989 resultados para Project manager


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Programa de doctorado: Restauración y rehabilitación arquitetónica. Investigación, tendencias e innovaciones. La fecha de publicación es la fecha de lectura

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The project management literature on project success is rich. Numerous papers focus on the evolution of the understanding of project success, identification of success criteria and critical success factors. Critical success factors increase the potential for achieving project success, while project success can be evaluated with the help of success criteria. Although the interrelationships between critical success factors and success criteria are rarely analyzed, yet there is a strong demand for it. The aim of this paper is twofold. One of the aims is to identify the impact of one of the critical success factors, the project manager’s project management attitude on project success. The other aim is to highlight the interrelationship between the project manager’s personal characteristics and project management attitude and leadership style, which are three critical success factors. These aim to address the shortcoming mentioned above, which is considering the lack of the interrelationships between critical success factors and success criteria. The research outcomes are drawn from qualitative field research at the Hungarian subsidiaries of multinational companies operating in the ICT sector.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Trabalho de natureza profissional para a atribuição do Título de Especialista do Instituto Politécnico do Porto, na área de Design, defendido a 23-03-2015.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The purpose of the Master’s Thesis is to study the best practices to virtual project management from the project manager’ point of view. The best practices are divided according to a five-phase virtual project life cycle model. Each phase include concrete suggestions for actions. Research’s theoretical background is wide because of the broad subject matter. In the theoretical part topics such as virtual working, virtual project management challenges are examined and some concrete actions to tackle these challenges are introduced. Thesis’ approach is constructive, where a known problem is solved piece by piece after creating a pre-understanding of the topic. Existing research work is utilized when creating a model for virtual project team management. The basis of the model comes from various best practices read from literature and from the interviews conducted on experienced virtual project managers in the case organization. As a result the model combines both previous research and the organizations empirical experience. As an output of the thesis a model for virtual project team management is developed, which can be used as a guideline by the virtual project managers in their work. The model includes actions and practices what can be used to overcome the challenges of virtual project management.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The purpose of the study is to find factors affecting projects' profitability in project business. The issue is approached from customer profitability and project management point of view. The study has been made for a big Finnish company acting in a global market place. The research method is quantitative. Research hypotheses are based on the literature. The used database is originated from the company's ERP- (enterprise resource planning) and project financial follow-up —system. The findings of the study supported the hypotheses weakly. Obviously profitability fluctuated depending on a customer and a project manager. The reasons could not be justified with the variables used in the research.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The main goal of this thesis was to examine how the emotional intelligence skills and multicultural project leadership style of a project manager interrelate and affect the success of a project. The research methods used are literature review in theoretical part of the thesis and semi-structured interviews in empirical part of the thesis. This study is a single case study i.e. one case company was selected to be the secondary level of analysis. Within the case company, four project managers were selected as research units to form the primary level of analysis. Literature review formed the basis for the empirical research and the interview questions were derived from the literature. Findings from the interviews were mirrored against the literature review findings, based on which both conclusions and generalisations could be made. Thus, both deductive and inductive methods were utilised to get more complete picture about the research topic. In the first part of the literature review the general leadership theories and the project leadership terminology are introduced as a background for the concept of emotional intelligence and the integrated leadership model. Emotional intelligence and its interrelation to different leadership concepts are discussed during the literature review. Chinese cultural aspects affecting the way of making business, and the multicultural leadership styles of the Finnish project managers are introduced in the following part of the literature review. It was found that the most successfully used multicultural leadership styles in Finnish-Chinese context are synergistic and polycentric, and these require emotional intelligence skills. In the empirical part on this thesis the findings from the semi-structured interviews are introduced, discussed and analysed. Interviews were done in private meeting rooms, and they were recorded and transcripted to add reliability and validity. Although the sample was only four project managers, the results show that the sample is quite saturated as the responses to several questions followed the same pattern. It was found that Finnish project managers in the case company are democratic and take cultural differences into account in their project leadership. Both synergistic and polycentric leadership styles are used with Chinese team members. Emotional intelligence capabilities and the emphasis of those differ a bit depending on the interviewee. Though, the results show that EI skills and the multicultural project leadership style used in Chinese context are interrelated. The findings from the literature review and the empirical research in this thesis are similar. Though, there is need for further research as the sample was small, and this thesis is a single case study. It is recommendable to make a multi-company study with larger sample of project managers. Also multi-industry perspective is recommendable for further research.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper investigates the relationship of the project management in Private Finance Initiative (PFI) and sustainability. A live PFI project is selected as a case study, where contract review and monitoring on project management are carried out to evaluate the sustainability of project management. The PFI procurement shows great advantages in increased contractual responsibilities of the contractor in sustainable construction, and also in practicing sustainability in project management. Six main sustainable attributes of the project management are selected to evaluate the sustainability of project management in the PFI project. The project management process in the case study is closely monitored in order to verify how the PFI project promotes sustainability in practice. The project management in the different stages of the PFI project, including tendering, design, construction and operation, contributes to the six sustainable attributes in different ways. The project management in PFI project paid more attention in sustainable development during its whole process. As the private sector is responsible to the whole life of the building project, the project manager has to consider the long-term benefits during the management process. The government should take advantages of PFI project management in practicing sustainability therefore to promote sustainable development of the national infrastructure services.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction industry is widely recognised as being inherent with risk and uncertainty. This necessitates the need for effective project risk management to achieve the project objectives of time, cost and quality. A popular tool employed in projects to aid in the management of risk is a risk register. This tool documents the project risks and is often employed by the Project Manager (PM) to manage the associated risks on a project. This research aims to ascertain how widely risk registers are used by Project Managers as part of their risk management practices. To achieve this aim entailed interviewing ten PMs, to discuss their use of the risk register as a risk management tool. The results from these interviews indicated the prevalent use of this document and recognised its effectiveness in the management of project risks. The findings identified the front end and feasibility phases of a project as crucial stages for using risk registers, noting it as a vital ingredient in the risk response planning of the decision making process. Moreover, the composition of the risk register was also understood, with an insight into how PMs produce and develop this tool also ascertained. In conclusion, this research signifies the extensive use of the risk register by PMs. A majority of PMs were of the view that risk registers constitute an essential component of their project risk management practices. This suggests a need for further research on the extent to which risk registers actually help PMs to control the risks in a construction project, particularly residual risks, and how this can be improved to minimize deviations from expected outcomes.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In the last decades, the increasing significance of “projectivization” (Lundin & Steinthórsson, 2003) has stimulated considerable interest in project-based organizations as new economic actors able to introduce a new logic of organizing work and weakening boundaries in favour of networks of collaborations. In these contexts, work is often delegated to project teams. Deciding whom to put on a project team is one of the biggest challenges faced by a project manager; in particular which characteristics rely on to compose and match effective teams. We address this issue, focusing on the individual flexibility (Raudsepp, 1990), as team composition variable that affects project team performance. Thus, the research question investigated is: Is it better to compose project teams with flexible team members or not flexible project team members to achieve higher levels of project performance? The temporary nature of PBOs involves that after achieving the purpose for which team members are enrolled, they are disbanded but their relationships remain, allowing them to be involved in future projects (Starkey, Barnatt & Tempest, 2000). Pre-existing relationships together with the current relationships create a network of relationships that yields some implications for project teams as well as for team members. We address this issue, exploring the following research question: To what extent is the individual flexibility influenced by the network structure? The conceptual framework is used to articulate the research questions investigated with respect to the Television drama serials production. Their project-team organizing combined with their capacity to dissolve and recreate over time make it an interesting field to develop. We contribute to the organizational literature, providing a clear operationalization of individual flexibility construct and its role on affecting project performance. Second, we contribute to the organizational network literature addressing the effects yielded by the network structure-structural holes and network closure- on the individual flexibility.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

L’obiettivo dell’elaborato è mostrare come, partendo da una robusta base teorica nelle discipline del Project Management e del Business Process Reengineering, sia possibile ridefinire un sistema di gestione dei progetti (a livello singolo e di aggregato) e sviluppare, presso il personale coinvolto, le competenze necessarie a sostenere autonomamente ed a migliorare il sistema così creato. La reingegnerizzazione della progettazione nell’azienda in esame si è sviluppata nell’arco di un quadriennio: nel 2010 è stata concretizzata la prima release dei processi di gestione del progetto singolo e dell’aggregato, nel 2011 è maturata la seconda release, mentre nel biennio 2012-2013 si sono “congelati” i risultati ottenuti e si è sviluppata l’autonomia dei Project Manager interni e del Project Management Office. Dall’analisi è emersa l’importanza di un solido approccio metodologico negli interventi di innovazione organizzativa.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Nella tesi viene affrontato l'argomento della gestione delle risorse umane all'interno di un progetto. Vengono individuate le criticità e tramite un elenco di metodi e strumenti di gestione delle risorse umane si vuole indirizzare il project manager ad attivare quelli più inerenti alla risoluzione dei problemi che generalmente si presentano durante l'esecuzione di un progetto.