Contribution to "Deliverable 4: Activity 6: Pilot Demonstrations: Pilot testing, 2nd milling campaign"


Autoria(s): Ribeiro, Belina; Torrado, I.; Penedo, Céu; Eusébio, Ana
Data(s)

06/06/2016

06/06/2016

2015

Resumo

Report for Deliverable 4: Activity 6 of MEDOLICO Project - Mediterranean Cooperation in the Treatment and Valorisation of Olive Mill Wastewater, EU Programme ENPI-CBCMED I-B/2.1/090

Identificador

Ribeiro, B.; Torrado, I.; Penedo, C.; Eusébio, A. - Contribution to "Deliverable 4: Activity 6: Pilot Demonstrations: Pilot testing, 2nd milling campaign". Report for Deliverable 4: Activity 6 of MEDOLICO Project - Mediterranean Cooperation in the Treatment and Valorisation of Olive Mill Wastewater, EU Programme ENPI-CBCMED I-B/2.1/090, Lisboa, LNEG/UB, July, 2015, 182 p.

http://hdl.handle.net/10400.9/3000

Idioma(s)

eng

Relação

EU Programme ENPI-CBCMED I-B/2.1/090

Direitos

openAccess

Palavras-Chave #Olive mill wastewater #Residues #Treatment #Valorisation
Tipo

report