of Transportation (DOT) will partner with Iowa counties and cities to fund Iowa’s share of the operating and maintenance cost for the Chicago- Iowa City passenger-rail service, an average of $3 million per year.
Resumo:
The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in bridge engineering, with the objective of producing safer bridges that have a minimum service life of 75 years and reduced maintenance cost. Material deterioration was identified as one of the primary challenges to achieving the objective of extended life. In substructural applications (e.g., deep foundations), construction materials such as timber, steel, and concrete are subjected to deterioration due to environmental impacts. Using innovative and new materials for foundation applications makes the AASHTO objective of 75 years service life achievable. Ultra High Performance Concrete (UHPC) with compressive strength of 180 MPa (26,000 psi) and excellent durability has been used in superstructure applications but not in geotechnical and foundation applications. This study explores the use of precast, prestressed UHPC piles in future foundations of bridges and other structures. An H-shaped UHPC section, which is 10-in. (250-mm) deep with weight similar to that of an HP10×57 steel pile, was designed to improve constructability and reduce cost. In this project, instrumented UHPC piles were cast and laboratory and field tests were conducted. Laboratory tests were used to verify the moment-curvature response of UHPC pile section. In the field, two UHPC piles have been successfully driven in glacial till clay soil and load tested under vertical and lateral loads. This report provides a complete set of results for the field investigation conducted on UHPC H-shaped piles. Test results, durability, drivability, and other material advantages over normal concrete and steel indicate that UHPC piles are a viable alternative to achieve the goals of AASHTO strategic plan.