963 resultados para Virtual Prototyping, Rapid Prototype, Kinematics, Automotive, Car Carrier


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article reports the details of a research on novel design in the field of semitrailer sector and discuss design by hazard prevention techniques. The novel design made addresses occupational health and safety (OHS)concerns of fall from heights. The research includes a detailed survey of national data sources to examine the fatalities caused due to fall from heights in car carriers. The study investigates OHS recommendations in Australia for semitrailer sector. Often injuries are caused due to drivers working above the 1.5 meter height for loading, unloading of the cars, moving the decks up, down, strapping the cars, and slipperly. The new design is developed using latest computer aided design and engineeing (CAD, CAE), product data management (PDM), virtual design process (VDP). The new car carrier design excels in reducing the risks of injuries to drivers and new bench mark for OHS standards. The new design has all the decks operated with hydraulics and uses unique ratchet lock mechanism (fool proof design) and loading happens at a safe working height (below 1.5 meter). All the cars are strapped on the safe working height, and then car desks operated hydraulically to transfer them to the required position. This also includes the car on the prime mover, which shuttles across from one deck to other using hydraulic and rack-pinion mechanisms. The novel design car carrier solves the problem of falls from height: next step would be to transfer this technology across other similar effected sectors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An important aspect of designing any product is validation. Virtual design process (VDP) is an alternative to hardware prototyping in which analysis of designs can be done without manufacturing physical samples. In recent years, VDP have been generated either for animation or filming applications. This paper proposes a virtual reality design process model on one of the applications when used as a validation tool. This technique is used to generate a complete design guideline and validation tool of product design. To support the design process of a product, a virtual environment and VDP method were developed that supports validation and an initial design cycle performed by a designer. The product model car carrier is used as illustration for which virtual design was generated. The loading and unloading sequence of the model for the prototype was generated using automated reasoning techniques and was completed by interactively animating the product in the virtual environment before complete design was built. By using the VDP process critical issues like loading, unloading, Australian Design rules (ADR) and clearance analysis were done. The process would save time, money in physical sampling and to large extent in complete math generation. Since only schematic models are required, it saves time in math modelling and handling of bigger size assemblies due to complexity of the models. This extension of VDP process for design evaluation is unique and was developed, implemented successfully. In this paper a Toll logistics and J Smith and Sons car carrier which is developed under author’s responsibility has been used to illustrate our approach of generating design validation via VDP.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this study is to detail a virtual and physical prototyping process to overcome a design constraint in the mountain bike industry. Through a series of techniques, 3D scanning, developing detailed CAD models, then through additive manufacturing processes, a solution wasdeveloped. The challenge in the industry is the constant geometrical changes of components; the trend has been that bike cranks are becoming narrower due to biomechanical factors and tyres are becoming wider due to rider preferences and increased grip. This change in geometry results in metal tubes that can no longer be deformed without exceeding the minimum bend radius for the material. As such exceeding the minimum bend radius will induce early performance failure and geometrical (aesthetic) defects. The solution is an additivemanufactured part that can be substituted into the process without disrupting the entire conventional build process of a customised bike build.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – Virtual prototyping technologies linked to building information models are commonplace within the aeronautical and automotive industries. Their use within the construction industry is now emerging. The purpose of this paper is to show how these technologies have been adopted on the pre-tender planning for a typical construction project. Design/methodology/approach – The research methodology taken was an “action research” approach where the researchers and developers were actively involved in the production of the virtual prototypes on behalf of the contractor thereby gaining consistent access to the decisions of the planning staff. The experiences from the case study were considered together with similar research on other construction projects. Findings – The findings from the case studies identify the role of virtual prototyping in components modelling, site modelling, construction equipment modelling, temporary works modelling, construction method visualization and method verification processes. Originality/value – The paper presents a state-of-the-art review and discusses the implications for the tendering process as these technologies are adopted. The adoption of the technologies will lead to new protocols and changes in the procurement of buildings and infrastructure.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Salient pole brushless alternators coupled to IC engines are extensively used as stand-by power supply units for meeting in- dustrial power demands. Design of such generators demands high power to weight ratio, high e ciency and low cost per KVA out- put. Moreover, the performance characteristics of such machines like voltage regulation and short circuit ratio (SCR) are critical when these machines are put into parallel operation and alterna- tors for critical applications like defence and aerospace demand very low harmonic content in the output voltage. While designing such alternators, accurate prediction of machine characteristics, including total harmonic distortion (THD) is essential to mini- mize development cost and time. Total harmonic distortion in the output voltage of alternators should be as low as possible especially when powering very sophis- ticated and critical applications. The output voltage waveform of a practical AC generator is replica of the space distribution of the ux density in the air gap and several factors such as shape of the rotor pole face, core saturation, slotting and style of coil disposition make the realization of a sinusoidal air gap ux wave impossible. These ux harmonics introduce undesirable e ects on the alternator performance like high neutral current due to triplen harmonics, voltage distortion, noise, vibration, excessive heating and also extra losses resulting in poor e ciency, which in turn necessitate de-rating of the machine especially when connected to non-linear loads. As an important control unit of brushless alternator, the excitation system and its dynamic performance has a direct impact on alternator's stability and reliability. The thesis explores design and implementation of an excitation i system utilizing third harmonic ux in the air gap of brushless al- ternators, using an additional auxiliary winding, wound for 1=3rd pole pitch, embedded into the stator slots and electrically iso- lated from the main winding. In the third harmonic excitation system, the combined e ect of two auxiliary windings, one with 2=3rd pitch and another third harmonic winding with 1=3rd pitch, are used to ensure good voltage regulation without an electronic automatic voltage regulator (AVR) and also reduces the total harmonic content in the output voltage, cost e ectively. The design of the third harmonic winding by analytic methods demands accurate calculation of third harmonic ux density in the air gap of the machine. However, precise estimation of the amplitude of third harmonic ux in the air gap of a machine by conventional design procedures is di cult due to complex geome- try of the machine and non-linear characteristics of the magnetic materials. As such, prediction of the eld parameters by conven- tional design methods is unreliable and hence virtual prototyping of the machine is done to enable accurate design of the third har- monic excitation system. In the design and development cycle of electrical machines, it is recognized that the use of analytical and experimental methods followed by expensive and in exible prototyping is time consum- ing and no longer cost e ective. Due to advancements in com- putational capabilities over recent years, nite element method (FEM) based virtual prototyping has become an attractive al- ternative to well established semi-analytical and empirical design methods as well as to the still popular trial and error approach followed by the costly and time consuming prototyping. Hence, by virtually prototyping the alternator using FEM, the important performance characteristics of the machine are predicted. Design of third harmonic excitation system is done with the help of results obtained from virtual prototype of the machine. Third harmonic excitation (THE) system is implemented in a 45 KVA ii experimental machine and experiments are conducted to validate the simulation results. Simulation and experimental results show that by utilizing third harmonic ux in the air gap of the ma- chine for excitation purposes during loaded conditions, triplen harmonic content in the output phase voltage is signi cantly re- duced. The prototype machine with third harmonic excitation system designed and developed based on FEM analysis proved to be economical due to its simplicity and has the added advan- tage of reduced harmonics in the output phase voltage.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Life-cycle management (LCM) has been employed in the management of construction projects for many years in order to reduce whole life cost, time, risk and improve the service to owners. However, owing to lack of an effective information sharing platform, the current LCM of construction projects is not effectively used in the construction industry. Based upon the analysis of the information flow of LCM, a virutal prototyping (VP)-based communication and collaboration information platform is proposed. Following this, the platform is customized using DASSAULT sofware. The whole process of implementing the VP-based LCM are also discussed and, from a simple case study, it is demonstrated that the VP-based communication and collaboration information platform is an effective tool to support the LCM of construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: The construction industry is well known for its high accident rate and many practitioners consider a preventative approach to be the most important means of bringing about improvements. This paper addresses previous research and the weaknesses of existing preventative approaches and a new application is described and illustrated involving the use of a multi-dimensional simulation tool - Construction Virtual Prototyping (CVP). Methodology: A literature review was conducted to investigate previous studies of hazard identification and safety management and to develop the new approach. Due to weaknesses in current practice, the research study explored the use of computer simulation techniques to create virtual environments where users can explore and identify construction hazards. Specifically, virtual prototyping technology was deployed to develop typical construction scenarios in which unsafe or hazardous incidents occur. In a case study, the users’ performance was evaluated their responses to incidents within the virtual environment and the effectiveness of the computer simulation system established though interviews with the safety project management team. Findings: The opinions and suggestions provided by the interviewees led to the initial conclusion that the simulation tool was useful in assisting the safety management team’s hazard identification process during the early design stage. Originality: The research introduces an innovative method to support the management teams’ reviews of construction site safety. The system utilises three-dimensional modelling and four-dimensional simulation of worker behaviour, a configuration that has previously not been employed in construction simulations. An illustration of the method’s use is also provided, together with a consideration of its strengths and weaknesses.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

4D simulation, building information modeling, virtual construction, computer simulation and virtual prototyping are emerging topics in the building construction industry. These techniques not only relate to the buildings themselves, but can also be applied to other forms of construction, including bridges. Since bridge construction is a complex process involving multiple types of plant and equipment, applying such virtual methods benefits the understanding of all parties in construction practice. This paper describes the relationship between temporary platforms, plant and equipment resources and a proposed-built model in the construction planning and use of Virtual Prototyping Simulation (VPS) to implement different construction scenarios in order to help planners identify an optimal construction plan. A case study demonstrates the use of VPS integrated with temporary platform design and plant and equipment-resource allocation to generate different construction scenarios.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – Rehearsing practical site operations is without doubt one of the most effective methods for minimising planning mistakes, because of the learning that takes place during the rehearsal activity. However, real rehearsal is not a practical solution for on-site construction activities, as it not only involves a considerable amount of cost but can also have adverse environmental implications. One approach to overcoming this is by the use of virtual rehearsals. The purpose of this paper is to investigate an approach to simulation of the motion of cranes in order to test the feasibility of associated construction sequencing and generate construction schedules for review and visualisation. Design/methodology/approach – The paper describes a system involving two technologies, virtual prototyping (VP) and four-dimensional (4D) simulation, to assist construction planners in testing the sequence of construction activities when mobile cranes are involved. The system consists of five modules, comprising input, database, equipment, process and output, and is capable of detecting potential collisions. A real-world trial is described in which the system was tested and validated. Findings – Feedback from the planners involved in the trial indicated that they found the system to be useful in its present form and that they would welcome its further development into a fully automated platform for validating construction sequencing decisions. Research limitations/implications – The tool has the potential to provide a cost-effective means of improving construction planning. However, it is limited at present to the specific case of crane movement under special consideration. Originality/value – This paper presents a large-scale, real life case of applying VP technology in planning construction processes and activities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Products manufactured by the electronics sector are having a major impact in telecommunications, transportation space applications, biomedical applications, consumer products, intelligent hand held devices, and of course,the computer. Demands from end-users in terms of greater product functionality, adoption of environmentally friendly materials, and further miniaturization continually pose several challenges to electronics companies. In the context of electronic product design and manufacture, virtual prototying software tools are allowing companies to dramatically reduce the number of phsysical prototypes and design iterations required in product development and hence reduce costs and time to market. This paper details of the trends in these technolgies and provides an example of their use for flip-chip assembly technology.