978 resultados para Rail CRC


Relevância:

60.00% 60.00%

Publicador:

Resumo:

New knowledge has raised a concern about the cost-ineffective design methods and the true performance of railroad prestressed concrete ties. Because of previous knowledge deficiencies, railway civil and track engineers have been aware of the conservative design methods for structural components in any railway track that rely on allowable stresses and material strength reductions. In particular, railway sleeper (or railroad tie) is an important component of railway tracks and is commonly made of prestressed concrete. The existing code for designing such components makes use of the permissible stress design concept, whereas the fiber stresses over cross sections at initial and final stages are limited by some empirical values. It is believed that the concrete ties complying with the permissible stress concept possess unduly untapped fracture toughness, based on a number of proven experiments and field data. Collaborative research run by the Australian Cooperative Research Centre for Railway Engineering and Technologies (Rail CRC) was initiated to ascertain the reserved capacity of Australian railway prestressed concrete ties that were designed using the existing design code. The findings have led to the development of a new limit-states design concept. This paper highlights the conventional and the new limit-states design philosophies and their implication to both the railway community and the public. © 2011 American Society of Civil Engineers.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Cooperative Research Centre (CRC) for Rail Innovation is conducting a tranche of industry-led research projects looking into safer rail level crossings. This paper will provide an overview of the Affordable Level Crossings project, a project that is performing research in both engineering and human factors aspects of low-cost level crossing warning devices (LCLCWDs), and is facilitating a comparative trial of these devices over a period of 12 months in several jurisdictions. Low-cost level crossing warning devices (LCLCWDs) are characterised by the use of alternative technologies for high cost components including train detection and connectivity (e.g. radar, acoustic, magnetic induction train detection systems and wireless connectivity replacing traditional track circuits and wiring). These devices often make use of solar power where mains power is not available, and aim to make substantial savings in lifecycle costs. The project involves trialling low-cost level crossing warning devices in shadow-mode, where devices are installed without the road-user interface at a number of existing level crossing sites that are already equipped with conventional active warning systems. It may be possible that the deployment of lower-cost devices can provide a significantly larger safety benefit over the network than a deployment of expensive conventional devices, as the lower cost would allow more passive level crossing sites to be upgraded with the same capital investment. The project will investigate reliability and safety integrity issues of the low-cost devices, as well as evaluate lifecycle costs and investigate human factors issues related to warning reliability. This paper will focus on the requirements and safety issues of LCLCWDs, and will provide an overview of the Rail CRC projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Improving safety at railway level crossings is an important issue for the Australian transport system. Governments, the rail industry and road organisations have tried a variety of countermeasures for many years to improve railway level crossing safety. New types of Intelligent Transport System (ITS) interventions are now emerging due to the availability and the affordability of technology. These interventions target both actively and passively protected railway level crossings and attempt to address drivers’ errors at railway crossings, which are mainly a failure to detect the crossing or the train and misjudgement of the train approach speed and distance. This study aims to assess the effectiveness of three emerging ITS that the rail industry considers implementing in Australia: a visual in-vehicle ITS, an audio in-vehicle ITS, as well as an on-road flashing beacons intervention. The evaluation was conducted on an advanced driving simulator with 20 participants per trialled technology, each participant driving once without any technology and once with one of the ITS interventions. Every participant drove through a range of active and passive crossings with and without trains approaching. Their speed approach of the crossing, head movements and stopping compliance were measured. Results showed that driver behaviour was changed with the three ITS interventions at passive crossings, while limited effects were found at active crossings, even with reduced visibility. The on-road intervention trialled was unsuccessful in improving driver behaviour; the audio and visual ITS improved driver behaviour when a train was approaching. A trend toward worsening driver behaviour with the visual ITS was observed when no trains were approaching. This trend was not observed for the audio ITS intervention, which appears to be the ITS intervention with the highest potential for improving safety at passive crossings.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper describes the work being conducted in the baseline rail level crossing project, supported by the Australian rail industry and the Cooperative Research Centre for Rail Innovation. The paper discusses the limitations of near-miss data for analysis obtained using current level crossing occurrence reporting practices. The project is addressing these limitations through the development of a data collection and analysis system with an underlying level crossing accident causation model. An overview of the methodology and improved data recording process are described. The paper concludes with a brief discussion of benefits this project is expected to provide the Australian rail industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A Flat Bed Rail Wagon (FBRW) has been proposed as an alternative solution for replacing bridges on low traffic volume roads. The subject matter for this paper is to investigate the impediment to load transfer from cross girders to main girder, through visually identifiable structural flaws. Namely, the effect of having large openings at close proximity to the connection of the main girder to the cross girder of a FBRW was examined. It was clear that openings locally reduce the section modulus of the secondary members; however it was unclear how these reductions would affect the load transfer to the main girder. The results are presented through modeling grillage action for which the loads applied onto the FBRW were distributed through cross girders to the main girder.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper discusses major obstacles for the adoption of low cost level crossing warning devices (LCLCWDs) in Australia and reviews those trialed in Australia and internationally. The argument for the use of LCLCWDs is that for a given investment, more passive level crossings can be treated, therefore increasing safety benefits across the rail network. This approach, in theory, reduces risk across the network by utilizing a combination of low-cost and conventional level crossing interventions, similar to what is done in the road environment. This paper concludes that in order to determine if this approach can produce better safety outcomes than the current approach, involving the incremental upgrade of level crossings with conventional interventions, it is necessary to perform rigorous risk assessments and cost-benefit analyses of LCLCWDs. Further research is also needed to determine how best to differentiate less reliable LCCLWDs from conventional warning devices through the use of different warning signs and signals. This paper presents a strategy for progressing research and development of LCLCWDs and details how the Cooperative Research Centre (CRC) for Rail Innovation is fulfilling this strategy through the current and future affordable level crossing projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of this chapter is to provide rail practitioners with a practical approach for determining safety requirements of low-cost level crossing warning devices (LCLCWDs) on an Australian railway by way of a case study. LCLCWDs, in theory, allow railway operators to improve the safety of passively controlled crossing by upgrading a larger number of level crossings with the same budget that would otherwise be used to upgrade these using the conventional active level crossing control technologies, e.g. track circuit initiated flashing light systems. The chapter discusses the experience and obstacles of adopting LCLCWDs in Australia, and demonstrates how the risk-based approach may be used to make the case for LCLCWDs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A core component for the prevention of re-occurring incidents within the rail industry is rail safety investigations. Within the current Australasian rail industry, the nature of incident investigations varies considerably between organisations. As it stands, most of the investigations are conducted by the various State Rail Operators and Regulators, with the more major investigations in Australia being conducted or overseen by the Australian Transport Safety Bureau (ATSB). Because of the varying nature of these investigations, the current training methods for rail incident investigators also vary widely. While there are several commonly accepted training courses available to investigators in Australasia, none appear to offer the breadth of development needed for a comprehensive pathway. Furthermore, it appears that no single training course covers the entire breadth of competencies required by the industry. These courses range in duration between a few days to several years, and some were run in-house while others are run by external consultants or registered training organisations. Through consultations with rail operators and regulators in Australasia, this paper will identify capabilities required for rail incident investigation and explore the current training options available for rail incident investigators.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Railway level crossings present an arguably unique interface between two transport systems that differ markedly in their performance characteristics, their degrees of regulation and their safety cultures. Railway level crossings also differ dramatically in the importance they represent as safety issues for the two modes. For rail, they are the location of a large proportion of fatalities within the system and are therefore the focus of much safety concern. For the road system, they comprise only a few percent of all fatalities, although the potential for catastrophic outcomes exist. Rail operators and regulators have traditionally required technologies to be failsafe and to demonstrate high levels of reliability. The resultant level of complexity and cost has both limited their extent of application and led to a need to better understand how motorists comprehend and respond to these systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Historically rail organisations have been operating in silos and devising their own training agendas. However with the harmonisation of the Australian workplace health and safety legislation and the appointment of a national rail safety regulator in 2013, rail incident investigator experts are exploring the possibility of developing a unified approach to investigator training. Objectives: The Australian CRC for Rail Innovation commissioned a training needs analysis to identify if common training needs existed between organisations and to assess support for the development of a national competency framework for rail incident investigations. Method: Fifty-two industry experts were consulted to explore the possibility of the development of a standardised training framework. These experts were sourced from within 19 Australasian organisations, comprising Rail Operators and Regulators in Queensland, New South Wales, Victoria, Western Australia, South Australia and New Zealand. Results: Although some competency requirements appear to be organisation specific, the vast majority of reported training requirements were generic across the Australasian rail operators and regulators. Industry experts consistently reported strong support for the development of a national training framework. Significance: The identification of both generic training requirements across organisations and strong support for standardised training indicates that the rail industry is receptive to the development of a structured training framework. The development of an Australasian learning framework could: increase efficiency in course development and reduce costs; establish recognised career pathways; and facilitate consistency with regards to investigator training.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A core component for the prevention of re-occurring incidents within the rail industry is rail safety investigations. Within the current Australasian rail industry, the nature of incident investigations varies considerably between organisations. As it stands, most of the investigations are conducted by the various State Rail Operators and Regulators, with the more major investigations in Australia being conducted or overseen by the Australian Transport Safety Bureau (ATSB). Because of the varying nature of these investigations, the current training methods for rail incident investigators also vary widely. While there are several commonly accepted training courses available to investigators in Australasia, none appear to offer the breadth of development needed for a comprehensive pathway. Furthermore, it appears that no single training course covers the entire breadth of competencies required by the industry. These courses range in duration between a few days to several years, and some were run in-house while others are run by external consultants or registered training organisations. Through consultations with rail operators and regulators in Australasia, this paper will identify capabilities required for rail incident investigation and explore the current training options available for rail incident investigators.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Improved forecasting of urban rail patronage is essential for effective policy development and efficient planning for new rail infrastructure. Past modelling and forecasting of urban rail patronage has been based on legacy modelling approaches and often conducted at the general level of public transport demand, rather than being specific to urban rail. This project canvassed current Australian practice and international best practice to develop and estimate time series and cross-sectional models of rail patronage for Australian mainland state capital cities. This involved the implementation of a large online survey of rail riders and non-riders for each of the state capital cities, thereby resulting in a comprehensive database of respondent socio-economic profiles, travel experience, attitudes to rail and other modes of travel, together with stated preference responses to a wide range of urban travel scenarios. Estimation of the models provided a demonstration of their ability to provide information on the major influences on the urban rail travel decision. Rail fares, congestion and rail service supply all have a strong influence on rail patronage, while a number of less significant factors such as fuel price and access to a motor vehicle are also influential. Of note, too, is the relative homogeneity of rail user profiles across the state capitals. Rail users tended to have higher incomes and education levels. They are also younger and more likely to be in full-time employment than non-rail users. The project analysis reported here represents only a small proportion of what could be accomplished utilising the survey database. More comprehensive investigation was beyond the scope of the project and has been left for future work.