923 resultados para integrated management system


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project analyzes the challenges, issues, benefits, and lessons learned that several companies experienced while implementing integrated management systems. Based on previous experiences, this paper defines several strategies that an organization should use to increase the probability of implementing an integrated management system (IMS) successfully. Strategies include completing a feasibility analysis, creating a policy, allocating resources, developing objectives, modifying documentation, and creating a continuous monitoring process. Moreover, an organization can reduce potential obstacles by promoting a culture that encourages management commitment and employee participation. Results indicate the implementation of an IMS provides the framework to manage environmental, health, and safety programs effectively. By implementing an IMS, an organization can save time and money, as well as proactively control risk.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Master’s thesis examines the implementation of management system standard requirements as integrated in the organization. The aim is to determine how requirements from management system standards ISO 14001:2015 and ISO 9001:2015 can be integrated and implemented into the existing ISO 9001:2008 compliant management system. Research was executed as action research by utilizing an operating model about the integrated use of management system standards created by the International Organization for Standardization. Phases of the operating model were applied to the target organization. The similarity and integration potential of relevant standards were assessed by using comparative matrices. Allocation of the requirements and conformity assessment of the processes was executed by gap analysis. The main results indicate that the requirements of the relevant standards are principally equivalent or have the same kind of purpose. The results also show the most important processes of the target organization in terms of requirement compliance, as well as the requirements which affect the process the most. Prioritizing the compliance achievement of the most important processes and implementation of those requirements that have the most effect create an opportunity for organizations to implement the integrated requirements effectively.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Management systems standards (MSSs) have developed in an unprecedented manner in the last few years. These MSS cover a wide array of different disciplines, aims and activities of organisations. Also, organisations are populated with an enormous diversity of independent management systems (MSs). An integrated management system (IMS) tends to integrate some or all components of the business. Maximising their integration in one coherent and efficient MS is increasingly a strategic priority and constitutes an opportunity for businesses to be more competitive and consequently, promote its sustainable success. Those organisations that are quicker and more efficient in their integration and continuous improvement will have a competitive advantage in obtaining sustainable value in our global and competitive business world. Several scholars have proposed various theoretical approaches regarding the integration of management sub-systems, leading to the conclusion that there is no common practice for all organisations as they encompass different characteristics. One other author shows that several tangible and intangible gains for organisations, as well as to their internal and external stakeholders, are achieved with the integration of the individual standardised MSs. The purpose of this work was to conceive a model, Flexible, Integrator and Lean for IMSs, according to ISO 9001 for quality; ISO 14001 for environment and OHSAS 18001 for occupational health and safety (IMS–QES), that can be adapted and progressively assimilate other MSs, such as, SA 8000/ISO 26000 for social accountability, ISO 31000 for risk management and ISO/IEC 27001 for information security management, among others. The IMS–QES model was designed in the real environment of an industrial Portuguese small and medium enterprise, that over the years has been adopting, gradually, in whole or in part, individual MSSs. The developed model is based on a preliminary investigation conducted through a questionnaire. The strategy and research methods have taken into consideration the case study. Among the main findings of the survey we highlight: the creation of added value for the business through the elimination of several organisational wastes; the integrated management of the sustainability components; the elimination of conflicts between independent MS; dialogue with the main stakeholders and commitment to their ongoing satisfaction and increased contribution to the company’s competitiveness; and greater valorisation and motivation of employees as a result of the expansion of their skill base, actions and responsibilities, with their consequent empowerment. A set of key performance indicators (KPIs) constitute the support, in a perspective of business excellence, to the follow up of the organisation’s progress towards the vision and achievement of the defined objectives in the context of each component of the IMS model. The conceived model had many phases and the one presented in this work is the last required for the integration of quality, environment, safety and others individual standardised MSs. Globally, the investigation results, by themselves, justified and prioritised the conception of an IMS–QES model, to be implemented at the company where the investigation was conducted, but also a generic model of an IMS, which may be more flexible, integrator and lean as possible, potentiating the efficiency, added value both in the present and, fundamentally, for future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this paper is to, in a holistic way, identify and explore the critical success factors (CSFs) that are considered in the context of the growing discussions, movements, proposed models, and case studies about the integration of management systems (MSs). This work is an investigation focused on the integration of MSs into an integrated management system (IMS) and the proposed approach takes into account the literature review as well as the experience gained by the authors on researches about Portuguese enterprises. This qualitative and empirical research, investigated the integration of MSs from existing scientific publications for the period 1999 to 2014, on-going case studies and one inquiry conducted by the authors. This research contributes to a better understanding of the CSFs regarding the integration of MSs and thus provides an insight on the preventive management. This research shows an evident lack of information regarding case studies on CSFs for integrated management systems (IMSs) and has identified a set of relevant CSFs, for MSs integration and associated guidelines that organizations should take as a priority, in order to be able to manage, on a preventive way, the implementation of IMSs, and consequently to become more competitive with added value for the stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis develops guidelines for the implementation of the health and safety management system according to the OHSAS 18001 standard, as well as the feasible threat analysis, project proposal schedule, future system quality improvements and organizational change evaluation. The theoretical part clarifies determination of occupational health and safety, its management system, the OHSAS 18001 standard and integrated management system compounded of triple ISO 14001, ISO 9001 and OHSAS 18001 standards. The literature includes such important aspects as human factor, organizational policies, possible benefits, threats, organizational safety culture, Deming’s quality improvement cycle, system implementation, maintenance and cost matters. The empirical part demonstrates real-life situation by using Andritz Pulp & Paper Oy as a case study. Prior the thesis proposal, Andritz Group is analysed including separate business areas, acquisition and integration strategies, current status of the health and safety management and parallel experiences of the largest business area Andritz Hydro. The proposal is aimed at improving the current health and safety system for the permanent and sub-contracted employees at Andritz Pulp & Paper both in Finland and in various projects globally.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Shrimp Aquaculture has provided tremendous opportunity for the economic and social upliftment of rural communities in the coastal areas of our country Over a hundred thousand farmers, of whom about 90% belong to the small and marginal category, are engaged in shrimp farming. Penaeus monodon is the most predominant cultured species in India which is mainly exported to highly sophisticated, quality and safety conscious world markets. Food safety has been of concem to humankind since the dawn of history and the concern about food safety resulted in the evolution of a cost effective, food safety assurance method, the Hazard Analysis Critical Control Point (HACCP). Considering the major contribution of cultured Penaeus monodon to the total shrimp production and the economic losses encountered due to disease outbreak and also because traditional methods of quality control and end point inspection cannot guarantee the safety of our cultured seafood products, it is essential that science based preventive approaches like HACCP and Pre requisite Programmes (PRP) be implemented in our shrimp farming operations. PRP is considered as a support system which provides a solid foundation for HACCP. The safety of postlarvae (PL) supplied for brackish water shrimp farming has also become an issue of concern over the past few years. The quality and safety of hatchery produced seeds have been deteriorating and disease outbreaks have become very common in hatcheries. It is in this context that the necessity for following strict quarantine measures with standards and code of practices becomes significant. Though there were a lot of hue and cry on the need for extending the focus of seafood safety assurance from processing and exporting to the pre-harvest and hatchery rearing phases, an experimental move in this direction has been rare or nil. An integrated management system only can assure the effective control of the quality, hygiene and safety related issues. This study therefore aims at designing a safety and quality management system model for implementation in shrimp farming and hatchery operations by linking the concepts of HACCP and PRP.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Quality Management, Integrated Technical Management Systems, ITMS, Technical Elements, Environment, Occupational Health and safety, OH&S, Standards, ISO, General Regulations, Integration, Management Functions, Computer Centre, Suc-cess Concepts, Documentation, PCT, QMS, EMS, OH&S-MS, Portioning, Evaluation, Technical Cycle, Technical Compliance, Framework

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present a system for dynamic network resource configuration in environments with bandwidth reservation and path restoration mechanisms. Our focus is on the dynamic bandwidth management results, although the main goal of the system is the integration of the different mechanisms that manage the reserved paths (bandwidth, restoration, and spare capacity planning). The objective is to avoid conflicts between these mechanisms. The system is able to dynamically manage a logical network such as a virtual path network in ATM or a label switch path network in MPLS. This system has been designed to be modular in the sense that in can be activated or deactivated, and it can be applied only in a sub-network. The system design and implementation is based on a multi-agent system (MAS). We also included details of its architecture and implementation

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Diplomityössä on tutkittu reaaliaikaisen toimintolaskennan toteuttamista suomalaisen lasersiruja valmistavan PK-yrityksen tietojärjestelmään. Lisäksi on tarkasteltu toimintolaskennan vaikutuksia operatiiviseen toimintaan sekä toimintojen johtamiseen. Työn kirjallisuusosassa on käsitelty kirjallisuuslähteiden perusteella toimintolaskennan teorioita, laskentamenetelmiä sekä teknisessä toteutuksessa käytettyjä teknologioita. Työn toteutusosassa suunniteltiin ja toteutettiin WWW-pohjainen toimintolaskentajärjestelmä case-yrityksen kustannuslaskennan sekä taloushallinnon avuksi. Työkalu integroitiin osaksi yrityksen toiminnanohjaus- sekä valmistuksenohjausjärjestelmää. Perinteisiin toimintolaskentamallien tiedonkeruujärjestelmiin verrattuna case-yrityksessä syötteet toimintolaskentajärjestelmälle tulevat reaaliaikaisesti osana suurempaa tietojärjestelmäintegraatiota.Diplomityö pyrkii luomaan suhteen toimintolaskennan vaatimusten ja tietokantajärjestelmien välille. Toimintolaskentajärjestelmää yritys voi hyödyntää esimerkiksi tuotteiden hinnoittelussa ja kustannuslaskennassa näkemällä tuotteisiin liittyviä kustannuksia eri näkökulmista. Päätelmiä voidaan tehdä tarkkaan kustannusinformaatioon perustuen sekä määrittää järjestelmän tuottaman datan perusteella, onko tietyn projektin, asiakkuuden tai tuotteen kehittäminen taloudellisesti kannattavaa.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present a system for dynamic network resource configuration in environments with bandwidth reservation and path restoration mechanisms. Our focus is on the dynamic bandwidth management results, although the main goal of the system is the integration of the different mechanisms that manage the reserved paths (bandwidth, restoration, and spare capacity planning). The objective is to avoid conflicts between these mechanisms. The system is able to dynamically manage a logical network such as a virtual path network in ATM or a label switch path network in MPLS. This system has been designed to be modular in the sense that in can be activated or deactivated, and it can be applied only in a sub-network. The system design and implementation is based on a multi-agent system (MAS). We also included details of its architecture and implementation

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In 2005, Wetland Studies and Solutions, Inc. (WSSI) installed an extensive Low Impact Development (LID) stormwater management system on their new office site in Gainesville, Virginia. The 4-acre site is serviced by a network of LID components: permeable pavements (two proprietary and one gravel type), bioretention cell / rain garden, green roof, vegetated swale, rainwater harvesting and drip irrigation, and slow-release underground detention. The site consists of heavy clay soils, and the LID components are mostly integrated by a series of underdrain pipes. A comprehensive monitoring system has been designed and installed to measure hydrologic performance throughout the LID, underdrained network. The monitoring system measures flows into and out of each LID component independently while concurrently monitoring rainfall events. A sensitivity analysis and laboratory calibration has been performed on the flow measurement system. Field data has been evaluated to determine the hydrologic performance of the LID features. Finally, hydrologic models amenable to compact, underdrained LID sites have been reviewed and recommended for future modeling and design.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

On cover: New horizons in long term care.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper proposes an implementation, based on a multi-agent system, of a management system for automated negotiation of electricity allocation for charging electric vehicles (EVs) and simulates its performance. The widespread existence of charging infrastructures capable of autonomous operation is recognised as a major driver towards the mass adoption of EVs by mobility consumers. Eventually, conflicting requirements from both power grid and EV owners require automated middleman aggregator agents to intermediate all operations, for example, bidding and negotiation, between these parts. Multi-agent systems are designed to provide distributed, modular, coordinated and collaborative management systems; therefore, they seem suitable to address the management of such complex charging infrastructures. Our solution consists in the implementation of virtual agents to be integrated into the management software of a charging infrastructure. We start by modelling the multi-agent architecture using a federated, hierarchical layers setup and as well as the agents' behaviours and interactions. Each of these layers comprises several components, for example, data bases, decision-making and auction mechanisms. The implementation of multi-agent platform and auctions rules, and of models for battery dynamics, is also addressed. Four scenarios were predefined to assess the management system performance under real usage conditions, considering different types of profiles for EVs owners', different infrastructure configurations and usage and different loads on the utility grid (where real data from the concession holder of the Portuguese electricity transmission grid is used). Simulations carried with the four scenarios validate the performance of the modelled system while complying with all the requirements. Although all of these have been performed for one charging station alone, a multi-agent design may in the future be used for the higher level problem of distributing energy among charging stations. Copyright (c) 2014 John Wiley & Sons, Ltd.