785 resultados para Project 2004-032-A : Construction Industry Business Environment (CIBE)
Resumo:
This thesis was carried out as a case study of a company YIT in order to clarify the sev-erest risks for the company and to build a method for project portfolio evaluation. The target organization creates new living environment by constructing residential buildings, business premises, infrastructure and entire areas worth for EUR 1.9 billion in the year 2013. Company has noted project portfolio management needs more information about the structure of project portfolio and possible influences of market shock situation. With interviews have been evaluated risks with biggest influence and most appropriate metrics to examine. The major risks for the company were evaluated by interviewing the executive staff. At the same time, the most appropriate risk metrics were considered. At the moment sales risk was estimated to have biggest impact on company‟s business. Therefore project port-folio evaluation model was created and three different scenarios for company‟s future were created in order to identify the scale of possible market shock situation. The created model is tested with public and descriptive figures of YIT in a one-year-long market shock and the impact on different metrics was evaluated. Study was conducted using con-structive research methodology. Results indicate that company has notable sales risk in certain sections of business portfolio.
Resumo:
Internationalization represents a complex topic that has been researched for quite some time. However, since it continues to be extremely current a topic, its significance has not diminished, but maybe even increased in importance. Companies today face extreme pressure to enter new markets in the hope of growing, becoming more profitable, increasing market share, attracting new customers and meeting the requirements of its share- and stakeholders. In the increasingly global business environment of today, companies are facing both challenges and possible advantages of internationalization. Few companies are not operating internationally and it is becoming the question of ‘Why not?’ rather than ‘Why?’ to internationalize business operations. Internationalization and the importance of strategy are discussed in this research from the viewpoint of three case companies that were interviewed about internationalization strategies. This research project is a qualitative study that answers the research question of How is a business strategy constructed for entering a new market? The sub-questions are • How are goals set and what indicators are used to monitor the achievement of these goals? • What are the key characteristics of a strategy implementation process? The research method chosen for this study is a multiple-case study. Three case companies were chosen for the interviews in order to gain in-depth data of internationalization strategies within the construction industry.
Resumo:
The construction industry has long been considered as highly fragmented and non-collaborative industry. This fragmentation sprouted from complex and unstructured traditional coordination processes and information exchanges amongst all parties involved in a construction project. This nature coupled with risk and uncertainty has pushed clients and their supply chain to search for new ways of improving their business process to deliver better quality and high performing product. This research will closely investigate the need to implement a Digital Nervous System (DNS), analogous to a biological nervous system, on the flow and management of digital information across the project lifecycle. This will be through direct examination of the key processes and information produced in a construction project and how a DNS can provide a well-integrated flow of digital information throughout the project lifecycle. This research will also investigate how a DNS can create a tight digital feedback loop that enables the organisation to sense, react and adapt to changing project conditions. A Digital Nervous System is a digital infrastructure that provides a well-integrated flow of digital information to the right part of the organisation at the right time. It provides the organisation with the relevant and up-to-date information it needs, for critical project issues, to aid in near real-time decision-making. Previous literature review and survey questionnaires were used in this research to collect and analyse data about information management problems of the industry – e.g. disruption and discontinuity of digital information flow due to interoperability issues, disintegration/fragmentation of the adopted digital solutions and paper-based transactions. Results analysis revealed efficient and effective information management requires the creation and implementation of a DNS.
Resumo:
The Indian Petroleum Industry is passing through a very dynamic business environment due to liberalization. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered as one of the means for remaining competitive but these practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the specific causes of project failure by demonstrating first the characteristics of projects in Indian Petroleum industry and suggests some remedial measures for resolving these issues. The suggested project management model is integrated through information management system and demonstrated through a case study.
Resumo:
During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).
Resumo:
During the recent years followed by the Global Financial Crisis (GFC), most of business and industries around the globe have been hardly hit to the limit that it still struggling to survive, suffering from the crisis financial consequences. For instance, in the construction industry; many construction projects have been suspended or totally cancelled. Nevertheless, among this dilemma, a call has been raised to use the sustainable practices to mitigate the effects of the GFC on construction industry. For the first look, it seems that there is contradiction since the sustainable solutions are often associated with an increase in the initial cost, undoubtedly, the sustainable practices have many advantages in both economic and environment aspects, however, the question which needs to be addressed here is, to what extent using such sustainable practices can mitigate the negative effects of the economic downturn on construction industry. Therefore, it is a challenging argument for using such sustainable construction from its economic perspective, however, this paper is aiming to present the economical benefits of sustainable practices in construction industry, and trying to clear the doubt of the high initial costs of the sustainable construction through studying the life cycle benefit of green building.
Resumo:
This Master´s thesis illustrates how growing a business ties up the company´s working capital and what the cost of committed capital. In order to manage a company´s working capital in rapid business growth phase, the thesis suggests that by monitoring and managing the operating and cash conversion cycles of customers´ projects, a company can find ways to secure the required amount of capital. The research method of this thesis was based on literature reviews and case study research. The theoretical review presents the concepts of working capital and provides the background for understanding how to improve working capital management. The company in subject is a global small and medium-sized enterprise that manufactures pumps and valves for demanding process conditions. The company is expanding, which creates lots of challenges. This thesis concentrates to the company´s working capital management and its efficiency through the supply chain and value chain perspective. The main elements of working capital management are inventory management, accounts receivable management and accounts payable management. Prepayments also play a significant role, particularly in project-based businesses. Developing companies´ working capital management requires knowledge from different kind of key operations´ in the company, like purchasing, production, sales, logistics and financing. The perspective to develop and describe working capital management is an operational. After literature reviews the thesis present pilot projects that formed the basis of a model to monitor working capital in the case company. Based on analysis and pilot projects, the thesis introduces a rough model for monitoring capital commitments in short time period. With the model the company can more efficiently monitor and manage their customer projects.
Resumo:
The aim of this study is to investigate the role of operational flexibility for effective project management in the construction industry. The specific objectives are to: a) Identify the determinants of operational flexibility potential in construction project management b) Investigate the contribution of each of the determinants to operational flexibility potential in the construction industry c) Investigate on the moderating factors of operational flexibility potential in a construction project environment d) Investigate whether moderated operational flexibility potential mediates the path between predictors and effective construction project management e) Develop and test a conceptual model of achieving operational flexibility for effective project management The purpose of this study is to findout ways to utilize flexibility inorder to manage uncertain project environment and ultimately achieve effective project management. In what configuration these operational flexibility determinants are demanded by construction project environment in order to achieve project success. This research was conducted in three phases, namely: (i) exploratory phase (ii) questionnaire development phase; and (iii) data collection and analysis phase. The study needs firm level analysis and therefore real estate developers who are members of CREDAI, Kerala Chapter were considered. This study provides a framework on the functioning of operational flexibility, offering guidance to researchers and practitioners for discovering means to gain operational flexibility in construction firms. The findings provide an empirical understanding on kinds of resources and capabilities a construction firm must accumulate to respond flexibly to the changing project environment offering practitioners insights into practices that build firms operational flexibility potential. Firms are dealing with complex, continuous changing and uncertain environments due trends of globalization, technical changes and innovations and changes in the customers’ needs and expectations. To cope with the increasingly uncertain and quickly changing environment firms strive for flexibility. To achieve the level of flexibility that adds value to the customers, firms should look to flexibility from a day to day operational perspective. Each dimension of operational flexibility is derived from competences and capabilities. In this thesis only the influence on customer satisfaction and learning exploitation of flexibility dimensions which directly add value in the customers eyes are studied to answer the followingresearch questions: “What is the impact of operational flexibility on customer satisfaction?.” What are the predictors of operational flexibility in construction industry? .These questions can only be answered after answering the questions like “Why do firms need operational flexibility?” and “how can firms achieve operational flexibility?” in the context of the construction industry. The need for construction firms to be flexible, via the effective utilization of organizational resources and capabilities for improved responsiveness, is important because of the increasing rate of changes in the business environment within which they operate. Achieving operational flexibility is also important because it has a significant correlation with a project effectiveness and hence a firm’s turnover. It is essential for academics and practitioners to recognize that the attainment of operational flexibility involves different types namely: (i) Modification (ii) new product development and (iii) demand management requires different configurations of predictors (i.e., resources, capabilities and strategies). Construction firms should consider these relationships and implement appropriate management practices for developing and configuring the right kind of resources, capabilities and strategies towards achieving different operational flexibility types.
Resumo:
In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.
Resumo:
In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new, ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply, chain from clients to consultants, contractors, subcontractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, bused on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with,with tendering are highly variable, 1-15%, depending upon what precisely, is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.
Resumo:
Project management (PM) is a globally recognized discipline and has been widely adopted within the construction industry. Despite advancements in the PM discipline, the ineffective traditional management system, typical of the non-executive PM structure, is still widely used in the Nigerian construction industry. The aim of this paper is thus to explore the challenges facing the adoption of the executive PM structure in Nigeria. The paper first assesses the level of growth of PM in Nigeria using UK best practices as a benchmark and identifies the key PM characteristics in the two countries. Focus group interviews were used to collect the primary data for the study and content analysis was used to present the results in a thematic format. The study revealed the key barriers to the adoption of an executive PM structure in Nigeria as a lack of proper awareness, unfavorable policies, skill shortages, the traditional culture of stakeholders and the absence of a regulatory body. It is recommended that the government, as a major player/client in the Nigerian construction industry, should lead the campaign to change the traditional industry approach to project management. This is necessary if construction stakeholders in Nigeria are to be educated and encouraged towards adopting and putting into practice effective PM.
Resumo:
O Mercado Acionário Americano evoluiu rapidamente na última década. Este tornou-se uma arquitetura aberta em que participantes com tecnologia inovadora podem competir de forma eficaz. Várias mudanças regulatórias e inovações tecnológicas permitiram mudanças profundas na estrutura do mercado. Essas mudanças, junto com o desenvolvimento tecnológico de redes de alta velocidade, agiu como um catalisador, dando origem a uma nova forma de negociação, denominada Negociação em Alta Frequência (HFT). As empresas de HFT surgiram e se apropriaram em larga escala do negócio de formação de mercado, no fornecimento de liquidez. Embora HFT tem crescido massivamente, ao longo dos últimos quatro anos, HFT perdeu rentabilidade significativamente, uma vez que mais empresas aderiram ao setor reduzindo as margens. Portanto, diante deste contexto, esta tese buscou apresentar uma breve revisão sobre a atividade de HFT, seguida de uma análise dos limites deste setor, bem como, das características do macroambiente do HFT. Para tanto, a tese realizou uma extensa revisão do histórico literário, documentos públicos qualitativos, tais como, jornais, atas de reunião e relatórios oficiais. A tese empregou um ferramental de análise, Barreiras de Entrada e Mobilidade (Porter, 1980); Modelos de Evolução Setorial (McGahan, 2004); Estrutura do Setor de Informação Intensiva (Sampler, 1998), para analisar os limites do setor de HFT. Adicionalmente, empregou as ferramentas de análise, Modelos de Evolução Setorial (McGahan, 2004) e PESTEL (JOHNSON, SCHOLES, and WHITTINGTON, 2011), para analisar o setor e o contexto que envolve o negócio de HFT. A análise concluiu que as empresas que empregam HFT para atuar e competir no mercado acionário, compoem um setor independente.
Resumo:
Lithographed.