884 resultados para Results-based contracting


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Clients and contractors need to be aware of the project’s legal environment because the viability of a procurement strategy can be vitiated by legal rules. This is particularly true regarding Performance-Based Contracting (PBC) whose viability may be threatened by rules of property law: while the PBC concept does not require that the contractor transfers the ownership in the building materials used to the client, the rules of property law often lead to an automatic transfer of ownership. But does the legal environment really render PBC unfeasible? In particular, is PBC unfeasible because contractors lose their materials as assets? These questions need to be answered with respect to the applicable property law. As a case study, English property law has been chosen. Under English law, the rule which governs the automatic transfer of ownership is called quicquid plantatur solo, solo credit (whatever is fixed to the soil belongs to the soil). An analysis of this rule reveals that not all materials which are affixed to land become part of the land. This fate only occurs in relation to materials which have been affixed with the intention of permanently improving the land. Five fictitious PBC cases have been considered in terms of the legal status of the materials involved, and several subsequent legal questions have been addressed. The results suggest that English law does actually threaten the feasibility of PBC in some cases. However, it is also shown that the law provides means to circumvent the unwanted results which flow from the rules of property law. In particular, contractors who are interested in keeping their materials as assets can insist on agreeing a property right in the client’s land, i.e. a contractor’s lien. Therefore, the outcome is that English property law does not render the implementation of the PBC concept unfeasible. At a broader level, the results contribute to the theoretical framework of PBC as an increasingly used procurement strategy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many countries over the last decade, have used performance-based contracting (PBC) to manage and maintain roads. The implementation of PBC provides additional benefits for the government/public such as cost savings and improved conditions of contracted road assets. In Australia, PBC is already being implemented on all categories of roads: national, state, urban and rural. Australian PBC arrangement is designed to turn over control and responsibility for roadway system maintenance, rehabilitation, and capital improvement projects to private contractors. Contractors’ responsibilities include determination of treatment types, the design, programming and the undertaking of works needed to maintain road networks at predetermined performance levels. Indonesia initiated two PBC pilot projects in 2011, the Pantura Section Demak-Trengguli (7.68 kilometers) in Central Java Province and Section Ciasem-Pamanukan (18.5 kilometers) in West Java Province. Both sections are categorized as national roads. The contract duration for both of these projects is four years. To facilitate a possible way forward, it is proposed to conduct a study to understand Australia's experiences of advancing from pilot projects to nation-wide programs using PBC. The study focuses on the scope of contracts, bidding processes, risk allocation, and key drivers, using relevant PBC case studies from Australia. Recommendations for future PBC deployment nation-wide should be based on more research associated with risk allocation. This will include investigation of standard conditions of contract. Implications of the contract clauses for the risk management strategy to be adopted by contractors. Based on the nature of risks, some are best managed by the project owner. It is very important that all parties involved to be open to the new rules of contract and to convince themselves about the potential increased benefits of the use of PBC. The most recent states of challenging issues were explored and described.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main objective of the study is to examine the accuracy of and differences among simulated streamflows driven by rainfall estimates from a network of 22 rain gauges spread over a 2,170 km2 watershed, NEXRAD Stage III radar data, and Tropical Rainfall Measuring Mission (TRMM) 3B42 satellite data. The Gridded Surface Subsurface Hydrologic Analysis (GSSHA), a physically based, distributed parameter, grid-structured, hydrologic model, was used to simulate the June-2002 flooding event in the Upper Guadalupe River watershed in south central Texas. There were significant differences between the rainfall fields estimated by the three types of measurement technologies. These differences resulted in even larger differences in the simulated hydrologic response of the watershed. In general, simulations driven by radar rainfall yielded better results than those driven by satellite or rain-gauge estimates. This study also presents an overview of effects of land cover changes on runoff and stream discharge. The results demonstrate that, for major rainfall events similar to the 2002 event, the effect of urbanization on the watershed in the past two decades would not have made any significant effect on the hydrologic response. The effect of urbanization on the hydrologic response increases as the size of the rainfall event decreases.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective: To establish a prediction model of the degree of disability in adults with Spinal CordInjury (SCI ) based on the use of the WHO-DAS II . Methods: The disability degree was correlatedwith three variable groups: clinical, sociodemographic and those related with rehabilitation services.A model of multiple linear regression was built to predict disability. 45 people with sci exhibitingdiverse etiology, neurological level and completeness participated. Patients were older than 18 andthey had more than a six-month post-injury. The WHO-DAS II and the ASIA impairment scale(AIS ) were used. Results: Variables that evidenced a significant relationship with disability were thefollowing: occupational situation, type of affiliation to the public health care system, injury evolutiontime, neurological level, partial preservation zone, ais motor and sensory scores and number ofclinical complications during the last year. Complications significantly associated to disability werejoint pain, urinary infections, intestinal problems and autonomic disreflexia. None of the variablesrelated to rehabilitation services showed significant association with disability. The disability degreeexhibited significant differences in favor of the groups that received the following services: assistivedevices supply and vocational, job or educational counseling. Conclusions: The best predictiondisability model in adults with sci with more than six months post-injury was built with variablesof injury evolution time, AIS sensory score and injury-related unemployment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction procurement is complex and there is a very wide range of options available to procurers. Inappropriate choices about how to procure may limit practical opportunities for innovation. In particular, traditional approaches to construction procurement set up many obstacles for technology suppliers to provide innovative solutions. This is because they are often employed as sub-contractors simply to provide and install equipment to specifications developed before the point at which they become involved in a project. A research team at the University of Reading has developed a procurement framework that comprehensively defines the various options open to procurers in a more fine-grained way than has been known in the past. This enables informed decisions that can establish tailor-made procurement approaches that take into account the needs of specific clients. It enables risk and reward structures to be aligned so that contracts and payment mechanisms are aligned precisely with what a client seeks to achieve. This is not a “one-size-fits-all” approach. Rather, it is an approach that enables informed decisions about how to organize individual procurements that are appropriate to particular circumstances, acknowledging that they differ for each client and for each procurement exercise. Within this context, performance-based contracting (PBC) is explored in terms of the different ways in which technology suppliers within constructed facilities might be encouraged and rewarded for the kinds of innovation sought by the ultimate clients. Examples from various industry sectors are presented, from public sector and from private sector, with a commentary about what they sought to achieve and the extent to which they were successful. The lessons from these examples are presented in terms of feasibility in relation to financial issues, governance, economics, strategic issues, contractual issues and cash flow issues for clients and for contractors. Further background documents and more detailed readings are provided in an appendix for those who wish to find out more.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

No record of other volumes published by the society.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

MOTIVATION: Data from RNA-seq experiments provide us with many new possibilities to gain insights into biological and disease mechanisms of cellular functioning. However, the reproducibility and robustness of RNA-seq data analysis results is often unclear. This is in part attributed to the two counter acting goals of (a) a cost efficient and (b) an optimal experimental design leading to a compromise, e.g., in the sequencing depth of experiments.

RESULTS: We introduce an R package called samExploreR that allows the subsampling (m out of n bootstraping) of short-reads based on SAM files facilitating the investigation of sequencing depth related questions for the experimental design. Overall, this provides a systematic way for exploring the reproducibility and robustness of general RNA-seq studies. We exemplify the usage of samExploreR by studying the influence of the sequencing depth and the annotation on the identification of differentially expressed genes.

AVAILABILITY: Availability: samExploreR is available as an R package from Bioconductor (after acceptance of the paper, download link: http://www.bio-complexity.com/samExploreR_1.0.0.tar.gz).


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The increasing emphasis on aid effectiveness, accountability and impact measurement in international development and humanitarian work has generated a requirement for high quality internal systems for the management of programmes. To help to address this requirement, Trócaire adopted Results Based Management in the 20 countries in which it works. This paper provides an overview of Trócaire’s RBM journey, including the process of embedding the new approach in the organisation, lessons learnt from this process, the subsequent benefits that are emerging at field programme level and the challenges going forward.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O escopo desta pesquisa é analisar o impacto da contratualização de resultados sobre o desempenho de hospitais públicos estaduais da Administração Direta no Estado de São Paulo. Este trabalho visa cobrir uma lacuna existente nos estudos de Nova Gestão Pública, buscando entender a correlação entre a implementação de políticas de gestão, no caso a contratualização, e os resultados de processo (outputs) e de impacto (outcomes) da organização. A hipótese a ser testada é a de que a contratualização melhora o desempenho das unidades hospitalares, pois aumenta a coordenação do núcleo estratégico de governo, estimula a aprendizagem organizacional, além de promover incentivos para a melhoria contínua. Um objetivo secundário da pesquisa será o de entender como os contratos são acompanhados, de forma a minimizar os problemas da relação agente-principal originados neste tipo de prática. A literatura indica que uma maneira de minimizar tais problemas tem sido a utilização de contratos baseados em confiança, reciprocidade e aprendizado mútuo, os chamados contratos relacionais, que serão explorados na análise do caso. O caso escolhido para testar a hipótese é o de contratualização das unidades hospitalares da Administração Direta (AD) com a Secretaria Estadual de Saúde de São Paulo (SES), através do “Contrato Programa” iniciado ao final de 2008. Os resultados indicam que há relação entre a introdução dos contratos e os resultados do hospital, com melhoria na maior parte dos indicadores analisados.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O objetivo deste trabalho é compreender e avaliar a utilização da Contratualização de Resultados pela Secretaria Municipal de Assistência Social de São Paulo com entidades privadas sem fins lucrativos, em especial para a prestação do serviço de acolhimento institucional. Para tanto, buscaremos apresentar as características desse novo formato de relacionamento do Estado com a sociedade civil e avaliar em que medida o acordo de resultados pode colaborar com a melhoria da efetividade na prestação deste serviço no município de São Paulo.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The contracting-out of public services has often been accompanied by a strong academic focus on the emergence of new governance forms, and a general neglect of the processes and practices through which contracted-out services are controlled and monitored. To fill this gap, we draw on contracting-out and inter-organizational control literatures to explore the adoption of control mechanisms for public service provision at the municipal level and the variables that can explain their choice. Our results, based on a survey of Italian municipalities, show that in the presence of contracting-out, market-, hierarchy- and trust-based controls display different intensities, can co-exist and are explained by different variables. Service characteristics are more effective in explaining market- and hierarchy-based controls than relationship characteristics. Trust-based controls are the most widespread, but cannot be explained by the variables traditionally identified in contracting-out and inter-organizational control studies.