990 resultados para contract type


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper is concerned with the role of information in the servitization of manufacturing which has led to “the innovation of an organisation’s capabilities and processes as equipment manufacturers seek to offer services around their products” (Neely 2009, Baines et al 2009). This evolution has resulted in an information requirement (IR) shift as companies move from discrete provision of equipment and spare parts to long-term service contracts guaranteeing prescribed performance levels. Organisations providing such services depend on a very high level of availability and quality of information throughout the service life-cycle (Menor et al 2002). This work focuses on whether, for a proposed contract based around complex equipment, the Information System is capable of providing information at an acceptable quality and requires the IRs to be examined in a formal manner. We apply a service information framework (Cuthbert et al 2008, McFarlane & Cuthbert 2012) to methodically assess IRs for different contract types to understand the information gap between them. Results from case examples indicate that this gap includes information required for the different contract types and a set of contract-specific IRs. Furthermore, the control, ownership and use of information differs across contract types as the boundary of operation and responsibility changes.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

For design-build (DB) projects, owners normally use lump sum and Guaranteed Maximum Price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners’ selection of contract arrangement. Project information from Design-build Institute of America (DBIA) database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump sum contract. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently; and qualification-oriented contractor selection process resorts to GMP more often compared with cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to summarise a successfully defended doctoral thesis. The main purpose of this paper is to provide a summary of the scope, and main issues raised in the thesis so that readers undertaking studies in the same or connected areas may be aware of current contributions to the topic. The secondary aims are to frame the completed thesis in the context of doctoral-level research in project management as well as offer ideas for further investigation which would serve to extend scientific knowledge on the topic. Design/methodology/approach – Research reported in this paper is based on a quantitative study using inferential statistics aimed at better understanding the actual and potential usage of earned value management (EVM) as applied to external projects under contract. Theories uncovered during the literature review were hypothesized and tested using experiential data collected from 145 EVM practitioners with direct experience on one or more external projects under contract that applied the methodology. Findings – The results of this research suggest that EVM is an effective project management methodology. The principles of EVM were shown to be significant positive predictors of project success on contracted efforts and to be a relatively greater positive predictor of project success when using fixed-price versus cost-plus (CP) type contracts. Moreover, EVM's work-breakdown structure (WBS) utility was shown to positively contribute to the formation of project contracts. The contribution was not significantly different between fixed-price and CP contracted projects, with exceptions in the areas of schedule planning and payment planning. EVM's “S” curve benefited the administration of project contracts. The contribution of the S-curve was not significantly different between fixed-price and CP contracted projects. Furthermore, EVM metrics were shown to also be important contributors to the administration of project contracts. The relative contribution of EVM metrics to projects under fixed-price versus CP contracts was not significantly different, with one exception in the area of evaluating and processing payment requests. Practical implications – These results have important implications for project practitioners, EVM advocates, as well as corporate and governmental policy makers. EVM should be considered for all projects – not only for its positive contribution to project contract development and administration, for its contribution to project success as well, regardless of contract type. Contract type should not be the sole determining factor in the decision whether or not to use EVM. More particularly, the more fixed the contracted project cost, the more the principles of EVM explain the success of the project. The use of EVM mechanics should also be used in all projects regardless of contract type. Payment planning using a WBS should be emphasized in fixed-price contracts using EVM in order to help mitigate performance risk. Schedule planning using a WBS should be emphasized in CP contracts using EVM in order to help mitigate financial risk. Similarly, EVM metrics should be emphasized in fixed-price contracts in evaluating and processing payment requests. Originality/value – This paper provides a summary of cutting-edge research work and a link to the published thesis that researchers can use to help them understand how the research methodology was applied as well as how it can be extended.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Australian Government and most Australian road authorities have set ambitious greenhouse gas emission (GHGe) reduction targets for the near future, many of which have translated into action plans. However, previous research has shown that the various Australian state road authorities are at different stages of implementing ‘green’ initiatives in construction planning and development, with considerable gaps in their monitoring, tendering, and contracting. This study illustrates the differences between procurement standards and project specific practices that aim to reduce GHGe from road construction projects in three of the largest Australian road construction clients, with a focus on the tools used, contract type and incentives for better performance.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The present study aims to analyze the nurse s work process at Family Health Strategy, considering its basic elements and dynamic, and searching to identify aspects that may constitute strengths and weaknesses in its development. This is an analytical case study, with qualitative approach and theoretical-conceptual mark grounded in Dialectic Hermeneutics. Empirical research fields were the Family Health Units of Natal, RN, Brazil. The subjects are nurses working in this Strategy. Data collection was conducted through semi-structured individual interviews combined with field observation. The research was initiated after approval by the Ethics Committee of Universidade Federal do Rio Grande do Norte, according to the guidelines and rules for research involving humans (Resolution 466/12), ensuring proper ethical precepts. The project was approved by register number 398.929, CAAE 19588813.7.0000.5537. From the 9 interviewed nurses, 8 were female and 1 male, average age of 52 years, average graduation time of 27 years and average time they stayed at the same Family Health territory of 7 years. It was found that it is up to the professional nurse in the Family Health care the important role of taking care of human beings in their life, family and community contexts, producing conditions to meet their needs through therapeutic act in health, using for such purpose both materials and immaterial instruments. It was possible to relate aspects that characterize strengths and weaknesses in the work process of nurses in the ESF, according to the speech of the interviewed workers, including the meanings and contradictions. Among the potentialities observed, it was possible to highlight the wide role of the nurse at Family Health; the perception of nurses about teamwork; the relative autonomy of nurses; the commitment of professionals to work; Humanization as a technology; the presence of other agents at work, such as directors and officers at the primary health units; the professional s experience time and contract type in the case studied. As weaknesses in the work process of nurses at Family Health Strategy, were highlighted the limited skills of the workforce; the difficulty in 10 identifying specific limits of the work of nurses in this scenario; the disturbances that occur in the process, the existing gaps in multiprofessional teams; Structural deficits of the units in the studied case, the low coverage of the Family Health in the county, and the political vulnerability of the work conditions. It is considered necessary to understand the dilemmas experienced in everyday life of nurses at Family Health Strategy as part of multiprofessional teams, facing actual achievement of changes in work processes necessary for the reorientation of health care in Brazil. In accordance, it is necessary to promote proper working conditions and welfare of labor agents which are protagonists the work at the United Health System

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Non-monotone incentive structures, which - according to theory - are able to induce optimal behavior, are often regarded as empirically less relevant for labor relationships. We compare the performance of a theoretically optimal non-monotone contract with a monotone one under controlled laboratory conditions. Implementing some features relevant to real-world employment relationships, our paper demonstrates that, in fact, the frequency of income-maximizing decisions made by agents is higher under the monotone contract. Although this observed behavior does not change the superiority of the non-monotone contract for principals, they do not choose this contract type in a significant way. This is what we call the monotonicity puzzle. Detailed investigations of decisions provide a clue for solving the puzzle and a possible explanation for the popularity of monotone contracts.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Doutoramento em Gestão.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper extends the build-operate-transfer (BOT) concession model (BOTCcM) to a new method for identifying a concession period by using bargaining-game theory. Concession period is one of the most important decision variables in arranging a BOT-type contract, and there are few methodologies available for helping to determine the value of this variable. The BOTCcM presents an alternative method by which a group of concession period solutions are produced. Nevertheless, a typical weakness in using BOTCcM is that the model cannot recommend a specific time span for concessionary. This paper introduces a new method called BOT bargaining concession model (BOTBaC) to enable the identification of a specific concession period, which takes into account the bargaining behavior of the two parties concerned in engaging a BOT contract, namely, the investor and the government concerned. The application of BOTBaC is demonstrated through using an example case.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The psychological contract has emerged over the past 60 years as a key analytical device for both academics and practitioners to conceptualise and explain the employment relationship. However, despite the recognised import of this field, some authors suggest it has fallen into a ‘methodological rut’ and is neglecting to empirically assess basic theoretical tenets of the concept – such as the temporal and individualised, subjective nature of the construct. This paper describes the research design of a longitudinal, mixed methods study to explore development and change in the psychological contract and outline how the use of individual growth modelling can be a powerful tool in analysing the type of quantitative data collected. Finally, by briefly outlining the benefits of this approach, the paper seeks to offer an alternative methodology to explore the dynamic and intra-individual processes within the psychological contract domain.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The type of contract model may have a significant influence on achieving project objectives, including environmental and climate change goals. This research investigates non-standard contract models impacting greenhouse gas emissions (GHG) in transport infrastructure construction in Australia. The research is based on the analysis of two case studies: an Early Contractor Involvement (ECI) contract and a Design and Construct (D&C) contract with GHG reduction requirements embedded in the contractor selection. Main findings support the use of ECIs for better integrating decisions made during the planning phase with the construction activities, and improve environmental outcomes while achieving financial and time savings. Key words: greenhouse gases reduction; road construction; contracting; ECI; D&C

Relevância:

30.00% 30.00%

Publicador:

Resumo:

For necessary goods like water, under supply constraints, fairness considerations lead to negative externalities. The objective of this paper is to design an infinite horizon contract or relational contract (a type of long-term contract) that ensures self-enforcing (instead of court-enforced) behaviour by the agents to mitigate the externality due to fairness issues. In this contract, the consumer is induced to consume at firm-supply level using the threat of higher fair price for future time periods. The pricing mechanism, computed in this paper, internalizes the externality and is shown to be economically efficient and provides revenue sufficiency.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It is revealed from first-principles calculations that polarization-induced asymmetric distribution of oxygen vacancies plays an important role in the insulating behavior at p-type LaAlO3/SrTiO3 interface. The formation energy of the oxygen vacancy (V-O) is much smaller than that at the surface of the LaAlO3 overlayer, causing all the carriers to be compensated by the spontaneously formed V-O's at the interface. In contrast, at an n-type interface, the formation energy of V-O is much higher than that at the surface, and the V-O's formed at the surface enhance the carrier density at the interface. This explains the puzzling behavior of why the p-type interface is always insulating but the n-type interface can be conducting.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Amphibian skin secretions represent a unique resource for the discovery of new bioactive peptides. Here we report the isolation, structural and functional characterization of a novel heptapeptide amide, DMSPPWHamide, from the defensive skin secretion of the Mexican giant leaf frog, Pachymedusa dacnicolor. This peptide is of unique primary structure and has been classified as a member of the rather heterogenous tryptophyllin-2 (T-2) family of amphibian skin peptides and named P. dacnicolor Tryptophyllin-2 (PdT-2) in accordance. PdT-2 is the first Type 2-tryptophyllin to possess discrete bioactivity. Both natural and synthetic replicates of the peptide were found to contract the smooth muscle of rat urinary bladder, the latter displaying an EC50 of 4 nM.