822 resultados para construction business


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Searching academic databases for records on ‘business failure’, ‘business distress’ or ‘bankruptcy’ yields a large body of studies on qualitative, empirical, theoretical and simulation aspects. It is a central part of this research to distil from this large quantity of potentially relevant reports and methodologies those which can both flag and predict business failure in the construction industry. An additional search term, such as, ‘construction’, ‘construction industry’ or ‘contractor’ yields a much smaller number of hits, many of which emphasize the construction industry’s distinctive characteristics. We scientists need first to understand the subject of investigation and the environment in which it lives. To do so, an analysis of existing successful and failed approaches to particular research questions is helpful before embarking on new territory. This guides the structure of the following report for we first review papers that specifically report on aspects of business failure in the construction industry followed by, (a) an overview of promising candidates borrowed from other disciplines and industries, and (b) a possible novel approach. An Australian (Queensland) perspective on the topic will also drive this investigation as most of the published research has been applied to the US and UK construction industries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction firms are increasingly utilizing information technologies to better manage geographically dispersed projects. Often these technologies involve changes to existing working practices and processes and are viewed as disruptive by members of the organization. Understanding the factors that can influence individuals’ intention to utilize technology can assist managers to implement strategies to increase and improve the uptake of technologies and improve the innovation adoption process. Using a case study organization, factors identified in the Unified Theory of Acceptance and Use of Technology (UTAUT) are examined and the UTAUT is extended and by including resistance to change and top management support. The findings indicate effort expectancy, internal facilitating conditions and top management support all influence individuals’ intention to use information technology. The results also show that resistance to change or fear of change does not always play a role in innovation adoption. The findings reinforce the need to support new technologies from both a managerial and technical perspective.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction projects are a high risk business activity. When undertaking projects in an international context, it is further complicated by the risk of fluctuations in the foreign exchange rates (FOREX). Construction business performance is affected by these fluctuations. They affect progress and cause delays, which in turn create problems for subcontractors, namely cost overruns, disputes, arbitration, total abandonment and litigation. FOREX fluctuations also cause the price of raw materials to increase, leading the cost overruns. Managing FOREX risk is critical and past research have focused on the need for adequate insurance, careful planning and management, and foreign exchange futures hedging to overcome issues that have been caused by the FOREX risk. Analysis of FOREX risk in international construction business usually focused only on issues at the project level. There is currently lack of understanding of Organisational Capabilities (OC) to manage the impacts of FOREX risk, which when examined, are seen in isolation. This paper attempts to bridge the gap by discussing the impacts of FOREX fluctuations on the international construction business. The focus is on the OC perspective and the need to develop OC framework to mitigate the risk in sustaining construction business performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Promoting safety management is always the top priority in construction business. Fostering safety culture will be one of the most effective ways. This paper is a case study, based upon the “Geller’s 10 principles for achieving a total safety culture”, to review how a construction companyin Hong Kong effectively promoting safety culture and enjoying pleasant safety records. Zero harmis not a “zero sum game”, but it requires positive “top down” and “bottom up” actions from both employers and employees.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper focuses on the development and delivery of a core construction management (CM) unit, which forms the capstone of a four-unit CM stream in an undergraduate programme in the Faculty of Built Environment and Engineering at the Queensland University of Technology. UDB410 (Construction Management) is a final year unit that consolidates skills students have learned throughout their degree, hopefully graduating them as work-ready construction managers. It was developed in consultation with the Queensland Chapter of the Australian Institute of Building (AIB) and is a final year unit in the undergraduate Bachelor of Urban Development (CM) course. The unit uses various tools such as the OSIRIS business database (Bureau van Dijk Electronic Publishing, 2009), the AROUSAL (UK Version) construction business simulation (Lansley, 2009) and the Denison Organisational Culture Survey (Denison, 2000) to facilitate the development of skills in managing a construction company. The objectives of the paper are: • To track the rationale and development of the UDB410 unit sand describe the way in which this final year unit integrates learning from other parts of the course within which it is located as well as capping-off the CM stream of core units; • To highlight the difficulties of blending a balance of technology and management in a single unit; and • To explain how partnering with the construction industry benefited the learning quality of the unit.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The issue of ensuring that construction projects achieve high quality outcomes continues to be an important consideration for key project stakeholders. Although a lot of quality practices have been done within the industry, establishment and achievement of reasonable levels of quality in construction projects continues to be a problem. While some studies into the introduction and development of quality practices and stakeholder management in the construction industry have been undertaken separately, no major studies have so far been completed that examine in depth how quality management practices that specifically address stakeholders’ perspectives of quality can be utilised to contribute to the ultimate constructed quality of projects. This paper encompasses and summarizes a review of the literature related to previous research undertaken on quality within the industry, focuses on the benefits and shortcomings, together with examining the concept of integrating stakeholder perspectives of project quality for improvement of outcomes throughout the project lifecycle. Findings discussed in this paper reveal a pressing need for investigation, development and testing of a framework to facilitate better implementation of quality management practices and thus achievement of better quality outcomes within the construction industry. The framework will incorporate and integrate the views of stakeholders on what constitutes final project quality to be utilised in developing better quality management planning and systems aimed ultimately at achieving better project quality delivery.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Many construction industry decision-makers believe there is a lack of off-site manufacture (OSM) adoption for non-residential construction in Australia. Identification of construction business process was considered imperative in order to assist decision-makers to increase OSM utilisation. The premise that domain knowledge can be re-used to provide an intervention point in the construction process led a team of researchers to construct simple base-line process models for the complete construction process, segmented into six phases. Sixteen domain knowledge industry experts were asked to review the construction phase base-line models to answer the question “Where in the process illustrated by this base-line model phase is an OSM task?”. Through an iterative and generative process a number of off-site manufacture intervention points were identified and integrated into the process models. The re-use of industry expert domain knowledge provided suggestions for new ways to do basic tasks thus facilitating changes to current practice. It is expected that implementation of the new processes will lead to systemic industry change and thus a growth in productivity due to increased adoption of OSM.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The productivity of the construction industry has a significant effect on national economic growth. Gains from higher construction productivity flow through the economy, as all industries rely on construction to some extent as part of their business investment. Contractions and expansions of economic activity are common phenomena in an economy. Three construction cycles occurred between the years 1970 and 2011 in Malaysia. The relationships between construction productivity and economic development are examined by the partial correlation method to establish the underlying factors driving the change in construction productivity. Construction productivity is statistically significantly correlated with gross domestic product (GDP) per capita in a positive direction for the 1985–98 and 1998–2009 cycles, but not the 1970–85 cycle. Fluctuations in construction activities and the influx of foreign workers underlie the changes of construction productivity in the 1985–98 cycle. There was less fluctuation in construction activities in the 1998–2009 cycle, with changes being mainly due to the fiscal stimulation policies of the government in attempting to stabilize the economy. The intensive construction of mega-projects resulted in resource constraints and cost pressures during the 1980s and 1990s. A better management of the ‘boom-bust’ nature of the construction business cycle is required to maintain the capability and capacity of the industry.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction projects have a negative impact on the environment. As Malaysia is planning more construction projects to cater for its current and future development needs, practitioners are urged to undertake greener approaches to construction. One of the efforts is the introduction of green procurement, which is promoted under the Malaysian Government’s MyHijau initiative. Construction procurement is recognised as a tool to shift the construction business into a greener industry. However, the implementation of green procurement in Malaysia is still in its infancy and faces a number of challenges, such as the lack of knowledge. A significant gap has been found between policy formulation and actual project delivery as there are no practical guidelines for stakeholders to procure environmental-friendly construction projects. To address this problem, the present research (as part of an ongoing PhD project) aims to develop a green procurement framework that guides stakeholders in procuring green projects in Malaysia. This article highlights the concept of green procurement in Malaysia, the work carried out to date to achieve the research objectives and the preliminary framework that has been established. It is hoped that this research will help academics and practitioners to further explore the potential of green procurement to improve sustainability in the current construction industry practices.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Services are very important to the UK balance of trade; a surplus has been recorded for trade in services every year since 1966. Construction professional services exports (CPS), which cover architecture, engineering and surveying (AES), have also increased, contributing over £3bn to the UK trade balance in 2007. The changing environment of construction professional services exports complicates the validity of the characteristics and definitions of services as described in the research literature and official export statistics. Through semi-structured interviews undertaken with large consulting engineers and a round-table discussion with industry and government representatives, the research found that the impact of globalisation and the changes in the construction business environment, such as increasing foreign ownership and changing forms of procurement, are not fully reflected in the official statistics. There have also been rapid changes in technology, procurement and methods of delivery which have impacted exporting AES firms and a more appropriate set of characteristics is needed to better reflect the project-specific and knowledge-intensive nature of AES firms.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

There is limited understanding of the role of services in the wave of globalisation and how the strengths of the UK service sector help to respond to the challenge of global competition. The way in which the construction export data are collected does not reflect the impact of globalisation and the changes in the construction business environment, such as increasing foreign ownership, foreign affiliates, and changing forms of procurement. The paper describes construction service exports, how they are collected and classified, highlighting the challenges of recording the export performance of construction services in a changing world. A case for change is made to ensure the collection of statistics better reflects the role of construction professional services

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction professional services (CPSs), such as architecture, engineering, and consultancy, are not only high value-added profit centers in their own right but also have a knock-on effect on other businesses, such as construction and the export of materials and machinery. Arguably, competition in the international construction market has shifted to these knowledge-intensive CPS areas. Yet CPSs represent a research frontier that has received scant attention. This research aims to enrich the body of knowledge on CPSs by examining strengths, weaknesses, opportunities, and threats (SWOT) of Chinese CPSs (CCPSs) in the international context. It does so by triangulating theories with quantitative and qualitative data gleaned from yearbooks, annual reports, interviews, seminars, and interactions with managers in major CCPS companies. It is found that CCPSs present both strengths and weaknesses in talents, administration systems, and development strategies in dealing with the external opportunities and threats brought about by globalization and market evolution. Low price, which has helped the Chinese construction business to succeed in the international market, is also a major CCPS strength. An opportunity for CCPSs is the relatively strong delivery capability possessed by Chinese contractors; by partnering with them CCPSs can better establish themselves in the international arena. This is probably the first ever comprehensive study on the performance of CCPSs in the international marketplace. The research is conducted at an opportune time, particularly when the world is witnessing the burgeoning force of Chinese businesses in many areas including manufacturing, construction, and, potentially, professional services. It adds new insights to the knowledge body of CPSs and provides valuable references to other countries faced with the challenge of developing CPS business efficiently in the international market.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In contrast to their bustling construction counterparts, Chinese construction professional services (CPS) such as architecture, engineering, and consultancy, seem still to be stagnant in the international market. CPS are not only high value-added profit centers in their own right, but also have a knock-on effect on subsequent businesses such as construction, and the export of materials and machinery. Arguably, competition in the international construction market has shifted to knowledge-intensive CPS. Yet,CPS represent a research area that has been paid scant attention. This research aims to add to the body of knowledge of CPS by examining strengths, weaknesses, opportunities, and threats (SWOT) of Chinese CPS (CCPS) in the international context. It does so by triangulating theories with quantitative and qualitative data gleaned from yearbooks, annual reports, interviews, seminars, and interactions with managers in major CCPS companies. It is found that CCPS present both strengths and weaknesses in talents, administration systems, and development strategies in dealing with the external opportunities and threats brought about by globalization and market evolvement. Low price, which has helped the Chinese construction business to succeed in the international market, is also a CCPS major strength. An opportunity for CCPS is the relatively strong delivery capability possessed by Chinese contractors. By partnering with them CCPS can better edge into the international arena. This is probably the first ever comprehensive study in investigating the performance of CCPS in the international market. The research is also timely, particularly when the world is witnessing the burgeoning force of Chinese businesses in many areas including manufacturing, construction, and potentially, professional services.