824 resultados para critical factors
Resumo:
Teaching awards, grants and fellowships are strategies used to recognise outstanding contributions to learning and teaching, encourage innovation, and to shift learning and teaching from the edge to centre stage. Examples range from school, faculty and institutional award and grant schemes to national schemes such as those offered by the Australian Learning and Teaching Council (ALTC), the Carnegie Foundation for the Advancement of Teaching in the United States, and the Fund for the Development of Teaching and Learning in higher education in the United Kingdom. The Queensland University of Technology (QUT) has experienced outstanding success in all areas of the ALTC funding since the inception of the Carrick Institute for Learning and Teaching in 2004. This paper reports on a study of the critical factors that have enabled sustainable and resilient institutional engagement with ALTC programs. As a lens for examining the QUT environment and practices, the study draws upon the five conditions of the framework for effective dissemination of innovation developed by Southwell, Gannaway, Orrell, Chalmers and Abraham (2005, 2010): 1. Effective, multi-level leadership and management 2. Climate of readiness for change 3. Availability of resources 4. Comprehensive systems in institutions and funding bodies 5. Funding design The discussion on the critical factors and practical and strategic lessons learnt for successful university-wide engagement offer insights for university leaders and staff who are responsible for learning and teaching award, grant and associated internal and external funding schemes.
Resumo:
Strong regulatory pressure on environmental issues and the improved public awareness will continue to influence the market demand for sustainable housing in the coming years. Despite this potential, the voluntary up-take rate of sustainable practices is not as high as expected within the new built housing industry. This is in contrast to the influx of emerging building technologies, new materials and innovative designs as seen in office buildings and exemplar homes built worldwide. One possible reason for this is that key stakeholders such as developers, builders and consumers do not fully understand and appreciate the tangible and mutual benefits of sustainability in their professional and business activities. This situation warrants the study of a multifaceted strategy that integrates the needs of multiple stakeholders. This research investigates multiple factors that affect key stakeholder’s benefits in sustainable housing implementation. Drawing insights from a quantitative study on a questionnaire survey and a qualitative study of in-depth interviews with key stakeholders in the Australian housing industry, 11 critical factors of driving market demand for sustainable housing were unearthed. Their inter-relationships were identified with the aid of Interpretive Structural Modelling. The study concludes with a hierarchical model that amalgamates the strategies for the decision making of key stakeholders.
Resumo:
Public-private partnerships (PPPs) are increasingly used to procure Australian infrastructure projects. As with all construction projects, the early briefing stages are often the most crucial in determining a successful outcome. There is, however, a lack of systematic research on the type and nature of the critical factors affecting the effectiveness and efficiency of PPP during this period. A literature review is presented of PPP usage in Australia, in which four main categories of factors (procurement, stakeholder, risk, and finance) are identified, each with several subfactors. A questionnaire survey involving state government stakeholders is also described, and a mathematical model that ranks the factors involved is developed. This is followed by an examination of the potential of the factors to help improve the PPP briefing stage for both public and private sectors.
Resumo:
While scientists continue to explore the level of climate change impact to new weather patterns and our environment in general, there have been some devastating natural disasters worldwide in the last two decades. Indeed natural disasters are becoming a major concern in our society. Yet in many previous examples, our reconstruction efforts only focused on providing short-term necessities. How to develop resilience in the long run is now a highlight for research and industry practice. This paper introduces a research project aimed at exploring the relationship between resilience building and sustainability in order to identify key factors during reconstruction efforts. From extensive literature study, the authors considered the inherent linkage between the two issues as evidenced from past research. They found that sustainability considerations can improve the level of resilience but are not currently given due attention. Reconstruction efforts need to focus on resilience factors but as part of urban development, they must also respond to the sustainability challenge. Sustainability issues in reconstruction projects need to be amplified, identified, processed, and managed properly. On-going research through empirical study aims to establish critical factors (CFs) for stakeholders in disaster prone areas to plan for and develop new building infrastructure through holistic considerations and balanced approaches to sustainability. A questionnaire survey examined a range of potential factors and the subsequent data analysis revealed six critical factors for sustainable Post Natural Disaster Reconstruction that include: considerable building materials and construction methods, good governance, multilateral coordination, appropriate land-use planning and policies, consideration of different social needs, and balanced combination of long-term and short-term needs. Findings from this study should have an influence on policy development towards Post Natural Disaster Reconstruction and help with the achievement of sustainable objectives.
Resumo:
Post–disaster reconstruction projects are often considered ineffectual or unproductive because on many occasions in the past they have performed extremely poorly during post-contract occupation, or have failed altogether to deliver acceptable outcomes. In some cases, these projects have already failed even before their completion, leading many sponsor aid organisations to hold these projects up as examples of how not to deliver housing reconstruction. Research into some previous unsuccessful projects has revealed that often the lack of adequate knowledge regarding the context and complexity involved in the implementation of these projects is generally responsible for their failure. Post-disaster reconstruction projects are certainly very complex in nature, often very context-specific and they can vary widely in magnitude. Despite such complexity, reconstruction projects can still have a high likelihood of success if adequate consideration is given to the importance of factors which are known to positively influence reconstruction efforts. Good outcomes can be achieved when planners and practitioners ensure best practices are embedded in the design of reconstruction projects at the time reconstruction projects they are first instigated. This paper outlines and discusses factors that significantly contribute to the successful delivery of post-disaster housing reconstruction projects.
Resumo:
While scientists are still debating the level of climate change impact to new weather patterns, there have been some devastating natural disasters worldwide in the last decade. From cyclones to earthquakes and from Tsunamis to landslides, these disasters occur with formidable forces and crushing effects. As one of the most important arrangements to erase the negative influence of natural disasters and help with the recovery and redevelopment of the hit area, reconstruction is of utmost importance in light of sustainable objectives. However, current reconstruction practice confronts quite a lot of criticisms for focusing on providing short-term necessities. How to conduct the post disaster reconstruction in a long-term perspective and achieve sustainable development is thereby a highlight for industry practice and research. This paper introduced an on-going research project which is aimed at establishing an operational framework for improving sustainability performance of post disaster reconstruction by identifying critical sustainable factors and exploring their internal relationships. The research reported in this paper is part of the project. After a comprehensive literature review, 17 potential critical sustainability factors for post disaster reconstruction were identified. Preliminary examination and discussion of the factors was conducted.
Resumo:
Defence projects are typically undertaken within a multi-project-management environment where a common agenda of project managers is to achieve higher project efficiency. This study adopted a multi-facet qualitative approach to investigate factors contributing to or impeding project efficiency in the Defence sector. Semi-structured interviews were undertaken to identify additional factors to those compiled from the literature survey. This was followed by a three-round Delphi study to examine the perceived critical factors of project efficiency. The results showed that project efficiency in the Defence sector went beyond its traditional internally focused scope to one that is externally focused. As a result, efforts are needed on not only those factors related to individual projects but also those factors related to project inter-dependencies and external customers. The management of these factors will help to enhance the efficiency of a project within the Defence sector.
Resumo:
By using information collected from numerous American Economic Review publications from the last 100 years, Torgler and Piatti examine the top publishing institutions to determine their most renowned AER papers based on citation success. Areas of interest include how often an individual can publish in the AER, how equally successful citations are distributed and who the top AER publishing authors are. The book explores what the level of cooperation is among authors and what drives systems such as the alphabetical name ordering. Torgler and Piatti critically examine the individual characteristics of AER authors, editors, editorial board members and referees and even tackle more intricate details such as the frequency of female publications in the AER. The authors observe and analyse the relationship between academic age and publication performance to see if there is any pattern on these factors and citation success. The book then goes on to analyse data concerning awards, and whether awards can increase the probability of publishing in the AER at a later stage
Resumo:
Improved public awareness of the environment and available technologies will continue to highlight the importance of sustainable housing in the coming years. Despite this potential, the majority of new housing development in Australia is still “project homes” with few tangible sustainability measures. Stakeholders tend to have different perceptions and priorities on sustainability. To promote the uptake of sustainable housing products, a study of the critical issues affecting the implementation of sustainable housing is necessary. This research investigates multiple factors that may influence key stakeholders’ decision-making towards sustainable housing adoption. Drawing insights from combined questionnaire and interview studies, 12 critical factors and their interrelationships are identified based on professional views in the Australian housing industry. The mutual influences, or driving force and dependency, of these factors are further investigated via Interpretive Structural Modelling (ISM) to distinguish those requiring prominent and immediate attention. A hierarchical model is developed to help key stakeholders prioritise actions when implementing sustainable housing.
Resumo:
Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.
Resumo:
Public private partnerships (PPP) are widely used for construction project procurement. However, the briefing stage of PPP projects has been largely overlooked, although it has a far-reaching influence throughout the project life cycle. In response, we rectify this by exploring the critical factors involved. A set of 15 procurement-related factors are first identified from the existing literature. Then the effects of four background variables on the factors are tested with Hong Kong government data by an exploratory factor analysis extracting four major dimensions. The relationships between these dimensions and background variables indicate the need to take the background variables into account when ranking the factors. The ranking of the factors is then obtained by considering their weighted importance. Finally, the final practical value of the results is discussed.