970 resultados para Performance standards
Resumo:
Shipping list no.: 91-0049-p.
Resumo:
Shipping list no.: 89-334-P.
Resumo:
National Highway Safety Bureau, Washington, D.C.
Resumo:
"November 1991"--Vol. 3.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
"The objective of the project was to develop methods for establishing output and input performance standards for the placement and placement-support functions of the United States Employment Service (ES)."
Resumo:
"November 1985."
Resumo:
Juvenile delinquency proceedings in the South Carolina Family Court are fundamentally different than adult criminal cases. Judges are charged by the South Carolina Code of Laws with acting in the “best interests of the child,” this emphasis on the rehabilitation of the child contrasts with the more punitive model used by the adult criminal justice system. The standards listed in the document aim to provide guidance to appointed counsel in juvenile matters with particular emphasis on the distinctive requirements of the South Carolina juvenile justice system.
Resumo:
Juvenile delinquency proceedings in the South Carolina Family Court are fundamentally different than adult criminal cases. Judges are charged by the South Carolina Code of Laws with acting in the “best interests of the child,” this emphasis on the rehabilitation of the child contrasts with the more punitive model used by the adult criminal justice system. The standards listed in the document aim to provide guidance to appointed counsel in juvenile matters with particular emphasis on the distinctive requirements of the South Carolina juvenile justice system.
Resumo:
Performance standards for Positron emission tomography (PET) were developed to be able to compare systems from different generations and manufacturers. This resulted in the NEMA methodology in North America and the IEC in Europe. In practices, the NEMA NU 2- 2001 is the method of choice today. These standardized methods allow assessment of the physical performance of new commercial dedicated PET/CT tomographs. The point spread in image formation is one of the factors that blur the image. The phenomenon is often called the partial volume effect. Several methods for correcting for partial volume are under research but no real agreement exists on how to solve it. The influence of the effect varies in different clinical settings and it is likely that new methods are needed to solve this problem. Most of the clinical PET work is done in the field of oncology. The whole body PET combined with a CT is the standard investigation today in oncology. Despite the progress in PET imaging technique visualization, especially quantification of small lesions is a challenge. In addition to partial volume, the movement of the object is a significant source of error. The main causes of movement are respiratory and cardiac motions. Most of the new commercial scanners are in addition to cardiac gating, also capable of respiratory gating and this technique has been used in patients with cancer of the thoracic region and patients being studied for the planning of radiation therapy. For routine cardiac applications such as assessment of viability and perfusion only cardiac gating has been used. However, the new targets such as plaque or molecular imaging of new therapies require better control of the cardiac motion also caused by respiratory motion. To overcome these problems in cardiac work, a dual gating approach has been proposed. In this study we investigated the physical performance of a new whole body PET/CT scanner with NEMA standard, compared methods for partial volume correction in PET studies of the brain and developed and tested a new robust method for dual cardiac-respiratory gated PET with phantom, animal and human data. Results from performance measurements showed the feasibility of the new scanner design in 2D and 3D whole body studies. Partial volume was corrected, but there is no best method among those tested as the correction also depends on the radiotracer and its distribution. New methods need to be developed for proper correction. The dual gating algorithm generated is shown to handle dual-gated data, preserving quantification and clearly eliminating the majority of contraction and respiration movement
Resumo:
Introduction. Selectively manned units have a long, international history, both military and civilian. Some examples include SWAT teams, firefighters, the FBI, the DEA, the CIA, and military Special Operations. These special duty operators are individuals who perform a highly skilled and dangerous job in a unique environment. A significant amount of money is spent by the Department of Defense (DoD) and other federal agencies to recruit, select, train, equip and support these operators. When a critical incident or significant life event occurs, that jeopardizes an operator's performance; there can be heavy losses in terms of training, time, money, and potentially, lives. In order to limit the number of critical incidents, selection processes have been developed over time to “select out” those individuals most likely to perform below desired performance standards under pressure or stress and to "select in" those with the "right stuff". This study is part of a larger program evaluation to assess markers that identify whether a person will fail under the stresses in a selectively manned unit. The primary question of the study is whether there are indicators in the selection process that signify potential negative performance at a later date. ^ Methods. The population being studied included applicants to a selectively manned DoD organization between 1993 and 2001 as part of a unit assessment and selection process (A&S). Approximately 1900 A&S records were included in the analysis. Over this nine year period, seventy-two individuals were determined to have had a critical incident. A critical incident can come in the form of problems with the law, personal, behavioral or family problems, integrity issues, and skills deficit. Of the seventy-two individuals, fifty-four of these had full assessment data and subsequent supervisor performance ratings which assessed how an individual performed while on the job. This group was compared across a variety of variables including demographics and psychometric testing with a group of 178 individuals who did not have a critical incident and had been determined to be good performers with positive ratings by their supervisors.^ Results. In approximately 2004, an online pre-screen survey was developed in the hopes of preselecting out those individuals with items that would potentially make them ineligible for selection to this organization. This survey has aided the organization to increase its selection rates and save resources in the process. (Patterson, Howard Smith, & Fisher, Unit Assessment and Selection Project, 2008) When the same prescreen was used on the critical incident individuals, it was found that over 60% of the individuals would have been flagged as unacceptable. This would have saved the organization valuable resources and heartache.^ There were some subtle demographic differences between the two groups (i.e. those with critical incidents were almost twice as likely to be divorced compared with the positive performers). Upon comparison of Psychometric testing several items were noted to be different. The two groups were similar when their IQ levels were compared using the Multidimensional Aptitude Battery (MAB). When looking at the Minnesota Multiphasic Personality Inventory (MMPI), there appeared to be a difference on the MMPI Social Introversion; the Critical Incidence group scored somewhat higher. When analysis was done, the number of MMPI Critical Items between the two groups was similar as well. When scores on the NEO Personality Inventory (NEO) were compared, the critical incident individuals tended to score higher on Openness and on its subscales (Ideas, Actions, and Feelings). There was a positive correlation between Total Neuroticism T Score and number of MMPI critical items.^ Conclusions. This study shows that the current pre-screening process is working and would have saved the organization significant resources. ^ If one was to develop a profile of a candidate who potentially could suffer a critical incident and subsequently jeopardize the unit, mission and the safety of the public they would look like the following: either divorced or never married, score high on the MMPI in Social Introversion, score low on MMPI with an "excessive" amount of MMPI critical items; and finally scores high on the NEO Openness and subscales Ideas, Feelings, and Actions.^ Based on the results gleaned from the analysis in this study there seems to be several factors, within psychometric testing, that when taken together, will aid the evaluators in selecting only the highest quality operators in order to save resources and to help protect the public from unfortunate critical incidents which may adversely affect our health and safety.^
Resumo:
EXECUTIVE SUMMARY All observers agree that energy efficiency must be the cornerstone of any serious EU energy strategy. In this general context, the EU building sector is critical. It represents about 40% of EU final energy consumption (residential houses, public/private offices, commercial buildings, etc.) and approximately 36% of EU CO2 emissions. This is massive. The EU has certainly not been inactive in this field. The Energy Performance in Buildings Directive 2002/91/EC (EPBD) was the first and the main instrument to address the problem of the energy performance of buildings. It has established numerous principles: a reliable methodology which enables the calculation and rating of the energy performance of buildings; minimum energy performance standards for new buildings and existing buildings under major renovation; energy performance certificates; regular inspection of heating and air-conditioning systems; and, finally, quality standards for inspections and energy performance certificates. They were strengthened in 2010 by the recast Directive 2010/31/EU. This directive also introduces a decisive concept for the development of the building sector: ‘nearly zeroenergy buildings’. In 2012, the new Energy Efficiency Directive 2012/27/EU dealt with other aspects. In the building sector, three of them are particularly important. They concern: (1) the establishment of long-term strategies for mobilizing investment in the renovation of the national building stocks; (2) the introduction of energy saving schemes for ‘designated’ energy companies with a view to reducing consumption among ‘final consumers’ by 1.5% annually; and (3), as an option, the setting up of an Energy Efficiency National Fund to support energy efficiency initiatives. This paper also briefly examines the different instruments put in place to disseminate information and consultation, and the EU funding for energy efficiency in buildings. Results, however, have remained limited until now. The improvement of the energy performance of buildings and the rhythm of renovation remain extremely weak. Member States’ unwillingness to timely and properly transpose and implement the Directives continues despite the high degree of flexibility permitted. The decentralized approach chosen for some specific aspects and the differentiation in the application of EPBD standards between Member States do not appear optimal either. Adequate financial schemes remain rare. The permanent deficit of qualified and trained personnel and the inertia of public authorities to make the public understand the stakes in this domain remain problematic. Hence the need to take new initiatives to reap the benefits that the building sector is meant to bring.
Resumo:
"March 1982."
Resumo:
"December 1988."