836 resultados para local planning processes
Resumo:
In order to meet the land use and infrastructure needs of the community with the additional challenges posed by climate change and a global recession, it is essential that Queensland local governments test their proposed integrated land use and infrastructure plans to ensure the maximum achievement of triple-bottom line sus-tainability goals. Extensive regulatory impact assessment systems are in place at the Australian and state government levels to substantiate and test policy and legislative proposals, however no such requirement has been extended to the local government level. This paper contends that with the devolution of responsibility to local government and growing impacts of local government planning and development assessment activities, impact assessment of regulatory planning instruments is appropriate and overdue. This is particularly so in the Queensland context where local governments manage metropolitan and regional scale responsibilities and their planning schemes under the Sustainable Planning Act 2009 integrate land use and infrastructure planning to direct development rights, the spatial allocation of land, and infrastructure investment. It is critical that urban planners have access to fit-for-purpose impact assessment frameworks which support this challenging task and address the important relationship between local planning and sustainable urban development. This paper uses two examples of sustainability impact assessment and a case study from the Queensland local urban planning context to build an argument and potential starting point for impact assessment in local planning processes.
Resumo:
Environmental policy and decision-making are characterized by complex interactions between different actors and sectors. As a rule, a stakeholder analysis is performed to understand those involved, but it has been criticized for lacking quality and consistency. This lack is remedied here by a formal social network analysis that investigates collaborative and multi-level governance settings in a rigorous way. We examine the added value of combining both elements. Our case study examines infrastructure planning in the Swiss water sector. Water supply and wastewater infrastructures are planned far into the future, usually on the basis of projections of past boundary conditions. They affect many actors, including the population, and are expensive. In view of increasing future dynamics and climate change, a more participatory and long-term planning approach is required. Our specific aims are to investigate fragmentation in water infrastructure planning, to understand how actors from different decision levels and sectors are represented, and which interests they follow. We conducted 27 semi-structured interviews with local stakeholders, but also cantonal and national actors. The network analysis confirmed our hypothesis of strong fragmentation: we found little collaboration between the water supply and wastewater sector (confirming horizontal fragmentation), and few ties between local, cantonal, and national actors (confirming vertical fragmentation). Infrastructure planning is clearly dominated by engineers and local authorities. Little importance is placed on longer-term strategic objectives and integrated catchment planning, but this was perceived as more important in a second analysis going beyond typical questions of stakeholder analysis. We conclude that linking a stakeholder analysis, comprising rarely asked questions, with a rigorous social network analysis is very fruitful and generates complementary results. This combination gave us deeper insight into the socio-political-engineering world of water infrastructure planning that is of vital importance to our well-being.
Resumo:
Competitive markets are increasingly driving new initiatives for shorter cycle times resulting in increased overlapping of project phases. This, in turn, necessitates improving the interfaces between the different phases to be overlapped (integrated), thus allowing transfer of processes, information and knowledge from one individual or team to another. This transfer between phases, within and between projects, is one of the basic challenges to the philosophy of project management. To make the process transfer more transparent with minimal loss of momentum and project knowledge, this paper draws upon Total Quality Management (TQM) and Business Process Re-engineering (BPR) philosophies to develop a Best Practice Model for managing project phase integration. The paper presents the rationale behind the model development and outlines its two key parts; (1) Strategic Framework and (2) Implementation Plan. Key components of both the Strategic Framework and the Implementation Plan are presented and discussed.
Resumo:
The development planning process under Law No. 25/2004 is said to be a new approach to increase public participation in decentralised Indonesia. This Law has introduced planning mechanisms, called Musyawarah Perencanaan Pembangunan (Musrenbang), to provide a forum for development planning. In spite of the expressed intention of these mechanisms to improve public participation, some empirical observations have cast doubt on the outcomes. As a result, some local governments have tried to provide alternative mechanisms to promote for participation in local development planning. Since planning is often said to be one of the most effective ways to improve community empowerment, it is of particular concern, to examine the extent to which the current local development planning processes in Indonesia provide sufficient opportunities to improve the self organising capabilities of communities to sustain development programs to meet local needs. With this objective in mind, this paper examines problems encountered by the new local planning mechanism (Musrenbang) in increasing local community empowerment particularly regarding their self organising capabilities. The concept of community empowerment as a pathway to social justice is explored to identify its key elements and approaches and to show how they can be incorporated within planning processes. Having discussed this, it is then argued that to change current unfavorable outcomes, procedural justice and social learning approaches need to be adopted as pathways to community empowerment. Lastly it is also suggested that an alternative local planning process, called Sistem Dukungan (SISDUK), introduced in South Suluwezi in collaboration with JAICA in 2006 (?) offers scope to incorporate such procedural justice and social learning approaches to improve the self organizing capabilities of local communities.
Resumo:
This study investigates the role of development planning in empowering rural communities in Indonesia’s decentralised era. Evidence is produced that the combination of procedural justice in planning development and social learning in its implementation can assist self-organisation and help empower local communities. Significant benefits are shown to result in: the acquisition and use of collective resources; the development of shared knowledge, skills, values and trust; community leadership; and the development of social networks. Two features of this empowerment model are community-based planning, utilising participatory rural appraisal at the level of the natural village, and the organisation of collective action. These are shown to be effective ways of incorporating procedural justice and social learning in self organisation and community empowerment.
Resumo:
The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.
Resumo:
Case study on the Heart of Worcestershire College and how they are meeting the FELTAG recommendation of achieving a 10% wholly online component of all programmes from September 2015
Resumo:
EXTRACT (SEE PDF FOR FULL ABSTRACT): The suppression of primary productivity observed in eastern boundary ecosystems of the Pacific during El Nino episodes does not occur throughout the Gulf of California. On the contrary, analysis of the modern siliceous phytoplankton record from annually layered sediments and compilation of available primary productivity measurements indicate that production is significantly increased in the central Gulf during El Nino years compared to anti-El Nino years. Integrated observations of biological and physical variability during the spring of 1983, under the influence of the strong El Nino, show that very high primary productivity occurred along the eastern margin of the central Gulf. This resulted from the upwelling of a nutrient rich source provided by the locally formed Gulf water mass originating in the northern Gulf. Lower productivity and phytoplankton biomass were associated with the anomalous penetration of Tropical Surface Water along the western side of the Gulf.
Resumo:
Peer reviewed
Resumo:
"National resources planning board publications": p. 150-151.
Resumo:
Cover title.