162 resultados para deliverable
Resumo:
Motorcycle trauma is a serious road safety issue in Queensland and throughout Australia. In 2009, Queensland Transport (later Transport and Main Roads or TMR) appointed CARRS-Q to provide a three-year program of Road Safety Research Services for Motorcycle Rider Safety. Funding for this research originated from the Motor Accident Insurance Commission. This program of research was undertaken to produce knowledge to assist TMR to improve motorcycle safety by further strengthening the licensing and training system to make learner riders safer by developing a pre-learner package (Deliverable 1 which is the focus of this report), and by evaluating the Q-Ride CAP program to ensure that it is maximally effective and contributes to the best possible training for new riders (Deliverable 2), which is the focus of this report. Deliverable 3 of the program identified potential new licensing components that will reduce the incidence of risky riding and improve higher-order cognitive skills in new riders. While fatality and injury rates for learner car drivers are typically lower than for those with intermediate licences, this pattern is not found for learner motorcycle riders. Learner riders cannot be supervised as effectively as learner car drivers and errors are more likely to result in injury for learner riders than learner drivers. It is therefore imperative to improve safety for learner riders. Deliverable 1 examines the potential for improving the motorcycle learner and licence scheme by introducing a pre-learner motorcycle licensing and training scheme within Queensland. The tasks undertaken for Deliverable 1 were a literature review, analysis of learner motorcyclist crash and licensing data, and the development of a potential pre-learner motorcycle rider program.
Resumo:
Austroads called for responses to a tender to investigate options for rehabilitation in alcohol interlock programs. Following successful application by the Centre for Accident Research and Road Safety – Queensland (CARRS-Q), a program of work was developed. The project has four objectives: 1. Develop a matrix outlining existing policies in national and international jurisdictions with respect to treatment and rehabilitation programs and criteria for eligibility for interlock removal; 2. Critically review the available literature with a focus on evaluation outcomes regarding the effectiveness of treatment and rehabilitation programs; 3. Analyse and assess the strengths and weaknesses of the programs/approaches identified, and; 4. Outline options with an evidence base for consideration by licensing authorities.
Resumo:
Rice cultivation at any level in the Sacramento–San Joaquin Delta (existing or expanded) compels the need to quantify surface and subsurface loads of dissolved organic carbon (DOC), disinfection byproduct precursors (DBPPs) and nitrogen. This information can be used to develop Best Management Practices (BMPs) to reduce export of these constituents in order to improve drinking water quality. Although rice cultivation in the Delta is relatively limited, several factors outside of this research could contribute to increased rice acreage in the Delta: • Recently developed rice varieties seem more suitable for the Delta climate than earlier varieties which required warmer conditions; • Previous economic analyses (Appendix A.10) suggest rice is more profitable than corn, a dominant land use in the Delta; • Recent studies on wetlands at Twitchell Island suggest rice production can help mitigate oxidative subsidence (Miller et al. 2000); • The different oxidative states that result from flooding in rice as compared to those found in crops that require drained soils may help control crop specific weeds and nematodes when rice is incorporated into a crop rotation; and • Providing flooded conditions during a greater part of the year than other crops may benefit water birds. ... (PDF contains 249 pages)
Resumo:
This is the specification for the 4th deliverable of the Agile Software Engineering Group Project. The 4th deliverable is code increment 3 of the application built in the 3rd sprint