南堡油田测试资料综合评价及试油配套工艺技术研究与应用
Contribuinte(s) |
杨长春 |
---|---|
Data(s) |
13/06/2007
|
Resumo |
A series of significant oil-gas exploration progresses have been achieved in Nanpu depression with 1.02 billion ton oil-gas reserves have been proven. It has been confirmed that Nanpu beach has a geologic condition to be a major field based on exhaustive research. This finding, which is integrated reservoir,great reserves, thick oil layer and high productivity in Nanpu depression, is the most excited success in Chinese oil-gas exploration in recent years. This abundant oilfield found is significant to the strategy of oil production stability in the east of China. Nanpu depression exploration is also a crucial exploration project for Petrochina. Based on the comprehensive research on Nanpu formation testing data, we reevaluate and analyze the reservoir property and the structure characteristics, and propose a series of testing technique that are suitable for Jidong oil field development. The results are summarized as follows: 1. The reservoir parameters and characters are defined by formation test data interpretation and systemic dynamic-static data comparison. 2. Based on sources analysis and statistical research related to formation contaminants, some technique measures, which can not only prevent or reduce invasion damage for different formations but also can effectively improve completion efficiency, are proposed. 3. By selecting the testing pressure drawdown, optimum working regulation and flow /shut-in duration, and adopting dynamic-static flow parameters correlation analysis to predict production, an optimum research on working regulation and flow /shut-in duration was accomplished. Optimization formation test principles suitable for any kinds of Nanpu oilfield are established, which can improve test quality, construction efficiency and data recording quality. 4. By reasonable selection of perforating gun and penetrating charge, the perforation penetration has been improved effectively and the flow channel of the oil gas have been expanded, so that the communication between formations and the wellbore is improved better. 5. One joint working procedure which combining formation test, perforation, unloading and stimulation treatment has become the dominant testing technology in the Nanpu offshore Oilfield. This combination technique can implement several procedures using one pipe string, and achieve rapid testing purpose. |
Identificador | |
Idioma(s) |
中文 |
Fonte |
南堡油田测试资料综合评价及试油配套工艺技术研究与应用.刘铮[d].中国科学院地质与地球物理研究所,2007.20-25 |
Palavras-Chave | #南堡凹陷 #物性及构造 #储层污染 #工作制度优化 #试油配套技术 |
Tipo |
学位论文 |