922 resultados para arbitration proceeding


Relevância:

100.00% 100.00%

Publicador:

Resumo:

AGL Wholesale Gas Ltd v Origin Energy Ltd [2008] QCA 366 involved an appeal against the setting aside of paragraphs of a subpoena issued under s 17 of the Commercial Arbitration Act 1990 (Qld). The Court was satisfied that even if the documents were of “apparent relevance” to the subject matter of the proceedings, it would nevertheless be oppressive to require their production.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Através do presente trabalho, buscar-se-á discorrer sobre o cabimento das tutelas de urgências na esfera do procedimento arbitral, englobando a possibilidade de decretação e execução das medidas urgentes pelo árbitro – seja previamente ou no curso da arbitragem –, a partir da análise dos dispositivos da Lei de Arbitragem (Lei nº 9.307/1996), bem como da doutrina nacional dominante sobre o tema. Tal estudo faz-se relevante na medida em que o processo arbitral vem sendo amplamente utilizado por particulares como meio eficaz de solução de litígios relativos a direitos patrimoniais disponíveis. Todavia, mesmo sendo dotada de maior celeridade do que o provimento judicial, nem sempre a arbitragem conseguirá tutelar o direito material alegado pelas partes até que seja proferida a decisão final de mérito. Assim, em algumas situações, nas quais haja fundado receio de dano irreparável à parte, as medidas de urgência são imprescindíveis a fim de assegurar o direito pleiteado, tornando possível a prolação de uma sentença justa e revestida de utilidade prática. Neste contexto, entende-se o árbitro é dotado de poder jurisdicional para conceder medidas cautelares e antecipatórias que se façam necessárias, ainda que tal poder não esteja expressamente delimitado na convenção de arbitragem. Para efetivá-las, no entanto, precisará recorrer ao Poder Judiciário (monopolizador do poder de coerção) para dar cumprimento às medidas decretadas pelo árbitro, sempre que a parte em face da qual a medida for decretada se recusar a cumprir a determinação arbitral espontaneamente.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Online Nail Artist (ONA) project aims to create a web-based application for nail salon customers. The application will help customers to customize their hands virtually and find suitable nail colors. The main research question is to reconfigure user experience in relation to product service in terms of customization of user needs. As results, the key function of the application will be to customize a virtual hand image by selecting a matched skin tone, a nail length, and a nail shape in accordance with their hands. The objectives of the project proceeding are to 1) identify customers’ experience in relation to the product features through preliminary research on existing products; 2) create a conceptual framework of the project development in order to reflect the user experience identified; and 3) present a mock up which include key features of the ONA for the future development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Section 126 of the Land Title Act 1994 (Qld) regulates whether, and if so, when a caveat will lapse. While certain caveats will not lapse due to the operation of s 126(1), if a caveator does not wish a caveat to which the section applies to lapse, the caveator must start a proceeding in a court of competent jurisdiction to establish the interest claimed under the caveat within the time limits specified in, and otherwise comply with the obligations imposed by, s 126(4). The requirement, in s 126(4), to “start a proceeding” was the subject of judicial examination by the Court of Appeal (McMurdo P, Holmes JA and MacKenzie J) in Cousins Securities Pty Ltd v CEC Group Ltd [2007] QCA 192.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Lambert v Surplice [2004] QDC 092 McGill DCJ considered the extent to which the court should exercise a discretion on an application under s79 of the District Court Act 1967 to transfer a proceeding pending in the Magistrates Court to the District Court.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Lamb v State of Queensland [2003] QDC 003 McGill DCJ considered an application under s43 of the Personal Injuries Proceedings Act 2002. That provision permits the court to give a claimant leave to start a proceeding notwithstanding non-compliance with part 1 of chapter two of the Act, "if the court is satisfied there is an urgent need to start the proceeding."

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Nominal Defendant v Kisse [2001] QDC 290 a person suffered personal injury caused by a motor vehicle in circumstances where there was a cause of action to which the Motor Accident Insurance Act 1994 applied. The person died before taking the steps required under Pt 4 of the Act and before commencing litigation to enforce that cause of action. The decision also involved a costs order against solicitors on an indemnity basis, providing a timely reminder to practitioners of the importance of ensuring they have proper authority before commencing any court proceedings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The ILR Impact Brief series highlights the research and project based work conducted by ILR faculty that is relevant to workplace issues and public policy. Brief #1 highlights the authors' research on employment arbitration, including a survey of the National Academy of Arbitrators.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Multi-access techniques are widely used in computer networking and distributed multiprocessor systems. On-the-fly arbitration schemes permit one of the many contenders to access the medium without collisions. Serial arbitration is cost effective but is slow and hence unsuitable for high-speed multiprocessor environments supporting very high data transfer rates. A fully parallel arbitration scheme takes less time but is not practically realisable for large numbers of contenders. In this paper, a generalised parallel-serial scheme is proposed which significantly reduces the arbitration time and is practically realisable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The dream of pervasive computing is slowly becoming a reality. A number of projects around the world are constantly contributing ideas and solutions that are bound to change the way we interact with our environments and with one another. An essential component of the future is a software infrastructure that is capable of supporting interactions on scales ranging from a single physical space to intercontinental collaborations. Such infrastructure must help applications adapt to very diverse environments and must protect people's privacy and respect their personal preferences. In this paper we indicate a number of limitations present in the software infrastructures proposed so far (including our previous work). We then describe the framework for building an infrastructure that satisfies the abovementioned criteria. This framework hinges on the concepts of delegation, arbitration and high-level service discovery. Components of our own implementation of such an infrastructure are presented.

Relevância:

20.00% 20.00%

Publicador: