991 resultados para construction efficiency


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a study on applying an integrated Global Position System (GPS) and Geographacial Information System (GIS) technology to the reduction of construction waste. During the study, a prototype study is developed from automatic data capture system such as the barcoding system for construction material and equipment (M&E) management onsite, whilst the integrated GPS and GIS technology is combined to the M&E system based on the Wide Area Network (WAN). Then, a case study is conducted to demonstrate the deployment of the system. Experimental results indicate that the proposed system can minimize the amount of onsite material wastage.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The goal of this research project is to develop specific BIM objects for temporary construction activities which are fully integrated with object design, construction efficiency and safety parameters. Specifically, the project will deliver modularised electronic scaffolding and formwork objects that will allow designers to easily incorporate them into BIM models to facilitate smarter and safer infrastructure and building construction. This research first identified there is currently a distinct lack of BIM objects for temporary construction works resulting in productivity loss during design and construction, and opportunities for improved consideration of safety standards and practices with the design of scaffolding and formwork. This is particularly relevant in Australia, given the “harmonisation” of OHS legislation across all states and territories from 1 January 2012, meaning that enhancements to Queensland practices will have direct application across Australia. Thus, in conjunction with government and industry partners in Queensland, Australia, the research team developed a strategic three-phase research methodology: (1) the preliminary review phase on industrial scaffolding and formwork practices and BIM implementation; (2) the BIM object development phase with specific safety and productivity functions; and (3) the Queensland-wide workshop phase for product dissemination and training. This paper discusses background review findings, details of the developed methodology, and expected research outcomes and their contributions to the Australian construction industry.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In 1974 Dr D M Bramwell published his research work at the University of Aston a part of which was the establishment of an elemental work study data base covering drainage construction. The Transport and Road Research Laboratory decided to, extend that work as part of their continuing research programme into the design and construction of buried pipelines by placing a research contract with Bryant Construction. This research may be considered under two broad categories. In the first, site studies were undertaken to validate and extend the data base. The studies showed good agreement with the existing data with the exception of the excavation trench shoring and pipelaying data which was amended to incorporate new construction plant and methods. An inter-active on-line computer system for drainage estimating was developed. This system stores the elemental data, synthesizes the standard time of each drainage operation and is used to determine the required resources and construction method of the total drainage activity. The remainder of the research was into the general topic of construction efficiency. An on-line command driven computer system was produced. This system uses a stochastic simulation technique, based on distributions of site efficiency measurements to evaluate the effects of varying performance levels. The analysis of this performance data quantities the variability inherent in construction and demonstrates how some of this variability can be reconciled by considering the characteristics of a contract. A long term trend of decreasing efficiency with contract duration was also identified. The results obtained from the simulation suite were compared to site records collected from current contracts. This showed that this approach will give comparable answers, but these are greatly affected by the site performance parameters.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A series of significant oil-gas exploration progresses have been achieved in Nanpu depression with 1.02 billion ton oil-gas reserves have been proven. It has been confirmed that Nanpu beach has a geologic condition to be a major field based on exhaustive research. This finding, which is integrated reservoir,great reserves, thick oil layer and high productivity in Nanpu depression, is the most excited success in Chinese oil-gas exploration in recent years. This abundant oilfield found is significant to the strategy of oil production stability in the east of China. Nanpu depression exploration is also a crucial exploration project for Petrochina. Based on the comprehensive research on Nanpu formation testing data, we reevaluate and analyze the reservoir property and the structure characteristics, and propose a series of testing technique that are suitable for Jidong oil field development. The results are summarized as follows: 1. The reservoir parameters and characters are defined by formation test data interpretation and systemic dynamic-static data comparison. 2. Based on sources analysis and statistical research related to formation contaminants, some technique measures, which can not only prevent or reduce invasion damage for different formations but also can effectively improve completion efficiency, are proposed. 3. By selecting the testing pressure drawdown, optimum working regulation and flow /shut-in duration, and adopting dynamic-static flow parameters correlation analysis to predict production, an optimum research on working regulation and flow /shut-in duration was accomplished. Optimization formation test principles suitable for any kinds of Nanpu oilfield are established, which can improve test quality, construction efficiency and data recording quality. 4. By reasonable selection of perforating gun and penetrating charge, the perforation penetration has been improved effectively and the flow channel of the oil gas have been expanded, so that the communication between formations and the wellbore is improved better. 5. One joint working procedure which combining formation test, perforation, unloading and stimulation treatment has become the dominant testing technology in the Nanpu offshore Oilfield. This combination technique can implement several procedures using one pipe string, and achieve rapid testing purpose.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper describes a conceptual approach to measure and compare productivity of resource utilization at the firm level, adapting a set of techniques known as Data Envelopment Analysis (DEA). Within this approach, the paper addresses the issues of multiple inputs and multiple outputs of a construction firm, level of detail for data collection, and the required transformations to correct for differences among projects. In particular, we focus on the resource management of subcontractors. Subcontractors manage multiple, concurrent projects and must allocate limited resources across these projects. Interaction between projects and resource allocation creates non-linear effects, and therefore the productivity of the firm is not simply the productivity of its projects. The proposed measurement methodology will allow assessment of the impact of different management policies (including many of those proposed by lean construction researchers) on firm performance. It is hoped that this novel approach to productivity measurement will help subcontractors identify efficient practices and superior management policies, and will promote adoption of these policies.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a rare insight into the motivation behind first-time buyers when looking to purchase their first home. The factors driving demand preferences for detached housing are constantly changing and difficult to measure, and often deemed to be a complex bundle of attributes.

Design/methodology/approach –
The research in this paper is based on interviews with purchasers at a series of locations across Melbourne, Australia, who were actively seeking to purchase a home for the first time. The data were analysed using factor analysis to identify the core decision criteria in a new house that were most sought after.

Findings – The findings in this paper confirmed that “financial” issues accounted for approximately 30 percent of the actual decision by first-time buyers to purchase housing, where decisions relating to the timing and choice of housing are dependent on “site-specific” factors.

Research limitations/implications –
The research in this paper is aimed specifically at first time buyers only and the influencing factors behind their purchasing decisions.

Practical implications – The paper shows that, if consideration is given to the characteristics that first-time owners are looking for, providers of new housing would be better equipped to meet this demand and maximise construction efficiency.

Originality/value –
In the paper the emphasis was placed on identifying and analysing the decision criteria behind first-time buyers, which provided an invaluable insight into their concept of a suitable residence. Rather than analysing sales transactions after they have been completed, this research considers aspects of new houses that first-time owners are actively searching for, prior to making their purchase.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper will summarise the findings from a study that explored the link between dwelling design, or type, and energy efficiencies in sub-tropical climates. An increasing number of government and private sector development companies are initiating projects that aim to deliver enhanced environmental outcomes at both sub-divisional and dwelling levels. The study used AccuRate, a new thermal modelling tool developed by CSIRO that responds to the need to improve ventilation modelling. The study found that dwellings developed in conjunction with the Departments of Housing and Public Works have set the benchmark. It provides a snapshot of the energy efficiency of a range of dwelling types found in recent subdivisions. However, the trend toward increasing urban densities may reduce the likelihood that cooling breezes will be available to cool dwellings. The findings are relevant to regulators, designers and industry in all states interested in reducing the energy used to cool dwellings in summer.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Background and Aims: Success of invasive plant species is thought to be linked with their higher leaf carbon fixation strategy, enabling them to capture and utilize resources better than native species, and thus pre-empt and maintain space. However, these traits are not well-defined for invasive woody vines. Methods: In a glass house setting, experiments were conducted to examine how leaf carbon gain strategies differ between non-indigenous invasive and native woody vines of south-eastern Australia, by investigating their biomass gain, leaf structural, nutrient and physiological traits under changing light and moisture regimes. Key Results: Leaf construction cost (CC), calorific value and carbon : nitrogen (C : N) ratio were lower in the invasive group, while ash content, N, maximum photosynthesis, light-use efficiency, photosynthetic energyuse efficiency (PEUE) and specific leaf area (SLA) were higher in this group relative to the native group. Trait plasticity, relative growth rate (RGR), photosynthetic nitrogen-use efficiency and water-use efficiency did not differ significantly between the groups. However, across light resource, regression analyses indicated that at a common (same) leaf CC and PEUE, a higher biomass RGR resulted for the invasive group; also at a common SLA, a lower CC but higher N resulted for the invasive group. Overall, trait co-ordination (using pair-wise correlation analyses) was better in the invasive group. Ordination using 16 leaf traits indicated that the major axis of invasive-native dichotomy is primarily driven by SLA and CC (including its components and/or derivative of PEUE) and was significantly linked with RGR. Conclusions: These results demonstrated that while not all measures of leaf resource traits may differ between the two groups, the higher level of trait correlation and higher revenue returned (RGR) per unit of major resource need (CC) and use (PEUE) in the invasive group is in line with their rapid spread where introduced.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The aim of the research outlined in this paper is to develop a best practice process model for building projects based on the use of an expert system. The CONstruction Best Practice System (CONBPS) focusses on projects which are based on the traditional procurement strategy, using the JCT 80 standard form of contract. The model clearly identifies the sequence of construction activities. It also identifies the roles and responsibilities of the major parties on the building team and the issues within the project cycle, which can prove critical to project success. The system incorporates many user-friendly functions, including the provision of multi-choice icons and the provision of an on-line help function. Besides, it also provides interim and final reports which are used to advise the participants on the success factors that they have ignored and to which aspects they should pay more attention. A framework was initially developed focussing on the whole design process with a full knowledge-based system developed for the Inception Stage. CONBPS can be used as a teaching/learning tool to assist teachers and students to better understand the construction process. Also, it could prove useful to project managers and all the participants in the construction process.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The efficiency of the construction industry is analyzed based on provinces panel data in China in this paper. The Mean Number of Employee and the Mean Completed Investment are used as inputs. The Mean Actual Sales of Commercial Houses and the Mean Net Profit are used as outputs. Data Envelopment Analysis (DEA) model is used to measure the efficiency of the construction industry. Shanghai and Zhejiang are found technically efficient. Shandong is scale efficient but technology efficiency is lower. There are two provinces are decreasing returns to scale and other provinces are increasing returns to scale. On the whole, the technology efficiency of the construction industry of China is lower. Based on the conclusions, the paper proposes some suggestions to improve the efficiency of the construction industry in China.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trialed. Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.