864 resultados para Project management practices


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main goals for the current dissertation is to research on how practices and concepts from Agile Project Management can be applied in a non-IT context and to discover which aspects should be considered when deciding if whether an Agile approach should be implemented or not. Previous studies reflect on the adoption for the identified context. However, the recognition of these practices and concepts by the Project Management field of studies still remains unresolved. The adoption of Agile Project Management emerges as a manifestation against traditional approaches, mainly due to their inability of accepting requirements’ changes. Therefore, these practices and concepts can be considered in order to reduce the risks concerning the increase of competition and innovation – which does not apply to the IT sector solely. The current study reviews the literature on Agile Project Management and its adoption across different sectors in order to assess which practices and concepts can be applied on a non-IT context. Nine different methods are reviewed, where two of these show a higher relevance – Scrum and Extreme Programming. The identified practices and concepts can be separated into four different groups: Cultural and Organizational Structures, Process, Practices, and Artefacts. A framework based on the work by Boehm & Turner in 2004 is developed in order to support the decision of adopting agile methods. A survey intended for project managers was carried in order to assess the implementation of the identified practices and concepts and to evaluate which variables have the highest importance on the developed decision support framework. It is concluded that New Product Development is the project type with the highest potential to implement an agile approach and that the Project Final Product’s Innovativeness, Competitiveness, and the Project Member’s Experience and Autonomy are the most important aspects to consider an implementation of an Agile approach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The literature has emphasized that absorptive capacity (AC) leads to performance, but in projects its influences still unclear. Additionally, the project success is not well understood by the literature, and AC can be an important mechanism to explain it. Therefore, the purpose of this study is to investigate the effect of absorptive capacity on project performance in the construction industry of São Paulo State. We study this influence through potential and realized absorptive capacity proposed by Zahra and George (2002). For achieving this goal, we use a combination of qualitative and quantitative research. The qualitative research is based on 15 interviews with project managers in different sectors to understand the main constructs and support the next quantitative phase. The content analysis was the technique used to analyze those interviews. In quantitative phase through a survey questionnaire, we collected 157 responses in the construction sector with project managers. The confirmatory factor analysis and hierarchical linear regression were the techniques used to assess the data. Our findings suggest that the realized absorptive capacity has a positive influence on performance, but potential absorptive capacity and the interactions effect have no influence on performance. Moreover, the planning and monitoring have a positive impact on budget and schedule, and customer satisfaction while risk coping capacity has a positive impact on business success. In academics terms, this research enables a better understanding of the importance of absorptive capacity in the construction industry and it confirms that knowledge application in processes and routines enhances performance. For management, the absorptive capacity enables the improvements of internal capabilities reflected in the increased project management efficiency. Indeed, when a company manages project practices efficiently it enhances business and project performance; however, it needs initially to improve its internal abilities to enrich processes and routines through relevant knowledge.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective management of projects is becoming increasingly important for any type of organization to remain competitive in today’s dynamic business environment due to pressure of globalization. The use of benchmarking is widening as a technique for supporting project management. Benchmarking can be described as the search for the best practices, leading to the superior performance of an organization. However, effectiveness of benchmarking depends on the use of tools for collecting and analyzing information and deriving subsequent improvement projects. This study demonstrates how analytic hierarchy process (AHP), a multiple attribute decision-making technique, can be used for benchmarking project management practices. The entire methodology has been applied to benchmark project management practice of Caribbean public sector organizations with organizations in the Indian petroleum sector, organizations in the infrastructure sector of Thailand and the UK. This study demonstrates the effectiveness of a proposed benchmarking model using AHP, determines problems and issues of Caribbean project management in the public sector and suggests improvement measures for effective project management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Indian petroleum industry is passing through a very dynamic business environment due to the liberalisation of many government policies, vertical integration among organisations and the presence of multinational companies. This caused a competitive environment among the organisations in the Indian petroleum industry in the public sector. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered one of the means for remaining competitive in this business environment. However, present project management practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the issues in managing projects of the organisation in the Indian petroleum sector with the involvement of the executives in a workshop environment. This also suggests some remedial measures for resolving those issues through identifying critical success factors and enablers. The enablers not only resolve the present issues but also ensure superior performance. These are analysed in a quantitative framework to derive improvement measures in project management practices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Software development is a discipline that is almost as old as the history of computers. With the advent of the Internet and all of its related technologies, software development has been on high demand. But, and especially in SME (small and medium enterprise), this was not accompanied with a comparable effort to develop a set of sustainable and standardized activities of project management, which lead to increasing inefficiencies and costs. Given the actual economic situation, it makes sense to engage in an effort to reduce said inefficiencies and rising costs. For that end, this work will analyze the current state of software development’s project management processes on a Portuguese SME, along with its problems and inefficiencies in an effort to create a standardized model to manage software development, with special attention given to critical success factors in an agile software development environment, while using the best practices in process modeling. This work also aims to create guidelines to correctly integrate these changes in the existing IS structure of a company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agile methods have become increasingly popular in the field of software engineering. While agile methods are now generally considered applicable to software projects of many different kinds, they have not been widely adopted in embedded systems development. This is partly due to the natural constraints that are present in embedded systems development (e.g. hardware–software interdependencies) that challenge the utilization of agile values, principles and practices. The research in agile embedded systems development has been very limited, and this thesis tackles an even less researched theme related to it: the suitability of different project management tools in agile embedded systems development. The thesis covers the basic aspects of many different agile tool types from physical tools, such as task boards and cards, to web-based agile tools that offer all-round solutions for application lifecycle management. In addition to these two extremities, there is also a wide range of lighter agile tools that focus on the core agile practices, such as backlog management. Also other non-agile tools, such as bug trackers, can be used to support agile development, for instance, with plug-ins. To investigate the special tool requirements in agile embedded development, the author observed tool related issues and solutions in a case study involving three different companies operating in the field of embedded systems development. All three companies had a distinct situation in the beginning of the case and thus the tool solutions varied from a backlog spreadsheet built from scratch to plug-in development for an already existing agile software tool. Detailed reports are presented of all three tool cases. Based on the knowledge gathered from agile tools and the case study experiences, it is concluded that there are tool related issues in the pilot phase, such as backlog management and user motivation. These can be overcome in various ways epending on the type of a team in question. Finally, five principles are formed to give guidelines for tool selection and usage in agile embedded systems development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to investigate the role of operational flexibility for effective project management in the construction industry. The specific objectives are to: a) Identify the determinants of operational flexibility potential in construction project management b) Investigate the contribution of each of the determinants to operational flexibility potential in the construction industry c) Investigate on the moderating factors of operational flexibility potential in a construction project environment d) Investigate whether moderated operational flexibility potential mediates the path between predictors and effective construction project management e) Develop and test a conceptual model of achieving operational flexibility for effective project management The purpose of this study is to findout ways to utilize flexibility inorder to manage uncertain project environment and ultimately achieve effective project management. In what configuration these operational flexibility determinants are demanded by construction project environment in order to achieve project success. This research was conducted in three phases, namely: (i) exploratory phase (ii) questionnaire development phase; and (iii) data collection and analysis phase. The study needs firm level analysis and therefore real estate developers who are members of CREDAI, Kerala Chapter were considered. This study provides a framework on the functioning of operational flexibility, offering guidance to researchers and practitioners for discovering means to gain operational flexibility in construction firms. The findings provide an empirical understanding on kinds of resources and capabilities a construction firm must accumulate to respond flexibly to the changing project environment offering practitioners insights into practices that build firms operational flexibility potential. Firms are dealing with complex, continuous changing and uncertain environments due trends of globalization, technical changes and innovations and changes in the customers’ needs and expectations. To cope with the increasingly uncertain and quickly changing environment firms strive for flexibility. To achieve the level of flexibility that adds value to the customers, firms should look to flexibility from a day to day operational perspective. Each dimension of operational flexibility is derived from competences and capabilities. In this thesis only the influence on customer satisfaction and learning exploitation of flexibility dimensions which directly add value in the customers eyes are studied to answer the followingresearch questions: “What is the impact of operational flexibility on customer satisfaction?.” What are the predictors of operational flexibility in construction industry? .These questions can only be answered after answering the questions like “Why do firms need operational flexibility?” and “how can firms achieve operational flexibility?” in the context of the construction industry. The need for construction firms to be flexible, via the effective utilization of organizational resources and capabilities for improved responsiveness, is important because of the increasing rate of changes in the business environment within which they operate. Achieving operational flexibility is also important because it has a significant correlation with a project effectiveness and hence a firm’s turnover. It is essential for academics and practitioners to recognize that the attainment of operational flexibility involves different types namely: (i) Modification (ii) new product development and (iii) demand management requires different configurations of predictors (i.e., resources, capabilities and strategies). Construction firms should consider these relationships and implement appropriate management practices for developing and configuring the right kind of resources, capabilities and strategies towards achieving different operational flexibility types.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis is concerned with development of improved management practices in indigenous chicken production systems in a research process that includes participatory approaches with smallholder farmers and other stakeholders in Kenya. The research process involved a wide range of activities that included on-station experiments, field surveys, stakeholder consultations in workshops, seminars and visits, and on-farm farmer participatory research to evaluate the effect of some improved management interventions on production performance of indigenous chickens. The participatory research was greatly informed from collective experiences and lessons of the previous activities. The on-station studies focused on hatching, growth and nutritional characteristics of the indigenous chickens. Four research publications from these studies are included in this thesis. Quantitative statistical analyses were applied and they involved use of growth models estimated with non-linear regressions for the growth characteristics, chi-square determinations to investigate differences among different reciprocal crosses of indigenous chickens and general linear models and covariance determination for the nutrition study. The on-station studies brought greater understanding of performance and production characteristics of indigenous chickens and the influence of management practices on these characteristics. The field surveys and stakeholder consultations helped in understanding the overarching issues affecting the productivity of the indigenous chickens systems and their place in the livelihoods of smallholder farmers. These activities created strong networking opportunities with stakeholders from a wide spectrum. The on-farm farmer participatory research involved selection of 200 farmers in five regions followed by training and introduction of interventions on improved management practices which included housing, vaccination, deworming and feed supplementation. Implementation and monitoring was mainly done by individual farmers continuously for close to one and half years. Six quarterly visits to the farms were made by the research team to monitor and provide support for on-going project activities. The data collected has been analysed for 5 consecutive 3-monthly periods. Descriptive and inferential statistics were applied to analyse the data collected involving treatment applications, production characteristics and flock demography characteristics. Out of the 200 farmers initially selected, 173 had records on treatment applications and flock demography characteristics while 127 farmers had records on production characteristics. The demographic analysis with a dissimilarity index of flock size produced 7 distinct farm groups from among the 173 farms. Two of these farm groups were represented in similar numbers in each of the five regions. The research process also involved a number of dissemination and communication strategies that have brought the process and project outcomes into the domain of accessibility by wider readership locally and globally. These include workshops, seminars, field visits and consultations, local and international conferences, electronic conferencing, publications and personal communication via emailing and conventional posting. A number of research and development proposals were also developed based on the knowledge and experiences gained from the research process. The thesis captures the research process activities and outcomes in 8 chapters which include in ascending order – introduction, theoretical concepts underpinning FPR, research methodology and process, on-station research output, FPR descriptive statistical analysis, FPR inferential statistical analysis on production characteristics, FPR demographic analysis and conclusions. Various research approaches both quantitative and qualitative have been applied in the research process indicating the possibilities and importance of combining both systems for greater understanding of issues being studied. In our case, participatory studies of the improved management of indigenous chickens indicates their potential importance as livelihood assets for poor people.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project management (PM) is a globally recognized discipline and has been widely adopted within the construction industry. Despite advancements in the PM discipline, the ineffective traditional management system, typical of the non-executive PM structure, is still widely used in the Nigerian construction industry. The aim of this paper is thus to explore the challenges facing the adoption of the executive PM structure in Nigeria. The paper first assesses the level of growth of PM in Nigeria using UK best practices as a benchmark and identifies the key PM characteristics in the two countries. Focus group interviews were used to collect the primary data for the study and content analysis was used to present the results in a thematic format. The study revealed the key barriers to the adoption of an executive PM structure in Nigeria as a lack of proper awareness, unfavorable policies, skill shortages, the traditional culture of stakeholders and the absence of a regulatory body. It is recommended that the government, as a major player/client in the Nigerian construction industry, should lead the campaign to change the traditional industry approach to project management. This is necessary if construction stakeholders in Nigeria are to be educated and encouraged towards adopting and putting into practice effective PM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The global marketplace is rapidly intensifying. Longer product sales lives, greater profit margins or simply survival, is dependent on management¿s ability to create and lead change. Project Management has become an important competency, combined with other business practices to adapt to the trend of changing conditions. Critical Chain is a relatively new project methodology, elaborated by Eliyahu Goldratt in order to complete projects faster, make more efficient use of resources and securing the project deliverables. The methodology is based on the assumption that traditional project techniques such as CPM and PERT, do not recognize critical human behavior. The methodology claims that many project failures are a direct result of how safety is built into the task delivery times, and then wasted by human behavior such as Student Syndrome, Parkinson Law and Multitasking. However, there has been little or no previous research regarding this topic in the Argentine marketplace. This study intended to investigate to what extent the human behavior concepts of critical chain project management are present, by performing in-depth interviews with Argentine project stakeholders. It appears that the four human behavior concepts are present in Argentina and that the majority of Argentine companies are yet to apply project management techniques.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study aimed to evaluate the risk of Aedes aegypti proliferation in structures used in compensatory techniques for urban drainage (Best Management PracticesBMPs). These drainage structures are utilised to reduce flood peaks due to surface runoff, and they have been used in many countries. However, many of these structures have been designed to keep water surfaces exposed for a certain period of time, depending on the type of project. Exposed water surfaces may become an ideal environment for A. aegypti proliferation in tropical and subtropical areas where the rainy season occurs during the summer. Thus, data regarding the mosquito life cycle, consecutive rainfall pattern and emptying time of these structures were collected. A comparison of these data led to the evaluation of the associated risk of A. aegypti proliferation in BMP structures. The risk of mosquito proliferation ranged from 1.1% to 3.3%, depending on the rainfall pattern, A. aegypti life cycle phase and BMP activity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Regime shifts, defined as a radical and persistent reconfiguration of an ecosystem following a disturbance, have been acknowledged by scientists as a very important aspect of the dynamic of ecosystems. However, their consideration in land management planning remains marginal and limited to specific processes and systems. Current research focuses on mathematical modeling and statistical analysis of spatio-temporal data for specific environmental variables. These methods do not fulfill the needs of land managers, who are confronted with a multitude of processes and pressure types and require clear and simple strategies to prevent regime shift or to increase the resilience of their environment. The EU-FP7 CASCADE project is looking at regime shifts of dryland ecosystems in southern Europe and specifically focuses on rangeland and forest systems which are prone to various land degradation threats. One of the aims of the project is to evaluate the impact of different management practices on the dynamic of the environment in a participatory manner, including a multi-stakeholder evaluation of the state of the environment and of the management potential. To achieve this objective we have organized several stakeholder meetings and we have compiled a review of management practices using the WOCAT methodology, which enables merging scientific and land users knowledge. We highlight here the main challenges we have encountered in applying the notion of regime shift to real world socio-ecological systems and in translating related concepts such as tipping points, stable states, hysteresis and resilience to land managers, using concrete examples from CASCADE study sites. Secondly, we explore the advantages of including land users’ knowledge in the scientific understanding of regime shifts. Moreover, we discuss useful alternative concepts and lessons learnt that will allow us to build a participatory method for the assessment of resilient management practices in specific socio-ecological systems and to foster adaptive dryland management.