998 resultados para Planning Controls


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The National Housing and Planning Advice Unit commissioned Professor Michael Ball of Reading University to undertake empirical research into how long it was taking to obtain planning consent for major housing sites in England. The focus on sites as opposed to planning applications is important because it is sites that generate housing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is growing international interest in the impact of regulatory controls on the supply of housing The UK has a particularly restrictive planning regime and a detailed and uncertain process of development control linked to it. This paper presents the findings of empirical research on the time taken to gain planning permission for selected recent major housing projects from a sample of local authorities in southern England. The scale of delay found was far greater than is indicated by average official data measuring the extent to which local authorities meet planning delay targets. Hedonic analysis indicated that there is considerable variation in time it takes local authorities to process planning applications, with the worst being four times slower than the best. Smaller builders and housing association developments are processed more quickly than those of large developers and small sites appear to be particularly time intensive. These results suggest that delays in development control may be a significant contributory factor to the low responsiveness of UK housing supply to upturns in market activity.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The privatization of major Australian airports in the late 1990s unleashed an unprecedented development wave as corporate lessees implemented ambitious business plans. While planning and environmental regulations governing on-airport development were significantly enhanced, there has been national disquiet about a governance regime that remains under the auspices of the federal government and is not effectively integrated into state and local decision-making machinery. Tensions in major airport regions have been exacerbated by the building of highly conspicuous non-aeronautical developments approved with no determining input by local decision-makers as well as the growing pressures on off-airport locations for aviation-related development. This paper canvasses this context and overviews the evolving structure of planning controls for Australia’s privatized federal airports. A range of issues surfacing through the National Aviation Policy Review process in 2008–2009 is described.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

At one level the urban landscapes of South Florida and South East Queensland look quite similar. However at another level the context of planning and planning control and regulation is quite different. To understand the contextual differences between South Florida and South East Queensland, four themes will be used, some of which were based on Cullingworth and Booth. The four themes include: demography, governance, the law and regulatory philosophy. After having evaluated South Florida and South East Queensland across these four themes, we propose a framework for examining whether these differences have shaped planning outcomes and in particular, the built form.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

There is a popular view that land use planning regulations (‘planning’) is hostile to both development and the development industry. Part of the reason for the prominence of this view is the homogenising of the notion of ‘planning’ and its reduction to development control. This paper argues that panning controls in the UK are far more sophisticated and, drawing upon empirical evidence of key property interests proposes a more complex and nuanced view of planning controls that, in large part, has the support of the developers and others.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Dentro del campo de la ciudad como lugar se analiza el concepto de planificación territorial y planeamiento espacial. Flooding is one of the main risks associated to many urban settlements in Spain and, indeed, elsewhere. The location of cities has traditionally ignored this type of risk as other locational criteria prevailed (communications, crop yields, etc.). Defence engineering has been the customary way to offset the risk but, nowadays, the opportunity costs of engineering works in urban areas has highlighted the interest of “soft measures” based on prevention. Early warning systems plus development planning controls rank among the most favoured ones. This paper reflects the results of a recent EU-financed research project on alternative measures geared to the enhancement of urban resilience against flooding. A city study in Spain is used as example of those measures.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

As global populations grow, cities are stretching their urban boundaries into rural areas and bringing the challenges of biodiversity conservation into the backyards of homeowners. Planning controls can attempt to regulate residents’ behaviours to support conservation actions for threatened species but need to consider whether community attitudes align with conservation objectives. This study investigated community attitudes towards planned management interventions in a new conservation strategy designed to protect endangered Southern Brown Bandicoots in new residential estates around Cranbourne, Australia. A survey (n = 318, response rate 15.2 per cent) investigated current resident attitudes towards bandicoot conservation, cat ownership and effectiveness of current planning controls. Results indicate community support for a range of bandicoot conservation actions including confinement of domestic cats and non-lethal cat controls and for new developments being cat-free with bandicoot habitat corridors. Awareness of bandicoots correlated with higher support for conservation actions while cat owners were less supportive overall, particularly to limitations on cat ownership. Potential barriers to management interventions include inadequate knowledge, perceived associated risks and housing turnover. This information is valuable for conservation planning for new developments and to improve implementation of planning controls in existing residential areas for delivery of long-term protection for threatened species like Southern Brown Bandicoots.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

PROBLEM Cost of delivering medium density apartments impedes supply of new and more affordable housing in established suburbs EXISTING FOCUS - Planning controls - Construction costs, esp labour - Regulation eg sustainability

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In analysing the release of agricultural land to urban development, the urban fringe literature has not focused on whether farmers are able to relocate from the urban fringe to remoter rural areas. Through interviews with representatives from the poultry industry in two Australian states, this paper identifies that poultry farm relocation strategies are constrained by off-farm economic relations, the land-use planning system and financial considerations. Closely aligned to these constraints on relocation is the on-going process of poultry farm intensification, which is seen as presenting rising problems for land-use management around expanding metropolitan centres in Australia. Of particular concern is the potential for amenity complaints and associated land-use conflicts, which have not been comprehensively investigated. Recognising that existing environmental and land-use planning controls are ineffective in producing amicable solutions when conflict involving poultry farming is at its most intense, the paper calls for improvements to the regulatory system, including greater consideration for how the process of relocation can be encouraged. (c) 2005 Elsevier Ltd. All rights reserved.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A growing number of software development projects successfully exhibit a mix of agile and traditional software development methodologies. Many of these mixed methodologies are organization specific and tailored to a specific project. Our objective in this research-in-progress paper is to develop an artifact that can guide the development of such a mixed methodology. Using control theory, we design a process model that provides theoretical guidance to build a portfolio of controls that can support the development of a mixed methodology for software development. Controls, embedded in methods, provide a generalizable and adaptable framework for project managers to develop their mixed methodology specific to the demands of the project. A research methodology is proposed to test the model. Finally, future directions and contributions are discussed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Motion planning, or trajectory planning, commonly refers to a process of converting high-level task specifications into low-level control commands that can be executed on the system of interest. For different applications, the system will be different. It can be an autonomous vehicle, an Unmanned Aerial Vehicle(UAV), a humanoid robot, or an industrial robotic arm. As human machine interaction is essential in many of these systems, safety is fundamental and crucial. Many of the applications also involve performing a task in an optimal manner within a given time constraint. Therefore, in this thesis, we focus on two aspects of the motion planning problem. One is the verification and synthesis of the safe controls for autonomous ground and air vehicles in collision avoidance scenarios. The other part focuses on the high-level planning for the autonomous vehicles with the timed temporal constraints. In the first aspect of our work, we first propose a verification method to prove the safety and robustness of a path planner and the path following controls based on reachable sets. We demonstrate the method on quadrotor and automobile applications. Secondly, we propose a reachable set based collision avoidance algorithm for UAVs. Instead of the traditional approaches of collision avoidance between trajectories, we propose a collision avoidance scheme based on reachable sets and tubes. We then formulate the problem as a convex optimization problem seeking control set design for the aircraft to avoid collision. We apply our approach to collision avoidance scenarios of quadrotors and fixed-wing aircraft. In the second aspect of our work, we address the high level planning problems with timed temporal logic constraints. Firstly, we present an optimization based method for path planning of a mobile robot subject to timed temporal constraints, in a dynamic environment. Temporal logic (TL) can address very complex task specifications such as safety, coverage, motion sequencing etc. We use metric temporal logic (MTL) to encode the task specifications with timing constraints. We then translate the MTL formulae into mixed integer linear constraints and solve the associated optimization problem using a mixed integer linear program solver. We have applied our approach on several case studies in complex dynamical environments subjected to timed temporal specifications. Secondly, we also present a timed automaton based method for planning under the given timed temporal logic specifications. We use metric interval temporal logic (MITL), a member of the MTL family, to represent the task specification, and provide a constructive way to generate a timed automaton and methods to look for accepting runs on the automaton to find an optimal motion (or path) sequence for the robot to complete the task.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Australia is rich in renewable energy resources such as wind, solar and geothermal. Geographical diversity of these renewable resources combined with developing climate change policies poses a great challenge for the long term interconnection planning. Intermittency of wind and solar potentially driving the development of new transmission lines bring additional complexity to power system operations and planning. This paper provides an overview of generation and transmission planning studies in Australia to meet 20% renewable energy target by 2020. Appraisal of the effectiveness of dispersed energy storage, non schedulable peaking plants, wide area controls and demand management techniques to aid the penetration of renewables is presented in this paper

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Debate about the relationships between business planning and performance has been active for decades (Bhidé, 2000; Mintzberg, 1994). While results have been inconclusive, this topic still strongly divides the research community (Brinckmann et al., 2010; Chwolka & Raith, 2011; Delmar & Shane, 2004; Frese, 2009; Gruber, 2007; Honig & Karlsson, 2004). Previous research explored the relationships between innovation and the venture creation process (Amason et al., 2006, Dewar & Dutton, 1986; Jennings et al., 2009). However, the relationships between business planning and innovation have mostly been invoked indirectly in the strategy and entrepreneurship literatures through the notion of uncertainty surrounding the development of innovation. Some posited that planning may be irrelevant due to the iterative process, the numerous changes innovation development entails and the need to be flexible (Brews & Hunt, 1999). Others suggested that planning may facilitate the achievement of goals and overcoming of obstacles (Locke and Latham, 2000), guide the venture in its allocation of resources (Delmar and Shane, 2003) and help to foster the communication about the innovation being developed (Liao & Welsh, 2008). However, the nature and extents of the relationships between business planning, innovation and performance are still largely unknown. Moreover, if the reasons why ventures should engage (Frese, 2009) –or not- (Honig, 2004) in business planning have been investigated quite extensively (Brinckmann et al., 2010), the specific value of business planning for nascent firms developing innovation is still unclear. The objective of this paper is to shed some light on these important aspects by investigating the two following questions on a large sample of random nascent firms: 1) how is business planning use over time by new ventures developing different types and degrees of innovation? 2) how do business planning and innovation impact the performance of the nascent firms? Methods & Key propositions This PSED-type study draws its data from the first three waves of the CAUSEE project where 30,105 Australian households were randomly contacted by phone using a methodology to capture emerging firms (Davidsson, Steffens, Gordon, Reynolds, 2008). This screening led to the identification of 594 nascent ventures (i.e., firms that were not operating yet at the time of the identification) that were willing to participate in the study. Comprehensive phone interviews were conducted with these 594 ventures. Likewise, two comprehensive follow-ups were organised 12 months and 24 months later where 80% of the eligible cases of the previous wave completed the interview. The questionnaire contains specific sections investigating business plans such as: presence or absence, degree of formality and updates of the plan. Four types of innovation are measured along three degrees of intensity to produce a comprehensive continuous measure ranging from 0 to 12 (Dahlqvist & Wiklund, 2011). Other sections informing on the gestation activities, industry and different types of experiences will be used as controls to measure the relationships and the impacts of business planning and innovation on the performance of nascent firms overtime. Results from two rounds of pre-testing informed the design of the instrument included in the main survey. The three waves of data are used to first test and compare the use of planning amongst nascent firms by their degrees of innovation and then to examine their impact on performance overtime through regression analyses. Results and Implications Three waves of data collection have been completed. Preliminary results show that on average, innovative firms are more likely to have a business plans than their low innovative counterpart. They are also most likely to update their plan suggesting a more continuous use of the plan over time than previously thought. Further analyses regarding the relationships between business planning, innovation and performance are undergoing. This paper is expected to contribute to the literature on business planning and innovation by measuring quantitatively their impact on nascent firms activities and performance at different stages of their development. In addition, this study will shed a new light on the business planning-performance relationship by disentangling plans, types of nascent firms regarding their innovation degres and their performance over time. Finally, we expect to increase the understanding of the venture creation process by analysing those questions on nascent firms from a large longitudinal sample of randomly selected ventures. We acknowledge the results from this study will be preliminary and will have to be interpreted with caution as the business planning-performance is not a straightforward relationship (Brinckmann et al., 2010). Meanwhile, we believe that this study is important to the field of entrepreneurship as it provides some much needed insights on the processes used by nascent firms during their creation and early operating stages.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Most previous work on artificial curiosity (AC) and intrinsic motivation focuses on basic concepts and theory. Experimental results are generally limited to toy scenarios, such as navigation in a simulated maze, or control of a simple mechanical system with one or two degrees of freedom. To study AC in a more realistic setting, we embody a curious agent in the complex iCub humanoid robot. Our novel reinforcement learning (RL) framework consists of a state-of-the-art, low-level, reactive control layer, which controls the iCub while respecting constraints, and a high-level curious agent, which explores the iCub's state-action space through information gain maximization, learning a world model from experience, controlling the actual iCub hardware in real-time. To the best of our knowledge, this is the first ever embodied, curious agent for real-time motion planning on a humanoid. We demonstrate that it can learn compact Markov models to represent large regions of the iCub's configuration space, and that the iCub explores intelligently, showing interest in its physical constraints as well as in objects it finds in its environment.