791 resultados para Spent Working Time
Resumo:
Work time spread across the entire week, rather than the conventional five day working week, has meant that workers are now less able to utilise longer stretches of recreation time especially in gaining access to a full two-day break over a weekend. This paper explores the issues contributing to workers' acquisition of longer recreation time. It seeks to determine the effects of this acquisition on the quality of working and non-working time for the employee through a study of work-life balance in the construction industry. It finds that weekends are more important to achieving work-life balance than shorter days over a six-day week when working long hours. Further, 'personal time' is a key element in achieving satisfactory work-life balance for employees, and this type of 'time' is often forgone in trying to integrate the necessary and desired non-work activities in the shorter time available to workers.
Resumo:
Purpose: The purpose of this paper is to provide a labour process theory interpretation of four case studies within the Australian construction industry. In each case study a working time intervention (a shift to a five-day working week from the industry standard six days) was implemented as an attempt to improve the work-life balance of employees. ----- ----- Design/methodology/approach: This paper was based on four case studies with mixed methods. Each case study has a variety of data collection methods which include questionnaires, short and long interviews, and focus groups. ----- ----- Findings: It was found that the complex mix of wage- and salary-earning staff within the construction industry, along with labour market pressures, means that changing to a five-day working week is quite a radical notion within the industry. However, there are some organisations willing to explore opportunities for change with mixed experiences. ----- ----- Practical implications: The practical implications of this research include understanding the complexity within the Australian construction industry, based around hours of work and pay systems. Decision-makers within the construction industry must recognize a range of competing pressures that mean that “preferred” managerial styles might not be appropriate. ----- ----- Originality/value:– This paper shows that construction firms must take an active approach to reducing the culture of long working hours. This can only be achieved by addressing issues of project timelines and budgets and assuring that take-home pay is not reliant on long hours of overtime.
Resumo:
This paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.
Resumo:
This paper seeks to identify the effect of the implementation of the European Working Time Directive (EWTD) on the working hours of UK doctors. The Labour Force Survey is used to compare the working hours of doctors with a variety of control groups before and after the implementation of the directive. The controls include those unconstrained by the directive and doctor counterparts working in Europe. We use differences-in-differences and matching methods to estimate the impact of this natural experiment, distinguishing between the anticipation and enactment of the EWTD. We find that the legislation reduced the hours of senior doctors by around 8 hours in total including the component attributable to anticipation effects and allowing for (exogenously set) rising wages.
Resumo:
Background There has been an increasing interest in the health effects of long
working hours, but little empirical evidence to substantiate early
10 case series suggesting an increased mortality risk. The aim of the
current study is to quantify the mortality risk associated with long
working hours and to see if this varies by employment relations and
conditions of occupation.
Methods A census-based longitudinal study of 414 949 people aged 20-59/64
15 years, working at least 35 h/week, subdivided into four occupational
classes (managerial/professional, intermediate, own account workers,
workers in routine occupations) with linkage to deaths records
over the following 8.7 years. Cox proportional hazards models were
used to examine all-cause and cause-specific mortality risk.
20 Results Overall 9.4% of the cohort worked 55 or more h/week, but this
proportion was greater in the senior management and professional
occupations and in those who were self-employed. Analysis of 4447
male and 1143 female deaths showed that hours worked were
associated with an increased risk of all-cause mortality only for
25 men working for more than 55 or more h/week in routine/semiroutine
occupations [adjusted hazard ratios (adjHR) 1.31: 95%
confidence intervals (CIs) 1.11, 1.55)] compared with their peers
working 35–40 h/week. Their equivalent risk of death from cardiovascular
disease was (adjHR 1.49: 95% CIs 1.10, 2.00).
30 Conclusions These findings substantiate and add to the earlier studies indicating
the deleterious impact of long working hours but also suggest that
the effects are moderated by employment relations or conditions of
occupation. The policy implications of these findings are discussed.
Resumo:
Working time has been among the first aspect of the employment relation to be the object of intense regulation at the national and supra-national level. This standard regulation of working time comprised a number of elements: full-time hours, rigid working schedules, strong employers’ control and clear boundaries around working time In spite of general claims about the erosion of this model, few studies have investigated this process in a comparative and empirical perspective. The aim of this paper is to investigate the diversity of working time arrangements in European economies by applying latent class analysis to data
from the European Working Conditions Survey (EWCS). This analysis shows the existence of six different types of working time organization highlighting five cross-national patterns: multiple flexibilities, extended flexibility, standard, rigid and fragmented time.
Resumo:
This paper uses the large-scale Cranet data to explore the extent of non-standard working time (NSWT) across Europe and to highlight the contrasts and similarities between two different varieties of capitalism (coordinated market economies and liberal market economies). We explore variations in the extent of different forms of NSWT (overtime, shift working and weekend working) within these two different forms of capitalism, controlling for firm size, sector and the extent of employee voice. Overall, there was no strong link between the variety of capitalism and the use of overtime and weekend working though shift working showed a clear distinction between the two varieties of capitalism. Usage of NSWT in some service sectors was particularly high under both forms of capitalism and service sector activities had a particularly marked influence on the use of overtime in liberal market economies. Surprisingly, strong employee voice was associated with greater use of NSWT.
Resumo:
Objectives: This study evaluated the degree of conversion (DC) and working time (WT) of two commercial, dual-cured resin cements polymerized at varying temperatures and under different curing-light accessible conditions, using Fourier transformed infrared analysis (FTIR). Materials and Methods: Calibra (Cal; Dentsply Caulk) and Variolink II (Ivoclar Vivadent) were tested at 25 degrees C or preheated to 37 degrees C or 50 degrees C and applied to a similar-temperature surface of a horizontal attenuated-total-reflectance unit (ATR) attached to an infrared spectrometer. The products were polymerized using one of four conditions: direct light exposure only (600 mW/cm(2)) through a glass slide or through a 1.5- or 3.0-mm-thick ceramic disc (A2 shade, IPS e.max, Ivoclar Vivadent) or allowed to self-cure in the absence of light curing. FTIR spectra were recorded for 20 min (1 spectrum/s, 16 scans/spectrum, resolution 4 cm(-1)) immediately after application to the ATR. DC was calculated using standard techniques of observing changes in aliphatic-to-aromatic peak ratios precuring and 20-min postcuring as well as during each 1-second interval. Time-based monomer conversion analysis was used to determine WT at each temperature. DC and WT data (n=6) were analyzed by two-way analysis of variance and Tukey post hoc test (p=0.05). Results: Higher temperatures increased DC regardless of curing mode and product. For Calibra, only the 3-mm-thick ceramic group showed lower DC than the other groups at 25 degrees C (p=0.01830), while no significant difference was observed among groups at 37 degrees C and 50 degrees C. For Variolink, the 3-mm-thick ceramic group showed lower DC than the 1-mm-thick group only at 25 degrees C, while the self-cure group showed lower DC than the others at all temperatures (p=0.00001). WT decreased with increasing temperature: at 37 degrees C near 70% reduction and at 50 degrees C near 90% for both products, with WT reduction reaching clinically inappropriate times in some cases (p=0.00001). Conclusion: Elevated temperature during polymerization of dual-cured cements increased DC. WT was reduced with elevated temperature, but the extent of reduction might not be clinically acceptable.