Optimizing construction planning schedules by virtual prototyping enabled resource analysis


Autoria(s): Li, Heng; Chan, Neo; Guo, H.L.; Lu, Weisheng; Skitmore, Martin
Data(s)

07/11/2009

Resumo

The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.

Formato

application/pdf

Identificador

http://eprints.qut.edu.au/29465/

Publicador

Elsevier

Relação

http://eprints.qut.edu.au/29465/1/29465.pdf

DOI:10.1016/j.autcon.2009.04.002

Li, Heng, Chan, Neo, Guo, H.L., Lu, Weisheng, & Skitmore, Martin (2009) Optimizing construction planning schedules by virtual prototyping enabled resource analysis. Automation in Construction, 18(7), pp. 912-918.

Direitos

Copyright 2009 Elsevier.

Fonte

Faculty of Built Environment and Engineering; School of Urban Development

Palavras-Chave #120201 Building Construction Management and Project Planning #Construction planning schedule #Virtual prototyping #Space #Resource analysis
Tipo

Journal Article