700 resultados para cost overruns
Resumo:
Most cases of cost overruns in public procurement are related to important changes in the initial project design. This paper deals with the problem of design specification in public procurement and provides a rationale for design misspecification. We propose a model in which the sponsor decides how much to invest in design specification and awards competitively the project to a contractor. After the project has been awarded the sponsor engages in bilateral renegotiation with the contractor, in order to accommodate changes in the initial project s design that new information makes desirable. When procurement takes place in the presence of horizontally differentiated contractors, the design s specification level is seen to affect the resulting degree of competition. The paper highlights this interaction between market competition and design specification and shows that the sponsor s optimal strategy, when facing an imperfectly competitive market supply, is to underinvest in design specification so as to make significant cost overruns likely. Since no such misspecification occurs in a perfectly competitive market, cost overruns are seen to arise as a consequence of lack of competition in the procurement market.
Resumo:
Most cases of cost overruns in public procurement are related to important changes in theinitial project design. This paper deals with the problem of design speciffication in public procurement and provides a rationale for design misspeciffication. We propose a model in which the sponsor decides how much to invest in design speciffication and awards competitively the project to a contractor. After the project has been awarded the sponsor engages in bilateral renegotiation with the contractor, in order to accommodate changes in the initial project's design that new information makes desirable. When procurement takes place in the presence of horizontally differentiated contractors, the design's speciffication level is seen to affect the resulting degree of competition. The paper highlights this interaction between market competition and design speciffication and shows that the sponsor's optimal strategy, when facing an imperfectly competitive market supply, is to underinvest in design speciffication so as to make signifficant cost overrunslikely. Since no such misspeciffication occurs in a perfectly competitive market, cost overruns are seen to arise as a consequence of lack of competition in the procurement market.
Resumo:
Poor project planning, implementation and control and the subsequent cost and time overruns are ubiquitous features that have been posing serious concern at all levels - state, national and international. It results in wastage of the nation's scarce resources and retards the socio-economic progress. Although several studies peripheral on project overruns have been made at the national level, no serious attempt has been made at the state level to identify the magnitude of overruns, their causes and impacts on industrial projects. The present study "Time and Cost Overruns of Industrial Projects in Kerala" is an earnest attempt to probe in depth the time and cost overruns and their impact on industrial projects. The study places emphasise on the identification of the real reasons behind the cost and time overruns. It also covers the present project management practices of industrial projects in Kerala.
Resumo:
Trabalho de Projeto
Resumo:
The investments have always been considered as an essential backbone and so-called ‘locomotive’ for the competitive economies. However, in various countries, the state has been put under tight budget constraints for the investments in capital intensive projects. In response to this situation, the cooperation between public and private sector has grown based on public-private mechanism. The promotion of favorable arrangement for collaboration between public and private sectors for the provision of policies, services, and infrastructure in Russia can help to address the problems of dry ports development that neither municipalities nor the private sector can solve alone. Especially, the stimulation of public-private collaboration is significant under the exposure to externalities that affect the magnitude of the risks during all phases of project realization. In these circumstances, the risk in the projects also is becoming increasingly a part of joint research and risk management practice, which is viewed as a key approach, aiming to take active actions on existing global and specific factors of uncertainties. Meanwhile, a relatively little progress has been made on the inclusion of the resilience aspects into the planning process of a dry ports construction that would instruct the capacity planner, on how to mitigate the occurrence of disruptions that may lead to million dollars of losses due to the deviation of the future cash flows from the expected financial flows on the project. The current experience shows that the existing methodological base is developed fragmentary within separate steps of supply chain risk management (SCRM) processes: risk identification, risk evaluation, risk mitigation, risk monitoring and control phases. The lack of the systematic approach hinders the solution of the problem of risk management processes of dry port implementation. Therefore, management of various risks during the investments phases of dry port projects still presents a considerable challenge from the practical and theoretical points of view. In this regard, the given research became a logical continuation of fundamental research, existing in the financial models and theories (e.g., capital asset pricing model and real option theory), as well as provided a complementation for the portfolio theory. The goal of the current study is in the design of methods and models for the facilitation of dry port implementation through the mechanism of public-private partnership on the national market that implies the necessity to mitigate, first and foremost, the shortage of the investments and consequences of risks. The problem of the research was formulated on the ground of the identified contradictions. They rose as a continuation of the trade-off between the opportunities that the investors can gain from the development of terminal business in Russia (i.e. dry port implementation) and risks. As a rule, the higher the investment risk, the greater should be their expected return. However, investors have a different tolerance for the risks. That is why it would be advisable to find an optimum investment. In the given study, the optimum relates to the search for the efficient portfolio, which can provide satisfaction to the investor, depending on its degree of risk aversion. There are many theories and methods in finance, concerning investment choices. Nevertheless, the appropriateness and effectiveness of particular methods should be considered with the allowance of the specifics of the investment projects. For example, the investments in dry ports imply not only the lump sum of financial inflows, but also the long-term payback periods. As a result, capital intensity and longevity of their construction determine the necessity from investors to ensure the return on investment (profitability), along with the rapid return on investment (liquidity), without precluding the fact that the stochastic nature of the project environment is hardly described by the formula-based approach. The current theoretical base for the economic appraisals of the dry port projects more often perceives net present value (NPV) as a technique superior to other decision-making criteria. For example, the portfolio theory, which considers different risk preference of an investor and structures of utility, defines net present value as a better criterion of project appraisal than discounted payback period (DPP). Meanwhile, in business practice, the DPP is more popular. Knowing that the NPV is based on the assumptions of certainty of project life, it cannot be an accurate appraisal approach alone to determine whether or not the project should be accepted for the approval in the environment that is not without of uncertainties. In order to reflect the period or the project’s useful life that is exposed to risks due to changes in political, operational, and financial factors, the second capital budgeting criterion – discounted payback period is profoundly important, particularly for the Russian environment. Those statements represent contradictions that exist in the theory and practice of the applied science. Therefore, it would be desirable to relax the assumptions of portfolio theory and regard DPP as not fewer relevant appraisal approach for the assessment of the investment and risk measure. At the same time, the rationality of the use of both project performance criteria depends on the methods and models, with the help of which these appraisal approaches are calculated in feasibility studies. The deterministic methods cannot ensure the required precision of the results, while the stochastic models guarantee the sufficient level of the accuracy and reliability of the obtained results, providing that the risks are properly identified, evaluated, and mitigated. Otherwise, the project performance indicators may not be confirmed during the phase of project realization. For instance, the economic and political instability can result in the undoing of hard-earned gains, leading to the need for the attraction of the additional finances for the project. The sources of the alternative investments, as well as supportive mitigation strategies, can be studied during the initial phases of project development. During this period, the effectiveness of the investments undertakings can also be improved by the inclusion of the various investors, e.g. Russian Railways’ enterprises and other private companies in the dry port projects. However, the evaluation of the effectiveness of the participation of different investors in the project lack the methods and models that would permit doing the particular feasibility study, foreseeing the quantitative characteristics of risks and their mitigation strategies, which can meet the tolerance of the investors to the risks. For this reason, the research proposes a combination of Monte Carlo method, discounted cash flow technique, the theory of real options, and portfolio theory via a system dynamics simulation approach. The use of this methodology allows for comprehensive risk management process of dry port development to cover all aspects of risk identification, risk evaluation, risk mitigation, risk monitoring, and control phases. A designed system dynamics model can be recommended for the decision-makers on the dry port projects that are financed via a public-private partnership. It permits investors to make a decision appraisal based on random variables of net present value and discounted payback period, depending on different risks factors, e.g. revenue risks, land acquisition risks, traffic volume risks, construction hazards, and political risks. In this case, the statistical mean is used for the explication of the expected value of the DPP and NPV; the standard deviation is proposed as a characteristic of risks, while the elasticity coefficient is applied for rating of risks. Additionally, the risk of failure of project investments and guaranteed recoupment of capital investment can be considered with the help of the model. On the whole, the application of these modern methods of simulation creates preconditions for the controlling of the process of dry port development, i.e. making managerial changes and identifying the most stable parameters that contribute to the optimal alternative scenarios of the project realization in the uncertain environment. System dynamics model allows analyzing the interactions in the most complex mechanism of risk management process of the dry ports development and making proposals for the improvement of the effectiveness of the investments via an estimation of different risk management strategies. For the comparison and ranking of these alternatives in their order of preference to the investor, the proposed indicators of the efficiency of the investments, concerning the NPV, DPP, and coefficient of variation, can be used. Thus, rational investors, who averse to taking increased risks unless they are compensated by the commensurate increase in the expected utility of a risky prospect of dry port development, can be guided by the deduced marginal utility of investments. It is computed on the ground of the results from the system dynamics model. In conclusion, the outlined theoretical and practical implications for the management of risks, which are the key characteristics of public-private partnerships, can help analysts and planning managers in budget decision-making, substantially alleviating the effect from various risks and avoiding unnecessary cost overruns in dry port projects.
Resumo:
Ohjelmiston suorituskyky on kokonaisvaltainen asia, johon kaikki ohjelmiston elinkaaren vaiheet vaikuttavat. Suorituskykyongelmat johtavat usein projektien viivästymisiin, kustannusten ylittymisiin sekä joissain tapauksissa projektin täydelliseen epäonnistumiseen. Software performance engineering (SPE) on ohjelmistolähtöinen lähestysmistapa, joka tarjoaa tekniikoita suorituskykyisen ohjelmiston kehittämiseen. Tämä diplomityö tutkii näitä tekniikoita ja valitsee niiden joukosta ne, jotka soveltuvat suorituskykyongelmien ratkaisemiseen kahden IT-laitehallintatuotteen kehityksessä. Työn lopputuloksena on päivitetty versio nykyisestä tuotekehitysprosessista, mikä huomioi sovellusten suorituskykyyn liittyvät haasteet tuotteiden elinkaaren eri vaiheissa.
Resumo:
La presente investigación tiene por objeto considerar los cluster en la industria farmacéutica Colombiana, como un mecanismo para la disminución de los sobrecostos de los medicamentos, que han impactado de forma importante, entre otras causas, al sistema de salud, con unos recobros (por concepto de medicamentos No POS) que superan el billón de pesos, situación que dada la crisis que enfrenta al respecto, el Estado Colombiano, ha propuesto una quinta reforma que cursa actualmente en el Congreso de la República. Se trata de una investigación cualitativa tipo estudio de caso, en la que se presenta el modelo Colombiano de Salud y las cifras de recobros de las Empresas Prestadoras de Servicios de Salud (EPS), cantidad que representó el 0.4% del PIB (Producto Interno Bruto) en el 2009. Para tal fin se analizará el comportamiento de los recobros durante el año 2012, en cuarenta y una (41) EPS reconocidas del sector. Subsecuentemente se estudian las diferentes estrategias para la generación de economías de escala y dentro de ellas, los clusters como un posible modelo a seguir hacia la disminución de estos costos en salud, se analizan sus componentes y su posible constitución dentro del entorno Colombiano. Al final del estudio se establece como conclusión, que existen suficiente evidencia para apoyar la implementación de un cluster farmacéutico dentro del territorio Colombiano.
Resumo:
El incumplimiento reiterado de la normatividad y políticas relacionadas con los tiempos de respuesta del proceso de contratación minera del país, desarrollado actualmente por la recién creada Agencia Nacional de Minería ANM, ha suscitado que la administración del recurso minero no se realice bajo los principios de eficiencia, eficacia, economía y celeridad. Estas debilidades manifiestas provocan represamientos en la resolución de trámites, congelación de áreas para contratar, sobrecostos, demoras en los tiempos de respuesta establecidos por la normatividad vigente y trae como consecuencia incertidumbre en los inversionistas mineros y pérdidas por concepto de recaudo de canon superficiario, entre otras. El objetivo del presente trabajo de investigación consiste en analizar el proceso de titulación minera de Colombia a partir de la filosofía de mejora continua desarrollado en la teoría de restricciones TOC (Theory Of Constraints), para poder identificar cuáles son los cuellos de botella que no permiten que el proceso fluya de manera adecuada y proponer alternativas de mejora, que con su implementación exploten y subordinen la limitaciones al sistema.
Resumo:
Firms form consortia in order to win contracts. Once a project has been awarded to a consortium each member then concentrates on his or her own contract with the client. Therefore, consortia are marketing devices, which present the impression of teamworking, but the production process is just as fragmented as under conventional procurement methods. In this way, the consortium forms a barrier between the client and the actual construction production process. Firms form consortia, not as a simple development of normal ways of working, but because the circumstances for specific projects make it a necessary vehicle. These circumstances include projects that are too large or too complex to undertake alone or projects that require on-going services which cannot be provided by the individual firms inhouse. It is not a preferred way of working, because participants carry extra risk in the form of liability for the actions of their partners in the consortium. The behaviour of members of consortia is determined by their relative power, based on several factors, including financial commitment and ease of replacement. The level of supply chain visibility to the public sector client and to the industry is reduced by the existence of a consortium because the consortium forms an additional obstacle between the client and the firms undertaking the actual construction work. Supply chain visibility matters to the client who otherwise loses control over the process of construction or service provision, while remaining accountable for cost overruns. To overcome this separation there is a convincing argument in favour of adopting the approach put forward in the Project Partnering Contract 2000 (PPC2000) Agreement. Members of consortia do not necessarily go on to work in the same consortia again because members need to respond flexibly to opportunities as and when they arise. Decision-making processes within consortia tend to be on an ad hoc basis. Construction risk is taken by the contractor and the construction supply chain but the reputational risk is carried by all the firms associated with a consortium. There is a wide variation in the manner that consortia are formed, determined by the individual circumstances of each project; its requirements, size and complexity, and the attitude of individual project leaders. However, there are a number of close working relationships based on generic models of consortia-like arrangements for the purpose of building production, such as the Housing Corporation Guidance Notes and the PPC2000.
Resumo:
Purpose-Unplanned changes in construction projects are common and lead to disruptive effects such as project delays, cost overruns and quality deviations. Rework due to unplanned changes can cost 10-15 per cent of contract value. By managing these changes more effectively, these disruptive effects can be minimised. Previous research has approached this problem from an information-processing view. In this knowledge age, the purpose of this paper is to argue that effective change management can be brought about by better understanding the significant role of knowledge during change situations. Design/methodology/approach - Within this knowledge-based context, the question of how construction project teams manage knowledge during unplanned change in the construction phase within collaborative team settings is investigated through a selected case study sample within the UK construction industry. Findings- Case study findings conclude that different forms of knowledge are created and shared between project team members during change events which is very much socially constructed and centred on tacit knowledge and experience of project personnel. Originality/value- Building on the case study findings the paper finally offers a model that represents the role of knowledge during managing project change.
Resumo:
Purpose – Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze the influence of climate on standard construction work activities through a case study. Design/methodology/approach – By studying the extent at which some weather variables impede outdoor work from being effectively executed, new maps and tables for planning for delays are presented. In addition, a real case regarding the construction of several bridges in southern Chile is analyzed. Findings – Few studies have thoroughly addressed the influences of major climatic agents on the most common outdoor construction activities. The method detailed here provides a first approximation for construction planners to assess to what extent construction productivity will be influenced by the climate. Research limitations/implications – Although this study was performed in Chile, the simplified method proposed is entirely transferable to any other country, however, other weather or combinations of weather variables could be needed in other environments or countries. Practical implications – The implications will help reducing the negative social, economic and environmental outcomes that usually emerge from project delays. Originality/value – Climatic data were processed using extremely simple calculations to create a series of quantitative maps and tables that would be useful for any construction planner to decide the best moment of the year to start a project and, if possible, where to build it.
Resumo:
Reliability is a key aspect in power system design and planning. Maintaining a reliable power system is a very important issue for their design and operation. Under the new competitive framework of the electricity sector, power systems find ever more and more strained to operate near their limits. Under this new scenario, it is crucial for the system operator to use tools that facilitate an energy dispatch that minimizes possible power cuts. This paper presents a mathematical model to calculate an energy dispatch that considers security constraints (single contingencies in transmission lines and transformers). The model involves pool markets and fixed bilateral contracts. Traditional methodologies that include security constraints are usually based in multistage dispatch processes. In this case, we propose a single-stage model that avoids the economic inefficiencies which result when conventional multi-stage dispatch approaches are applied. The proposed model includes an AC representation of the transport system and allows calculating the cost overruns incurred in due to reliability restrictions. We found that complying with fixed bilateral contracts, when they go above certain levels, might lead to congestion problems in transmission lines.
Resumo:
The recognition of the relevance of energy, especially of the renewable energies generated by the sun, water, wind, tides, modern biomass or thermal is growing significantly in the global society based on the possibility it has to improve societies′ quality of life, to support poverty reduction and sustainable development. Renewable energy, and mainly the energy generated by large hydropower generation projects that supply most of the renewable energy consumed by developing countries, requires many technical, legal, financial and social complex processes sustained by innovations and valuable knowledge. Besides these efforts, renewable energy requires a solid infrastructure to generate and distribute the energy resources needed to solve the basic needs of society. This demands a proper construction performance to deliver the energy projects planned according to specifications and respecting environmental and social concerns, which implies the observance of sustainable construction guidelines. But construction projects are complex and demanding and frequently face time and cost overruns that may cause negative impacts on the initial planning and thus on society. The renewable energy issue and the large renewable energy power generation and distribution projects are particularly significant for developing countries and for Latin America in particular, as this region concentrates an important hydropower potential and installed capacity. Using as references the performance of Venezuelan large hydropower generation projects and the Guri dam construction, this research evaluates the tight relationship existing between sustainable construction and knowledge management and their impact to achieve sustainability goals. The knowledge management processes are proposed as a basic strategy to allow learning from successes and failures obtained in previous projects and transform the enhancement opportunites into actions to improve the performance of the renewable energy power generation and distribution projects.
Resumo:
Las desviaciones de tiempo y coste constituyen un fenómeno muy frecuente en la industria de la construcción. Existe un gran número de proyectos que no se terminan en el plazo y el tiempo estipulados, y esto parece que se ha convertido más en la norma que en la excepción. Los proyectos de construcción son heterogéneos por naturaleza y pueden llegar a ser muy complejos, involucrando numerosos procesos y expuestos a infinidad de variables y factores que pueden afectar el cumplimiento de los objetivos de tiempo y coste. Las desviaciones de tiempo y coste no favorecen ni al promotor ni al resto de equipos participantes del proyecto, dando lugar además la mayoría de las veces a situaciones de conflictos y relaciones adversas entre participantes del proyecto. Es por todo ello que surge la necesidad de atender a una estrategia de gestión de riesgos eficaz, como herramienta esencial de la gestión de proyectos para contribuir al éxito de los mismos. Es preciso considerar también que los proyectos de construcción pueden presentar distintas características específicas según el tipo de proyecto de que se traten. El presente trabajo de investigación estudia concretamente los proyectos de edificios de uso hotelero, los cuales pueden presentar estructuras organizativas muy diversas, incluyendo numerosos agentes participantes y procesos que a su vez se desarrollan en un entorno que ya es muy dinámico por su propia naturaleza. En el sector hotelero el cumplimiento de los objetivos de tiempo y coste del proyecto son especialmente importantes ya que cualquier retraso en la fecha de apertura estimada del hotel se traducirá en pérdidas importantes de negocio y cuota de mercado y podrá llevar asociadas también repercusiones importantes en otros aspectos relacionados con la operativa hotelera. Si se conocen las causas que originan tales desviaciones de tiempo y coste, se podrán establecer las correspondientes medidas de actuación para anticiparnos a ellas y que no se produzcan, siendo ésta la base del propósito de esta tesis. Así, la identificación de riesgos supone el primer paso para una gestión de riesgos eficaz, fundamental para contribuir al éxito de un proyecto. El contexto de la investigación delimita como lugar geográfico de estudio España, donde el sector turístico constituye un motor importante de la economía y en el que la eficiencia y competitividad debe estar reflejada también en el proceso del proyecto edificatorio, minimizándose los retrasos y sobrecostes. El presente estudio investiga por tanto los factores de riesgo más críticos que dan lugar a desviaciones de tiempo y coste en proyectos de edificios de uso hotelero en España. A partir del análisis de la literatura existente se genera una propuesta de identificación de factores de riesgo, que se analiza mediante un análisis cualitativo basado en la opinión de expertos y estudio de casos específicos. De los resultados de este análisis se determinan los niveles críticos para cada factor de riesgo, se comparan además las percepciones de niveles de riesgo según distintos tipos de grupos profesionales, y se establece un procedimiento en cuanto a prioridad de acción de respuesta. Así, se desarrolla una propuesta final de identificación y matriz de factores de riesgo con el objetivo de que pueda servir de base a propietarios, empresas gestoras y otros participantes de proyectos hoteleros para diseñar un plan de gestión de riesgos eficaz, contribuyendo de este modo al éxito del proyecto en cuanto a cumplimiento de objetivos de tiempo y coste programados. ABSTRACT Cost and schedule overruns constitute a very frequent phenomenon in the construction industry. A large number of construction projects do not finish on the estimated time and cost, and this scenario seems to be becoming the norm rather than the exception. Construction projects are heterogeneous by nature and they can become very complex as they involve a large number of processes which are subject to many variables and factors that may give rise to time and cost overruns. Time and cost overruns cause dissatisfaction not only to owners but all stakeholders involved in the project, leading most of the times to undesirable situations of conflicts and adversarial relationships between project participants. Hence, it becomes necessary to adopt an effective risk management strategy as an essential part of project management in order to achieve project success. Construction projects may have different characteristics depending on the type of project. This research specifically focuses on hotel construction projects. Hotel projects usually involve complex organizational structures, including many project participants and processes which develop in an environment that is already dynamic by nature. In this type of projects, the achievement of time and cost objectives is particularly important, as any delay of the hotel opening date will result in significant loss of business and market share and may also involve key important implications related to hotel operations. If the risk factors that lead to time and cost overrun are known in advance, preventive actions could be established in order to avoid them, so that time and cost overruns are minimized. This constitutes the aim of this research, being risk identification the first step of any effective risk management strategy for project success. The context of this research is focused on a particular geographical area, being this Spain. Tourism in Spain is a major contributor to the Spanish economy, and efficiency and competiveness should also be reflected in the building processes of the hotel industry, where delays and cost overruns should be kept to the minimum. The aim of this study is to explore the most critical risk factors leading to time and cost overruns in hotel construction projects in Spain. From the analysis of the literature review, a proposal of a risk identification framework is developed, which will be further analyzed by a qualitative assessment based on expert opinions and the study of specific case studies. From the results of this assessment, the levels of risk criticality are determined for the identified factors, a comparison of the perceptions of risk levels among different groups of respondents is also carried out, and a procedure for prioritization of factors in terms of needs of response is established. A final proposal of a risk register matrix framework is then developed in order to assist hotel owners, project management companies or other hotel project stakeholders, and provide them with a base to design their own specific risk management plans, contributing in this way to project success with regards to the achievement of cost and time objectives.
Resumo:
In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.